• 제목/요약/키워드: operator action

검색결과 96건 처리시간 0.022초

Assessment of Leak Detection Capability of CANDU 6 Annulus Gas System Using Moisture Injection Tests

  • Nho, Ki-Man;Kim, Wang-Bae;Sim, Woo-Gun
    • Nuclear Engineering and Technology
    • /
    • 제30권5호
    • /
    • pp.403-415
    • /
    • 1998
  • The CANDU 6 reactor assembly consists of an array of 380 pressure tubes, which are installed horizontally in a large cylindrical vessel, the Calandria, containing the low pressure heavy water moderator. The pressure tube is located inside the calandria tube and the annulus between these tubes, which forms a closed loop with $CO_2$ gas recirculating, is called the Annulus Gas System(AGS). It is designed to give an alarm to the operator even for a small pressure tube leak by a very sensitive dew point meter so that he can take a preventive action for the pressure tube rupture incident. To judge whether the operator action time is enough or not in the design of Wolsong 2,3 & 4, the Leak Before Break(LBB) assessment is required for the analysis of the pressure tube failure accident. In order to provide the required data for the LBB assessment of Wolsong Units 2, 3, 4, a series of leak detection capability tests was performed by injecting controlled rates of heavy water vapour. The data of increased dew point and rates of rise were measured to determine the alarm set point for the dew point rate of rise of Wolsong Unit 2. It was found that the response of the dew point depends on the moisture injection rate, $CO_2$ gas flow rate and the leak location. The test showed that CANDU 6 AGS can detect the very small leaks less than few g/hr and dew point rate of rise alarm can be the most reliable alarm signal to warn the operator. Considering the present results, the first response time of dew point to the AGS $CO_2$ flow rate is approximated.

  • PDF

OPR1000형 원전의 최종열제거원 상실사고 대처전략 및 운전원 조치 시간에 따른 열수력 거동 분석 (Thermal-hydraulic Analysis of Operator Action Time on Coping Strategy of LUHS Event for OPR1000)

  • 송준규
    • 한국안전학회지
    • /
    • 제35권5호
    • /
    • pp.121-127
    • /
    • 2020
  • Since the Fukushima nuclear accident in 2011, the public were concerned about the safety of Nuclear Power Plants (NPPs) in extreme natural disaster situations, such as earthquakes, flooding, heavy rain and tsunami, have been increasing around the world. Accordingly, the Stress Test was conducted in Europe, Japan, Russia, and other countries by reassessing the safety and response capabilities of NPPs in extreme natural disaster situations that exceed the design basis. The extreme natural disaster can put the NPPs in beyond-design-basis conditions such as the loss of the power system and the ultimate heat sink. The behaviors and capabilities of NPPs with losing their essential safety functions should be measured to find and supplement weak areas in hardware, procedures and coping strategies. The Loss of Ultimate Heat Sink (LUHS) accident assumes impairment of the essential service water system accompanying the failure of the component cooling water system. In such conditions, residual heat removal and cooling of safety-relevant components are not possible for a long period of time. It is therefore very important to establish coping strategies considering all available equipment to mitigate the consequence of the LUHS accident and keep the NPPs safe. In this study, thermal hydraulic behavior of the LUHS event was analyzed using RELAP5/Mod3.3 code. We also performed the sensitivity analysis to identify the effects of the operator recovery actions and operation strategy for charging pumps on the results of the LUHS accident.

THE MODEL PREDICTIVE CONTROLLER FOR THE FEEDWATER AND LEVEL CONTROL OF A NUCLEAR STEAM GENERATOR

  • Lee, Yoon Joon;Oh, Seung Jin;Chun, Wongee;Kim, Nam Jin
    • Nuclear Engineering and Technology
    • /
    • 제44권8호
    • /
    • pp.911-918
    • /
    • 2012
  • Steam generator level control at low power is difficult due to its adverse thermal hydraulic properties, and is usually conducted by an operator. The basic model predictive control (MPC) is similar to the action of an operator in that the operator knows the desired reference trajectory for a finite period of time and takes the necessary control actions needed to ensure the desired trajectory. An MPC is based on a model; the performance as well as the efficiency of the MPC depends heavily on the exactness of the model. In this study, steam generator models that can describe in detail its thermal hydraulic behaviors, particularly at low power, are used in the MPC design. The design scope is divided into two parts. First, the MPC feedwater controller of the feedwater station is determined, and then the MPC level controller for the overall system is designed. Because the dynamic properties of a steam generator change with the power levels, a realistic situation is simulated by changing the transfer functions of the steam generator at every time step. The resulting MPC controller shows good performance.

Best-Estimate Analysis of MSGTR Event in APR1400 Aiming to Examine the Effect of Affected Steam Generator Selection

  • Jeong, Ji-Hwan;Chang, Keun-Sun;Kim, Sang-Jae;Lee, Jae-Hun
    • Nuclear Engineering and Technology
    • /
    • 제34권4호
    • /
    • pp.358-369
    • /
    • 2002
  • Abundant information about analyses of single steam generator tube rupture (SGTR) events is available because of its importance in terms of safety. However, there are few literatures available on analyses of multiple steam generator tube rupture (MSGTR) events. In addition, knowledge of transients and consequences following a MSGTR event are very limited as there has been no occurrence of MSGTR event in the commercial operation of nuclear reactors. In this study, a postulated MSGTR event in an APR1400 is analyzed using thermal-hydraulic system code MARSI.4. The present study aims to examine the effects of affected steam generator selection. The main steam safety valve (MSSV) lift time for four cases are compared in order to examine how long operator response time is allowed depending on which steam generate. (S/G) is affected. The comparison shows that the cases where two steam generators are simultaneously affected allow longer time for operator action compared with the cases where a single steam generator is affected. Furthermore, the tube ruptures in the steam generator where a pressurizer is connected leads to the shortest operator response time.

Comparison of alarm systems for advanced control room

  • Lee, H.C.;Oh, I.S.;Sim, B.S.;Koo, I.S.;Kim, J.T.;Lee, K.Y.;Park, J.K
    • 대한인간공학회:학술대회논문집
    • /
    • 대한인간공학회 1997년도 추계학술대회논문집
    • /
    • pp.303-309
    • /
    • 1997
  • This study is carried out to investigate performance differences between two alarm presentation methods from the viewpoint of human factors and to provide items to be improved. One of the alarm display methods considered in this study displays alarm lists on VDT combined with hardwired alarm panels. The other method displays alarms on plant mimic diagrams of VDT. This alarm display method has other features for operator aid with which operator can get detailed information on the activated alarm in the mimic diagrams, and the capability for alarm processing such as alarm reduction and prioritization. To compare the twodisplay methods, a human factor experiment was performed with a plant simulator in the ITF(Integrated Test Fcility) that plant operators run for 4 event scenarios. During the experiment, physiological measurements, system and operator action log, and audio/video recordings were collected. Operators' subjective opinion was collected as well after the experiment. Time, error rate and situation awareness were major human factor criteria used for the comparison during the analysis stage of the experiment. No statistical significance was found in the results of our statistical comparison analysis. Several findings were identified, however, through the analysis of subjective opinions.

  • PDF

화재 후 운전원수동조치(OMA) 정량화를 위한 화재 인간신뢰도분석 (HRA) 요소에 대한 고찰 (An Investigation of Fire Human Reliability Analysis (HRA) Factors for Quantification of Post-fire Operator Manual Actions (OMA))

  • 최선영;강대일;정용훈
    • 한국안전학회지
    • /
    • 제38권6호
    • /
    • pp.72-78
    • /
    • 2023
  • The purpose of this paper is to derive a quantified approach for Operator Manual Actions (OMAs) based on the existing fire Human Reliability Analysis (HRA) methodology developed by the Korea Atomic Energy Research Institute (KAERI). The existing fire HRA method was reviewed, and supplementary considerations for OMA quantification were established through a comparative analysis with NUREG-1852 criteria and the review of the existing literature. The OMA quantification approach involves a timeline that considers the occurrence of Multiple Spurious Operations (MSOs) during a Main Control Room Abandonment (MCRA) determination and movement towards the Remote Shutdown Panel (RSP) in the event of a Main Control Room (MCR) fire. The derived failure probability of an OMA from the approach proposed in this paper is expected to enhance the understanding of its reliability. Therefore, it allows moving beyond the deterministic classification of "reliable" or "unreliable" in NUREG-1852. Also, in the event of a nuclear power plant fire where multiple OMAs are required within a critical time range, it is anticipated that the OMA failure probability could serve as a criterion for prioritizing OMAs and determining their order of importance.

PHANToM Device 를 이용한 다관절 로봇의 원격제어 시스템 설계 (Design of Remote Manipulator Control System using PHANToM Device)

  • 김현상;김미경;강희준;서영수
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2004년도 추계학술대회 논문집
    • /
    • pp.241-245
    • /
    • 2004
  • This paper shows the development of remote control system for manipulators which consists of PHANToM Device as a master, Samsung FARA robot as a slave and TCP/IP based LAN for their Communication. This work includes the motion mapping between the master and the slave, Generation of virtual viscosity force preventing operator s unwilled action and 3D remote control simulators for the stable operation of the remote control system, etc. The remote control implementation has been performed and the results shows that the developed system can allow the operator to effectively control the manipulator.

  • PDF

전동차 사례기반 전문가 시스템 (Case-Based Expert System for EMU)

  • 안태기;박기준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 B
    • /
    • pp.1085-1086
    • /
    • 2006
  • EMU, Electric Multiple Unit, is very complicated system that consists of thousand parts. If breakdown happens, work that clears cause in most cases work that clears cause in most cases is very complicated and difficult. Also it needs much times and experts of several parts. Maintenance is depending on know-how of the operator and breakdown that happen before happens often repeatedly because information management and public ownership are not achieved properly about analysis and action result. In this paper we present the case-based expert system for EMU which is able to share this know-how knowledge that data-based systemically with another operator.

  • PDF

PHANToM Device를 이용한 다관절 로봇의 원격제어 시스템 설계 (Design of Remote Manipulator Control System using PHANToM Device)

  • 김현상;강희준
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2005년도 전력전자학술대회 논문집
    • /
    • pp.595-597
    • /
    • 2005
  • This paper shows the development of remote control system for manipulators which consists of PHANToM Device as a master, Samsung FARA robot as a slave and TCP/IP based LAN fortheir Communication. This work includes the motion mapping between the master and the slave, Generation of virtual viscosity force preventing operator's unwilled action and 3D remote control simulators for the stable operation of the remote control system, etc. The remote control implementation has been performed and the results shows that the developed system can allow the operator to effectively control the manipulator.

  • PDF

디지털 컨버전스 활성화에 따른 모바일 데이터 트래픽 증가 현황에 대한 고찰 및 대응 방안 모색 (A Review of Mobile Data Traffic Explosion according to Digital Convergence and Action Plans of Network Operator)

  • 박봉녕;문태희;곽준영;권준혁
    • 정보통신설비학회논문지
    • /
    • 제9권4호
    • /
    • pp.131-140
    • /
    • 2010
  • Recently, mobile wireless data traffic has been dramatically increased due to not only the popularization of digital convergence devices including smart phone, Net-book, and Tablet PC, but also the vitalization of wireless Internet related eco-systems such as AppStore. In addition, it is expected that a tremendous increase in mobile data is caused by the release of unlimited mobile data plans (flat-fee). In order to deal with such mobile data traffic explosion, it is necessary that network operators should make efforts to offload wireless data traffic. This paper reviews the condition of mobile wireless data traffic in domestic and international telecommunication industry and looks for various action plans to overcome the difficulty of network operators.

  • PDF