• Title/Summary/Keyword: operational scenario

Search Result 153, Processing Time 0.024 seconds

Planning of Development of the Operational Concept Document of the "3D Model Based Digital Collaboration System" : Case Study ("3D 모델기반 디지털 협업 시스템" 운용개념 개발 방안 수립 사례)

  • Kim, Jin Il;Cha, Jae Min;Lee, Tae Kyoung;Kim, Joon Young
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.42-48
    • /
    • 2017
  • OCD (Operational Concept Document) is very important in system development. To develop OCD we should answer questions about, what template to use, what is the overall process to develop OCD, what kinds of diagrams we should use and how can we validate the OCD. To answer about the template we compared tow industrial guide on operational concept development and tailored it. For development process, we proposed a comprehensive process which satisfies the requirements of the project context. For use of proper diagram, we analyzed many kinds of diagrams used in representing behavior of system and choose some diagrams which best fit for our purpose. Finally we established validation criteria for operational scenario and requirement texts in operational concept documents.

Scenario based optimization of a container vessel with respect to its projected operating conditions

  • Wagner, Jonas;Binkowski, Eva;Bronsart, Robert
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.2
    • /
    • pp.496-506
    • /
    • 2014
  • In this paper the scenario based optimization of the bulbous bow of the KRISO Container Ship (KCS) is presented. The optimization of the parametrically modeled vessel is based on a statistically developed operational profile generated from noon-to-noon reports of a comparable 3600 TEU container vessel and specific development functions representing the growth of global economy during the vessels service time. In order to consider uncertainties, statistical fluctuations are added. An analysis of these data lead to a number of most probable upcoming operating conditions (OC) the vessel will stay in the future. According to their respective likeliness an objective function for the evaluation of the optimal design variant of the vessel is derived and implemented within the parametrical optimization workbench FRIENDSHIP Framework. In the following this evaluation is done with respect to vessel's calculated effective power based on the usage of potential flow code. The evaluation shows, that the usage of scenarios within the optimization process has a strong influence on the hull form.

Requirements Study of a High-Resolution Satellite Image Receiving, Processing and Archiving System

  • Hong, Min-Nyo;Kim, Tae-Jung;Kim, Tag-Gon
    • Proceedings of the KSRS Conference
    • /
    • 1999.11a
    • /
    • pp.19-24
    • /
    • 1999
  • This paper addresses a new project being carried out at Satellite Technology Research Center. The purpose of the project is to implement a system which receives, processes and stores 1m resolution satellite image transmitted at over 300Mbps down link data rates. In order to develop such a system, a system operational concept design and a requirements study were being carried out As a result of the operational concept design, system objectives, system context and system functions were defined. The system shall be operated according to the philosophy of maximum automation. rapid processing, reliability, integrity, cost effectiveness, and expandability. The system is divided into twelve independent processes and its behavior is modeled by operational scenario, which are combinations of independent processes. Process information and logs generated by the system shall be stored in databases and data received and generated be automatically archived and managed in a hierarchical storage device. The system shall have redundant components in order to be ready for recovering from sudden system failures. This paper will describe in detail the system operational concept design and the system requirements derived from the operational concept design.

  • PDF

A Study on Operational Concept of Military Guard and Surveillance Robots (군 경계 및 감시로봇 운용개념 연구)

  • Seo, Dong-Cheul;Lee, Woo-Chan;Hwang, Chun-Sik
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.1
    • /
    • pp.5-14
    • /
    • 2008
  • In this paper, we propose operational concepts and technology requirements for guard and surveillance robots in military field. After surveying on current trend of guard robots, we present an operational scenario and technology requirements. To begin with, we discriminate the use of fixed type guard robots(fixed robots) and mobile guard and surveillance robots(mobile robots). Fixed robots are used for substituting daily guard by human soldier. In contrast, mobile robots are used for compensating shadow area where not to be covered by fixed type robots. To be specific, mobile robots adopt communication relays to extend operational range and sensor networks to collecting information. In addition, we present technology requirements composed of wireless communication system, platform, sensor nodes, unmanned driving technology, power supply system and IFF etc. In conclusion, in order to maximize co-operational functionality, fixed robots and mobile robots should be tightly related.

The Impact of Climate Change on Future Ground Operations (기후변화에 따른 미래 지상 작전 영향)

  • Taejin Lee;Sanghwan Park;Suyeon Park;Minji Kim;Gyeongmin Kang;Jaedon Hwang;Sung Kim
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.26 no.5
    • /
    • pp.431-438
    • /
    • 2023
  • The information about battlefield environment changes and operational impacts on Korean Peninsula due to climate change is essential for national defense. In this study, the future impact of four ground operations was analyzed by using the national climate change standard scenario based on the IPCC 6th report. As a result, it was analyzed that the number of operational-limited days for ambush and airlift operations would decrease, making the operational environment favorable. However, the operational environment unfavorable as the number of operational-limited days for crossing and reconnaissance operations increase, but the number is not large so much.

The Development of Carrier Aviation Support System Architecture using DoDAF (DoDAF를 이용한 항모 항공지원시스템 아키텍처 개발)

  • Lee, Seung Do;Park, Peom
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.33-39
    • /
    • 2015
  • This paper describes a development of aircraft carrier aviation support system architecture using DoDAF. The aircraft carrier, a warship performing a role of mobile sea air base in offensive and defense mission, is super system that is comprised of carrier itself and carrier-based airwing. Performing critical role in step with aviation operations in carrier-airwing interactions, the aviation support system of aircraft carrier is also system of systems. It requires a complex and integrated approach based on systems engineering in establishing concept of this complex systems. In this view, this study establishes an operational scenario and derives operational requirements by identifying aviation operations environment on deck of aircraft carrier. The study presents the operational architecture of the carrier aviation support system by using DoDAF and CASE tool CORE.

An Operational Availability Analysis in Supply Chain Using Simulation (다단계 공급체인에서의 장비운용가용도 시뮬레이션 분석)

  • Park, Se-Hoon;Moon, Seong-Am
    • Korean System Dynamics Review
    • /
    • v.12 no.1
    • /
    • pp.115-130
    • /
    • 2011
  • This study shows the operational availability(Ao) analysis of the supply chain with maintenance functions using the system dynamics simulation. The simulation uses 60 equipments which are serial systems composed by 4 major components. And every entities are connected each other by causal loops. So whole simulation executed like one organic system. Specially we consider 2 constraints, one is the number of spare parts and the other is maintenance capacity level. 2 constraints have 11 levels each so the simulation has 121(11*11) scenarios which scenario has 30 different random number seed. The simulation executed total 3,630(11*11*30) times. We analysis average Ao of total equipments by 121 scenarios and additionally the regression of the average Ao and 2 constraints. As the result, we can get the more accurate values by the system dynamics simulation than the regression to analysis complex system like the supply chain with maintenance functions.

  • PDF

A Study on the Routing of Onboard Oriented Control System by Operation Scenario

  • Baek, Jong-Hyen;Kim, Yong-Gyu;Song, Yong-Soo;Oh, Se-Chan;Shin, Dong-Ho
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.2 no.4
    • /
    • pp.473-477
    • /
    • 2013
  • The railway developed countries in Europe, Japan such as ERTMS Regional, FFB, COMBAT, it is the stage of development or testing the train control system for the signal system of branch interval of low density. Similar to the signal system used by the mainline and branch sections of low density domestic portions not suitable in terms of maintenance operational efficiency in accordance with the installation and operation in many cases. Therefore these low-density branch railway lines required that oriented train control system of wireless communication to improve the operation efficiency and line side equipment controlled on board the train. In this paper, We was published a route on setting is the operation of the new on-board oriented train control system for controlling a line converter of the train so that it is possible to improve the operational efficiency of the branch of the low density.

Development of an USN Based Integrated Open Server System for Disaster Prevention Management (USN 기반 개방형 방재관리 통합시스템 개발)

  • Lee, Jeong-Kyoon;Lee, Ki-Young
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2007.10a
    • /
    • pp.929-932
    • /
    • 2007
  • The integrated prevention of disaster management system is collected prevention of disaster data from prevention of disaster relation other systems and smart sensor in USN. This system manages fire fighting facility effectively. The relation equipment which is used in existing and network using "Open Protocols" about under using the support system which is integrated effectively as the destroyer. It connects CCTV, the sensitivity environmental sensor, automatic fire detection equipment and security equipment and air flow equipment system using Internet. The System Server was collected monitoring data at the each equipment and processing by operational scenario. It will verified the effectiveness of operational scenario and integrated prevention of disaster management system

  • PDF

Development of Timely Counter-scenario on Small Scale Engagements (소규모 교전에서의 적시 대응 시나리오 개발 방안 연구)

  • Ahn, Euikoog;Chang, Dae S.;Pyun, JaiJeong;Kwon, Yongjin James;Park, Sang C.
    • Journal of the Korea Society for Simulation
    • /
    • v.22 no.2
    • /
    • pp.63-71
    • /
    • 2013
  • Developing future weapons systems has become increasingly complicated and costly. There, modeling and simulation techniques have been highly interested in developing the defense systems. Modeling and simulation techniques provide a means to simulate military training, strategies, military doctrines, and weapons acquisition. In this paper, we proposed a small scale engagement scenario generation method for engagement M&S model. Generated scenario is one of critical factors in the field of commander training, operational analysis, and tactical evaluation. The objective of this paper is to develop a scenario generation method for small scale engagement using the FSA(Finite State Automata) and DFS(Depth First Search) algorithm. The proposed method is verified using a one-on-one combat engagement scenario between assault ship and reconnaissance ship. Also, we are visualized using Delta3D$^{TM}$.