• Title/Summary/Keyword: operation research

Search Result 13,054, Processing Time 0.044 seconds

Development of Automatic Train Operation System H/W for KOREA Standard EMU (표준전동차용 열차자동운전장치 (ATO) H/W 개발)

  • Lee, Su-Gil;Han, Seong-Ho;Ahn, Tae-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1457-1459
    • /
    • 2000
  • The ATO(Automatic Train Operation System) system is equipment for automatic and driverless operation of electric train with minimum control of operator. In this paper, we made ATO system with national technic and passed type test. We are convinced of reliability and safety of the ATO system on the seoul metro 7 line.

  • PDF

Efficient Yard Operation for the Dual Cycling in Container Terminal (컨테이너 터미널의 효율적인 듀얼 사이클을 위한 야드 운영)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.35 no.1
    • /
    • pp.71-76
    • /
    • 2011
  • Recently, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for increasing the productivity of quay side. If, however, we make an experiment on dual cycle operation in a real job site, the efficiency is poor up to terminal operation method as YTs(Yard Tractors)' allocation method, QCs(Quay Cranes)' working speed, and position of export containers. Especially, using the existing yard operation method, it is difficult to support to dual and double cycle operation. Therefore, this paper examine more efficient terminal operation method, when terminal uses dual cycle operation. We developed a simulation model using simulation analysis software, Arena.

Train Regulation by the Advanced Algorithm for Subway (개선된 알고리즘에 의한 지하철 운행간격 제어)

  • Park, Hong-Kyu;Shim, Won-Sup;Hong, Soon-Heum
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.330-333
    • /
    • 2002
  • Even if the train of subway starts in a certain interval from the origin according to the operation plan. as the number of passenger gets increased during operation. the boarding and getting-off time will increase, and the temporary breakdown happens to the system of train during operation, causing the delay from the operation plan. this leads to the vicious circle of train operation. making the interval of train operation irregular in downtown especially. To solve this problem, we propose the method of advanced algorithm by the actual data relating to the train operation including operation time required between stations, distance between stations. capability of train, and the dwelling time, location and distance between the preceding train and next one. The central train control system adjusts the dwelling time at each station in order to recover the delayed time, and increase the operation speed at the each station. As control algorithm is applied the dwelling time and to increase the speed, the train maintains certain interval after certain amount of time passes.

  • PDF

Ergonomic Improvement of Operation Console for Pilot Aptitude Research Equipment (조종적성 검사/연구 장비 운용 Console의 인간공학적 개선)

  • Kim, Sungho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.42-49
    • /
    • 2018
  • Pilot Aptitude Research Equipment (PARE) is a simulator developed to measure or research pilot aptitude and train for student pilots. Design of an ergonomic PARE operation console is required to operate the equipment effectively. This study carried out five steps : (S1) operator questionnaire survey, (S2) anthropometric design formula development, (S3) usability evaluation, (S4) improvement design, and (S5) validation considering both Physical User Interface (PUI) and Graphic User Interface (GUI) of PARE operation console. The operator questionnaire surveyed needs for each PUI and GUI part of the console from two PARE actual operators. In terms of PUI, the anthropometric design formula was developed by using design variables, body dimensions, target population characteristics, and reference posture related to the PARE console. In terms of GUI, the usability evaluation was conducted by three usability testing experts with a 7-point scale (1 : very low, 4 : neutral, 7 : very high) on GUI of the PARE operation console by seven usability criteria. The improved PARE operation console was designed to reflect the optimal values of design variables calculated from design formula, the results from usability testing, and the operator's needs. The improvement effect was observed by 20 people who had experience with the PARE operation console. As a result of the validation, monitor visibility and cockpit visibility for the improved PUI design and visibility and efficiency for the improved GUI design were significantly increased by more than 90% respectively. The improved design of the PARE operation console in this study can contribute to enhance operation performance of the PARE.

A Basic Study on the Development of O&M Cost Assessment Model to Improve Operational Efficiency of Large Public Research Infrastructures (CAM) (대형 공공연구인프라의 운영 효율성 제고를 위한 운영 및 유지관리비 평가모델 개발 기초연구)

  • Choi, Sun-Ah;Son, Seung-Hyun;Lee, Sung-Ho;Oh, Oum-Joong;Han, Bum-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.93-94
    • /
    • 2021
  • The Korean government has invested a tremendous amount of money in the last 10 years to build large public research infrastructures (LPRI). For efficient operation and maintenance of LPRI built with expensive equipment and professional engineers, reasonable budget needs to be allocated. However, it is difficult to fulfill sustainable operation and maintenance (O&M) because there is no standard on budgeting for efficient LPRI operation, including expensive equipment and manpower allocation. There have been a lot of cost assessment studies regarding O&M of high-demand facilities such as hospitals, hotels and residential buildings, but a very few on sustainable O&M of LPRI. Therefore, mid/long-term budget establishment plans for efficient LPRI O&M are required from the initial planning stage and a cost assessment model to support the plans should be developed. The objective of this paper is to propose a cost assessment model for sustainable operation and maintenance of large public research infrastructures. To do so, actual O&M data of 6 LPRI types in operation are collected, and regression analysis model (RAM) is used for development and evaluation a cost assessment model. The study result will support sustainable operation of LPRI from a business perspective and be used as basic data for continuous development of cost assessment models to establish budgets for LPRI operation from an academic perspective.

  • PDF

An analysis of Electro-Optical Camera (EOC) on KOMPSAT-1 during mission life of 3 years

  • Baek Hyun-Chul;Yong Sang-Soon;Kim Eun-Kyou;Youn Heong-Sik;Choi Hae-Jin
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.512-514
    • /
    • 2004
  • The Electro-Optical Camera (EOC) is a high spatial resolution, visible imaging sensor which collects visible image data of the earth's sunlit surface and is the primary payload on KOMPSAT-l. The purpose of the EOC payload is to provide high resolution visible imagery data to support cartography of the Korean Peninsula. The EOC is a push broom-scanned sensor which incorporates a single nadir looking telescope. At the nominal altitude of 685Km with the spacecraft in a nadir pointing attitude, the EOC collects data with a ground sample distance of approximately 6.6 meters and a swath width of around 17Km. The EOC is designed to operate with a duty cycle of up to 2 minutes (contiguous) per orbit over the mission lifetime of 3 years with the functions of programmable gain/offset. The EOC has no pointing mechanism of its own. EOC pointing is accomplished by right and left rolling of the spacecraft, as needed. Under nominal operating conditions, the spacecraft can be rolled to an angle in the range from +/- 15 to 30 degrees to support the collection of stereo data. In this paper, the status of EOC such as temperature, dark calibration, cover operation and thermal control is checked and analyzed by continuously monitored state of health (SOH) data and image data during the mission life of 3 years. The aliveness of EOC and operation continuation beyond mission life is confirmed by the results of the analysis.

  • PDF

Radiologic assessment of bone healing after orthognathic surgery using fractal analysis

  • Park Kwan-Soo;Heo Min-Suk;Lee Sam-Sun;Choi Soon-Chul;Park Tae-Won;Jeon In-Seong;Kim Jong-Dae
    • Imaging Science in Dentistry
    • /
    • v.32 no.4
    • /
    • pp.201-206
    • /
    • 2002
  • Purpose : To evaluate the radiographic change of operation sites after orthognathic surgery using the digital image processing and fractal analysis. Materials and Methods : A series of panoramic radiographs of thirty-five randomly selected patients who had undergone mandibular orthognathic surgery (bilateral sagittal split ramus osteotomy) without clinical complication for osseous healing, were taken. The panoramic radiographs of each selected patient were taken at pre-operation (stage 0), 1 or 2 days after operation (stage 1), 1 month after operation (stage 2), 6 months after operation (stage 3), and 12 months after operation (stage 4). The radiographs were digitized at 600 dpi, 8 bit, and 256 gray levels. The region of interest, centered on the bony gap area of the operation site, was selected and the fractal dimension was calculated by using the tile-counting method. The mean values and standard deviations of fractal dimension for each stage were calculated and the differences among stage 0, 1, 2, 3, and 4 were evaluated through repeated measures of the ANOVA and paired t-test. Results : The mean values and standard deviations of the fractal dimensions obtained from stage 0, 1, 2, 3, and 4 were 1.658±0.048, 1.580±0.050, 1.607±0.046, 1.624±0.049, and 1.641 ±0.061, respectively. The fractal dimensions from stage 1 to stage 4 were shown to have a tendency to increase (p < 0.05). Conclusion: The tendency of the fractal dimesion to increase relative to healing time may be a useful means of evaluating post-operative bony healing of the osteotomy site.

  • PDF

GOES-9 IMAGER DATA ANLYSIS FOR THE PREPRATION OF THE COMS MI OPERATION

  • LIM Hyun-Su;PARK Durk-Jong;KOO In-Hoi;KANG Chi-Ho
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.462-465
    • /
    • 2005
  • The ITT Industry's Commercial Advanced Geo-Imager (CAGI) which is a recurrent version of imagers used in the GOES series was selected as the COMS Meteorological Imager (MI). The ITT Imager can conduct some special observation such as the space look, blackbody observation, and star sensing regularly or irregularly for its radiometric quality control. Because the GOES-9 which uses an ITT Imager has become operational over the Western Pacific and Eastern Asia positioned at 155 degrees East, the reception of the GOES-9 data is available in Korea. As a step of preparing the COMS MI operation, we conduct the analysis of the GOES-9 imager raw data and operation procedures and compare them with contents of the ITT Imager's manual.

  • PDF

Development of Automation Process for fuel Reload Operation (핵 연료봉 교체 전산화 개발)

  • Kim, Young-Jin;Sin, Won-Sik;Jung, Hee-Chul
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.106-111
    • /
    • 2005
  • In nuclear power plant, the source of the energy is generated from the nuclear fuel rod. Given a certain level of consumption, the burnt fuel rod should be removed and replaced by a new(fresh) one. The burnt fuel is approximately one third of the whole fuel rods. Currently, this operation is done manually using paper documents and verbal communication and consumes a lot of operation time. In this study, we develop an computerized operation process of nuclear fuel rod replacement procedure based on the ERP(Enterprise Resource planning) methodology.

  • PDF

Urban Spatial Analysis using Multi-temporal KOMPSAT-1 EOC Imagery

  • Kim Youn-Soo;Jeun Gab-Ho;Lee Kwang-Jae;Kim Byung-Kyo
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.515-517
    • /
    • 2004
  • Although sustainable development of a city should in theory be based on updated spatial information like land cover/use changes, in practice there are no effective tools to get such information. However the development of satellite and sensor technologies has increased the supply of high resolution satellite data, allowing cost-effective, multi-temporal monitoring. Especially KOMPSAT-1(KOrea Multi-Purpose SATellite) acquired a large number of images of the whole Korean peninsula and covering some large cities a number of times. In this study land-use patterns and trends of Daejeon from the year 2000 to the year 2003 will be considered using land use maps which are generated by manual interpretation of multi-temporal KOMPSAT EOC imagery and to show the possibility of using high resolution satellite remote sensing data for urban analysis.

  • PDF