• Title/Summary/Keyword: operation & maintenance cost

Search Result 488, Processing Time 0.034 seconds

Breakdown Structure and Weight Evaluation for Maintenance Items of Public Childcare Facilities (국·공립 보육시설의 운영유지 항목 분류체계 개발 및 중요도 산정)

  • Park, Hyeong-Jin;Park, In-Ji;Moon, Hyun-Seok;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.3-11
    • /
    • 2013
  • Recently according to increasement of the single family and dual-earner couples, the number of infants and young children stays on a long time to the childcare facilities. this is increasing the importance to improve the physical environment. However, the operating and maintenance costs of the national-public childcare facilities have taken effect of the unfair support issues of municipality's financial situation. Especially, because of the lack of the operating and maintenance costs of the facility and the shortage of facilities equipment maintenance repair costs, nursery operations and Maintenance items are needed to distribute appropriately. Therefore, this study is to estimate the importance to facility operations and maintenance items based on "Kindergarten and Childcare Facilities"presented at the Child Care Policy Study. we are expected to allocate appropriately of operation and maintenance cost of a limited budget. In particular, those can be considered for operation and maintenance cost about the National-Public Childcare Facilities and be determined to a safe and pleasant environment to kindergartens through the appropriate operations and maintenance support.

A Mixed Integer Linear Programming Approach for the Profit Based Unit Commitment Problem under Non-Linear Fuel Consumption Constraint and Maintenance Cost (비선형 연료 제약 및 유지보수 비용을 고려한 Mixed Integer Linear Programming 기반 발전기 주간 운용계획 최적화)

  • Song, Sang-Hwa;Lee, Kyung-Sik
    • Korean Management Science Review
    • /
    • v.25 no.1
    • /
    • pp.43-53
    • /
    • 2008
  • This paper considers a profit-based unit commitment problem with fuel consumption constraint and maintenance cost, which is one of the key decision problems in electricity industry. The nature of non-linearity inherent in the constraints and objective functions makes the problem intractable which have led many researches to focus on Lagrangian based heuristics. To solve the problem more effectively, we propose mixed integer programming based solution algorithm linearizing the complex non-linear constraints and objectives functions. The computational experiments using the real-world operation data taken from a domestic electricity power generator show that the proposed algorithm solves the given problem effectively.

Logistic Supportability Improvement Program for the Future Main Battle Tank (고장진단체계 구축을 통한 미래전차의 군수지원성 향상 방안 연구)

  • Jung, ChangMo;Lee, MyungChun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.34-42
    • /
    • 2005
  • Logistic Support Analysis(LSA) and Logistic Supportability Review must be carried out as soon as possible in development stage in order to minimize operation/maintenance cost that head the list of weapon cost and improve logistic supportability of the weapon system. And the result must be used for hardware designs to set up to be able to input to the system design and logistic support elements. Therefore Logistic Support Elements must be planed/developed/supplied with the main combat system concurrently and performance and logistic supportability of the comabat system had better be improved mutually. This report describes maintenance concept changes of weapon systems, fault diagnosis function and test equipment state on the domestic MBT(main battle tank). And then it presents application and intensification of itself fault diagnosis system for a domestic future MBT considering connection with IETM(Interactive Electronic Technical Manual) and TE(Test Equipment).

  • PDF

BIM-based Property Management by Linking Maintenance with Financial Data for Commercial Building Projects

  • Shin, Hyeonju;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.418-425
    • /
    • 2022
  • For a commercial building, property managers play an important role in maximizing the benefit by reducing cost and increasing revenue in the operation and maintenance phase of the building. However, most of property managers are spending their time in monitoring facility managers who have little impact on cost reduction and maximization of operating profit. The industry practitioners have difficutlty in increasing the efficiency of thier work due to this work environment. In addition, both property managers(PMr) and facility managers(FMr) are dependent on the paper drawings and manuals, which can worsen the inefficiency and human errors are inevitable. This study aims to contribute to improvement of the current practice by developing a novel algorithm that autmatically links the facility information with 3D model, which can provide an efficient property management for commercial buildings.

  • PDF

765kV Transmission maintenance live-line work study (765kV 송전선로 유지.보수 활선공법 고찰)

  • Choi, Han-Yeol;Min, Byeong-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.723-724
    • /
    • 2007
  • Live line work is well known for mending and maintenance of electrical power equipment. Nowadays needs of electric power supply quality require live line work In Korea, live line work is needed since 765kV transmission operation and restructure of electric power industry has changed. In other words, in case of suspension of power supply on the transmission is getting hard to keep up with efficiency of transmission operation, customer's confidence and generation-limited cost. Therefore live line work is very meaningful. As the condition of 765kV Transmission both bare hand and Helicopter live line technique must be used in moderation because of economic, geographical, environmental circumstances around steel tower.

  • PDF

A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis (무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구)

  • Ahn, Jung-Jun;Kim, Su-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.76-82
    • /
    • 2019
  • This study has done to search for a solution to remove risk limitedly caused by separating weapon system acquisition from operation and maintenance at the view point of Logistic Commander who's responsible for stable operation and maintenance after acquiring weapon system. At the System development stage, unverified overhaul development plan may cause additional manpower and costs after the development, and furthermore it is likely to have risk to lower reliability of the military. Thus, research and development agency should write overhaul development plan at the System development stage, and it should be verified through evaluation and verification test. Secondly, during research and development, institutional supplementation is needed to calculate human and material resources writing overhaul development plan. Thirdly, it should be able to analyze proper operation & maintenance plan and cost for overhaul plan at the pre-investigation stage. Fourthly, the base which can develop overhaul concept and overhaul factors should be included in the need and need determination document. Lastly, for the weapon system which has small amount of high power figure, project management should be performed to be able to specify at the each acquisition level of weapon system to realize Article 28, clause 3 and 4 of Defense business law.

Analysis of the Switch Installation Criteria by Increasing Operating Capacity in Distribution Line (배전선로 운전용량 상향에 따른 개폐기 설치 기준 분석)

  • Jo, Nam-Hun;Ha, Bok-Nam;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.6
    • /
    • pp.290-295
    • /
    • 2002
  • The present assignment in installing the number of switches for distribution line was made on the basis of a normal feeder capacity 7,000kVA in KEPCO(Korea Electric Power Corporation), Korea. But the normal capacity is revised to 10000kVA in 1998. Even increasing limit of the operating capacity of the distribution lines enables us to give some benefit for the operation flexibility and investment cost of the distribution system. It is disadvantageous in the viewpoint of supply reliability. In distribution systems, switches are equipped to improve the reliability of distribution systems by minimizing the outage section due to fault and maintenance. Utility generally improves the reliability by minimizing the length of outage section, which is caused by fault and maintenance, through switch equipment on distribution system. In order to cope with the changes such as operation capacity, it is necessary to study whether the present criteria is reasonable or not, also to confirm whether the present criteria of installing switches in line is improved or not. In this study, we proposes the number of switch per feeder on the basis of present operation capacity in distribution system.

A Simulation Study for the Optimum Design of Cogeneration System (소형열병합발전 최적 시스템 설계 시뮬레이션)

  • Im, Yong-Hoon;Park, Hwa-Choon;Choi, Young-Ho;Chung, Mo
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.325-331
    • /
    • 2009
  • In this paper, a simulation approach for the optimum design of cogeneration system is described. For the purpose of the systematic analysis, a simulation tool is developed with which the prediction of the energy load, calculation of operation data according to prime mover or capacity of it, and estimation of economic gains can be carried out. As for the criterion of the optimum design, the economic gains by adopting cogeneration system is taken. Based on the capital, operation, and maintenance costs etc, LCC analysis is to be carried out for the scenarios respectively. In this study, the simulation for the apartment complex is performed and the analysis of the results are described in detail. The effects of the operation parameters such as capital cost, fuel cost, and unit cost for the purchase or sale of heat and electricity on overall economy are also be considered by sensitivity study.

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

The Improvement Plan on Fare and Ticketing System of Seoul Metropolitan Subway Considering Construction and Operational Costs (건설.운영비를 고려한 수도권 전철의 운임체계 및 승차권제도 개선방안)

  • Lee, Tai-Sik;Ryu, Jong-Won;Chung, Chul;Lee, Dong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.327-336
    • /
    • 2007
  • Operation a subway company requires high amount of early construction, operation and maintenance costs. Seoul Metro, one of the public subway companies in Seoul, Korea, has undergone operational deficit from its establishment, and the main reason is that the early construction and operation cost exceed the total revenue. Therefore, detailed researches on current operation system and possible alternatives are conducted to settle down finance trouble of the company. In particular, problems on operation and ticketing systems are analyzed, and based on that, necessity and detailed plan of railroad pass for one day are introduced and analyzed.