Kim, Si Moon;Yun, Wan No;Jang, Cheol Ho;Park, Se Ik
KEPCO Journal on Electric Power and Energy
/
v.2
no.1
/
pp.83-88
/
2016
This paper describes the test results of plant minimum stable load (Pmin) for Ilijan Power Plant. The test was conducted on May 13 through 14, 2015 to investigate the plant operating and equipment condition in accordance with "Ilijan Plant Performance Test Procedure on Plant Minimum Stable Load" [1]. This paper also contains the assessment of the impact of Pmin to plant operating parameters and possible technical operating issues when operating at lower loads and to recommend the safe minimum load operation of Ilijan per block. In addition, this paper describes the performance calculation results of efficiency and heat rate depending on the load level.
Landfill gas is a mixture of methane and carbon dioxide produced by the bacterial decomposition of organic wastes, and it is considered to produce bad smells and pollute the environment. Economic trials and the developments of landfill gas, as an alternative energy resource, become known at the recent years. Resource development of landfill gas, which is managed by Korea up to now, is for the most part generation using gas engine. Medium BTU and High BTU are considered for the power generation as well. I\10st income of generation using gas engine is selling charge through a power plant. Expecting to manage the power plant for up to 10 years, the analysis based on revenue and expenditure shows when the unit price is 65.2 Won and the operating rate reaches 90%, it is possible to be into the black in 2012 without considering additional financial expense. It was also analyzed that the profit at a unit price of 85 Won under the anticipated rising unit price by the operating rate of 71% is larger than at the operating rate of 90% under limited unit price of 65.2 Won. It means to manage the power plant at a unit price of 65.2 Won and the operating rate must be higher than 90% for economic logicality. If we assume that the operating rate is 90% and it increases the unit price, the unit price must be higher than 85 Won for the management of a power plant. Analysis of changing a unit price, however, might be expected to have a gradual rise of prices. If there is no price rising and additional income related to CDM(Clean Development Mechanism) and emission trading upon Kyoto protocol, the management of a power plant using gas engine will get financial difficulties because of many operating expenses. However, since landfill gas is considered as a worthy energy resource for the guarantee of sustainable development and for the equity between recent generation and future generation, the development of it must be accomplished by the government's additional supporting and efforts under the interest of all stakeholder who are involved.
Landfill gas is a mixture of methane and carbon dioxide produced by the bacterial decomposition of organic wastes, and it is considered to produce bad smells and pollute the environment. Economic trials and the developments of landfill gas, as an alternative energy resource, become known at the recent years, Resource development of landfill gas, which is managed by Korea up to now, is for the most part generation using gas engine. Medium BTU and High BTU are considered for the power generation as well. Most income of generation using gas engine is selling charge through a power plant. Expecting to manage the power plant for up to 10 years, the analysis based on revenue and expenditure shows when the unit price is 65.2 Won and the operating rate reaches 90%, it is possible to be into the black in 2012 without considering additional financial expense, It was also analyzed that the profit at a unit price of 85 Won under the anticipated rising unit price by the operating rate of 71% is larger than at the operating rate of 90% under limited unit price of 65.2 Won. It means to manage the power plant at a unit price of 65.2 Won and the operating rate must be higher than 90% for economic logicality. If we assume that the operating rate is 90% and it increases the unit price, the unit price must be higher than 85 Won for the management of a power plant. Analysis of changing a unit price, however, might be expected to have a gradual rise of prices. If there is no price rising and additional income related to CDM(Clean Development Mechanism) and emission trading upon Kyoto protocol, the management of a power plant using gas engine will get financial difficulties because of many operating expenses. However, since landfill gas is considered as a worthy energy resource for the guarantee of sustainable development and for the equity between recent generation and future generation, the development of it must be accomplished by the government's additional supporting and efforts under the interest of all stakeholder who are involved.
Heat rate is a representative index to estimate the performance of turbine cycle in nuclear power plant. Accuracy of heat rate calculation is dependent on the accuracy of measurement for plant status variables. Uncertainty of heat rate can be modeled using uncertainty propagation model. We developed practical estimation model of heat rate uncertainty using the propagation and regression model. The uncertainty model is used in the performance analysis system developed for the operating nuclear power plant.
The objective of this study was to examine the recovery of the power plant cooling tower blowdown water (CTBD) by membrane distillation. The experiments were carried out using a flat plate poly vinylidene fluoride (PVDF) membrane with a pore diameter of $0.22{\mu}m$ by a direct contact membrane distillation unit (DCMD). The effects of operating parameters such as transmembrane temperature difference (${\Delta}T$), circulation rate and operating time on permeate flux and membrane fouling have been investigated. The results indicated that permeate flux increased with increasing ${\Delta}T$ and circulation rate. Whereas maximum permeate flux was determined as $47.4L/m^2{\cdot}h$ at ${\Delta}T$ of $50^{\circ}C$ for all short term experiments, minimum permeate flux was determined as $7.7L/m^2{\cdot}h$ at ${\Delta}T$ of $20^{\circ}C$. While $40^{\circ}C$ was determined as the optimum ${\Delta}T$ in long term experiments. Inorganic and non-volatile substances caused fouling in the membranes.
Acoustic emission technology is applied to diagnosis the internal leak and operating conditions of the major valves at nuclear power plants. The purpose of this study is to verify availability of the acoustic emission as in-situ diagnosis method. In this study, acoustic emission tests are performed when the pressurized high temperature steam flowed through gate valve(1st stage reheater valve) and glove valve(main steam dump valve) on the normal size of 4 and 8". The valve internal leak diagnosis system for practical field was designed. The acoustic emission method was applied to the valves at the site, and the background noise was measured for the abnormal plant condition. To improve the reliability, a judgment of leak on the system was used various factors which are AE parameters, trend analysis, signal level analysis and RMS(root mean square) analysis of acoustic signal emitted from the valve operating condition internal leak.
This paper describes the development of training simulator for Hadong fossil Power Plant. The simulator was developed to train operator, test new control Logic and evaluate alternative operating procedure for expert engineer of control system. The most control logics such as Siemens TELEPERM ME and GE Mark V are translated directly from microprocessors. Those HMI are also directly emulated. The simulation was performed by ProTRAX modeling software. The paper discusses the configuration of simulator and the simulation results of 30%, 50%, 75% and 100% normal rate load test.
The present study performs a test of a change in a condenser pressure on two kinds of power plants having different condenser pressure-heat rate correction curve and evaluates the results. According to a result of the test, it is confirmed that a sub-critical drum type steam power plant is optimally operated at the condenser pressure of 38㎜Hga that is designed, even during winters. On the other hand, it can be found that a supercritical once through type steam power plant operated at the condenser pressure that is reduced below a design value, that is, up to 28㎜Hga during winters is advantageous in view of turbine efficiency and is operated without a problem in facility operation such as moisture erosion, turbine vibration, etc. Also, the present study compares and reviews a condenser pressure-heat rate correction curve proposed by a manufacturer and a test value. The present study proposes optimum condenser operation pressure capable of concurrently satisfying the stable operation and efficiency improvement of the power plant facility that is operating, making it possible to support an efficient operation of a power plant.
We acquired operating data in an existing steam turbine power plant using analog control system to investigate operation characteristics. We analyzed a load control logic to develop a digital turbine control system. The load control logic is constituted of load target, load reference, loading rate, load limit and admission mode transfer of valve. The result of this paper is utilized to implement a digital turbine control system.
The present paper relates to an integration power system combining tidal power generation and ocean current power generation, and more particularly, to an integration power system combining a tidal power plant and two ocean current power parks, which is capable of increasing the operating rate of power facilities and efficiently generating electrical energy by using incoming seawater into the lake through turbine generators of a tidal power plant or fast flow of seawater discharged to a sea side through sluice gates of a tidal power dam. It is shown that the integration power system is a new promising ocean power system and the ocean current turbine generators in the ocean current power parks of the integration power system are smaller in size and larger in power generation capacity compared with the tidal current turbine generators in the ocean.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.