Plant Minimum Stable Load (Pmin) Test for Ilijan CCPP |
Kim, Si Moon
(KEPCO Research Institute, Korea Electric Power Corporation)
Yun, Wan No (KEPCO Research Institute, Korea Electric Power Corporation) Jang, Cheol Ho (KEPCO Research Institute, Korea Electric Power Corporation) Park, Se Ik (KEPCO Research Institute, Korea Electric Power Corporation) |
1 | "Ilijan Plant Performance Test Procedure on Plant Minimum(Pmin) Stable Load", KEPRI, 2015. |
2 | "Final Report on Plant Pmin Reduction", KEPCO Ilijan Corporation, 2013. |
3 | "Guidelines for the Performance Testing of Thermal Power Plants", Korea Electric Power Research Institute (KEPRI), 2006. |
4 | "Report on the Precision Thermal Diagnosis after Planned Preventive Maintenance", KEPRI, 2005. |
5 | ASME PTC 6.2, 'Steam Turbine in Combined Cycles', ASME, New York, 2011. |
6 | ASME PTC 46, 'Overall Performance Test Code', ASME, New York, 1996. |
7 | ASME PTC 22, 'Gas Turbines', ASME, New York, 2005. |
8 | ASME PTC 4.4, 'Heat Recovery Steam Generators', ASME, New York, 2008. |
9 | ASME PTC 22, 'Gas Turbines', ASME, New York, 2005. |
10 | "Advanced Technologies of M501G Gas Turbine", Mitsubishi Heavy Industries, LTD., 2007. |
11 | "Heavy-Duty Gas Turbine Operating and Maintenance Considerations", GE Power Systems, 2003. |