최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구 (A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권4호
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

FTA기법에 의한 원전기동전원의 이용율 예측에 관한 연구 (A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTAMethod)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권5호
    • /
    • pp.517-523
    • /
    • 1999
  • The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.

  • PDF

이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획 (KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site)

  • 송인호;오종석
    • 전력전자학회논문지
    • /
    • 제27권5호
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

Study on the Safe Evacuation Management in a Power Supply Disturbed Emergency

  • Suzuki, Nobuyuki;OHASHI, Tsubasa;WHORLOW, James R
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.87-91
    • /
    • 2015
  • For construction projects it is imperative that site management gives the highest priority to planning safe site evacuation for all foreseeable emergencies, including earthquakes and typhoons which are often experienced in Japan. This is especially important and even more critical for high risk projects involving underground works, such as Tunneling & Pneumatic Caissons. Based on the safety regulation of underground works, a back-up power supply system must be provided during the construction period at all times. Often, fluorescent lamps with re-chargeable batteries are provided for infrequent emergency cases, however these have a questionable useable life span and thus need careful maintenance and periodical replacement. In this paper we focused on using the phosphorescence materials to indicate the evacuation direction. As a result, it was confirmed that the phosphorescence materials were considered useful in reducing panic and facilitating a controlled evacuation in the event of a total black-out due to power failure.

  • PDF

디젤발전기 엔진 상태 진단 기술의 발전소 적용 연구 (A Study on the Power Plant Application of Engine Condition Diagnosis Technology for Diesel Generator)

  • 최광희;이상국
    • 동력기계공학회지
    • /
    • 제17권4호
    • /
    • pp.17-22
    • /
    • 2013
  • Diesel generator of nuclear power plant has a role for supply of emergency electric power to protect reactor core system in event of loss of off-site power supply. Therefore diesel generator should be tested periodically to verify the function that can supply specified frequency and voltage at design power level within limited time. For this purpose, appropriate maintenances in case that abnormal conditions were found are required in allowed time. In this paper, results of development of engine condition diagnosis technology and study on power plant of its technology for diesel generator are described.

풍력터빈 나셀 냉각시스템의 급.배기 위치 평가 (Estimation on locations of air-supply and exhaust ports in the nacelle of wind turbine)

  • 우상우;김현태;이진형;이기학;박종포
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2011년 춘계학술대회논문집
    • /
    • pp.240-242
    • /
    • 2011
  • Wind power system is generally divided into the onshore wind turbine and the offshore wind turbine according to site locations. The offshore wind turbine is manufactured as a closed nacelle cooling system including a heat exchanger to prevent corrosion, but the onshore wind turbine is manufactured as open nacelle cooling system dependent on only the outdoor air without a heat exchanger. The indoor of a nacelle which is composed of a generator, foil power converters and a gearbox with a lot of heat is very narrow and airtight. This aim of the study is to demonstrate the temperature effect depending on positions of air-supply and exhaust ports. And this study discusses the flow field and removal efficiency of heat caused by components.

  • PDF

차세대원전 안전등급모선의 전원공급 다중성 연구 (Study on the Diversity of Power supply to Safety related Bus in Korean Next Gener)

  • 윤정현;지문구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1170-1172
    • /
    • 1998
  • The electrical power of nuclear power plant consists of Safety related power systems and Non-Safety related power systems. The safety related power systems are designed to have sufficient capacity to safely shut down the unit and to mitigate the effects of an accident assuming loss of off-site power. This paper presents the operation scheme of the safety related power system for several plant conditions in Korean Next Generation Reactor and reviews the diversity of power supply to the safety related bus.

  • PDF

전기자동차 운행을 위한 태양광발전소 수요 예측 (Prediction of Demand for Photovoltaic Power Plants for Electric Vehicle Operation)

  • 최회균
    • 한국태양에너지학회 논문집
    • /
    • 제40권4호
    • /
    • pp.35-44
    • /
    • 2020
  • Currently, various policies regarding ecofriendly vehicles are being proposed to reduce carbon emissions. In this study, the required areas for charging electric vehicle (EV) batteries using electricity produced by photovoltaic (PV) power plants were estimated. First, approximately 2.4 million battery EVs, which represented 10% of the total number of vehicles, consume approximately 404 GWh. Second, the power required for charging batteries is approximately 0.3 GW, and the site area of the PV power plant is 4.62 ㎢, which accounts for 0.005% of the national territory. Third, from the available sites of buildings based on the region, Jeju alone consumes approximately 0.2%, while the rest of the region requires approximately 0.1%. Fourth, Seoul, which has the smallest available area of mountains and farmlands, utilizes 0.34% of the site for PV power plants, while the other parts of the region use less than 0.1%. The results of this study confirmed that the area of the PV power plant site for producing battery-charging power generated through the supply of EVs is very small. Therefore, it is desirable to analyze and implement more specific plans, such as efficient land use, forest damage minimization, and safe maintenance, to expand renewable energy, including PV power.

발전소 복수 공급 배관계의 고진동과 분기 배기배관의 절손 규명 (Examination on High Vibration and Branch Vent Pipe's Failure of Complex Piping System Suppling Condensate-Water in Power Site)

  • 김연환
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2010년도 추계학술대회 논문집
    • /
    • pp.380-384
    • /
    • 2010
  • A disturbance flow at piping bands and discontinuous regions such as a valve, a header has a intense broadband internal pressure field and a sound field which are propagated through the piping system The fields becomes the source of a vibration of this piping system. Intense broadband disturbance flow at a discontinuous region such as elbows, valves or headers generates an acoustical pulsation. The pulsation becomes the source of structural vibration at the piping system. If it coincides with the natural frequency of the pipe system, excessive vibration results. High-level vibration due to the pressure pulsation affects the reliability of the plant piping system. This paper discusses the high vibration and the branch vent pipe's failure of condensate-water supply piping system due to the effect of acoustical pulsations by flow turbulence from the flow control valves of globe type in a power site.

  • PDF

LNG발전소 입지선정에 관한 주민 수용성 제고연구 (On the Social Acceptance of Site Selection for a LNG Power Plant)

  • 박동규;이재헌
    • 플랜트 저널
    • /
    • 제18권3호
    • /
    • pp.41-51
    • /
    • 2022
  • 최근 LNG발전소 건설이 늘어나고 주민들의 삶의 질 향상 욕구가 증가함에 따라 건설 추진과정에서 주민과의 갈등으로 인한 건설사업 지연으로 전력수급 안정화를 저해하거나 사회적 비용이 증가하는 실정이다. 이에 주민 수용성 강화방안을 연구하여 추후 발전소 건설추진에 도움이 되었으면 하는 바람에서 이 연구를 하였다. 여기서는 주민들의 반대가 가장 심한 단계이며 사업 지연으로 인한 경제적·사회적 손실발생은 물론 극단적일 경우 사업취소까지 연결될 수 있는 입지선정 단계에 한해서 연구를 하였다. 이를 위해 최근 10년 이내 준공한 LNG발전소 준공지연사례를 통해 수많은 발전소가 당초 계획보다 짧게는 수개월에서 길게는 몇 년씩 준공이 지연된 사례를 살펴보았으며, 특히 음성천연가스발전소와 대구LNG발전소 건설 준비중 갈등사례를 분석하여 주민 수용성 제고를 위해서는 첫째 발전소 입지 선정 시 주민의견 수렴이 필요함을 알 수 있었고 둘째 발전소 주변지역 지원에 관한 법률 정비 등 법규 개정이 수반되어야 하며 셋째 발전설비 최신기종 선정 등 환경 친화적 설비구성에 최선을 다해야 함을 알 수 있었다.

  • PDF