• Title/Summary/Keyword: on-site power supply

Search Result 76, Processing Time 0.026 seconds

A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method (최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구)

  • Choe, Gyu-Sik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTAMethod (FTA기법에 의한 원전기동전원의 이용율 예측에 관한 연구)

  • Che, Gyu-Shik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.5
    • /
    • pp.517-523
    • /
    • 1999
  • The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.

  • PDF

KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site (이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획)

  • Song, Inho;Oh, Jong-Seok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.5
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

Study on the Safe Evacuation Management in a Power Supply Disturbed Emergency

  • Suzuki, Nobuyuki;OHASHI, Tsubasa;WHORLOW, James R
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.87-91
    • /
    • 2015
  • For construction projects it is imperative that site management gives the highest priority to planning safe site evacuation for all foreseeable emergencies, including earthquakes and typhoons which are often experienced in Japan. This is especially important and even more critical for high risk projects involving underground works, such as Tunneling & Pneumatic Caissons. Based on the safety regulation of underground works, a back-up power supply system must be provided during the construction period at all times. Often, fluorescent lamps with re-chargeable batteries are provided for infrequent emergency cases, however these have a questionable useable life span and thus need careful maintenance and periodical replacement. In this paper we focused on using the phosphorescence materials to indicate the evacuation direction. As a result, it was confirmed that the phosphorescence materials were considered useful in reducing panic and facilitating a controlled evacuation in the event of a total black-out due to power failure.

  • PDF

A Study on the Power Plant Application of Engine Condition Diagnosis Technology for Diesel Generator (디젤발전기 엔진 상태 진단 기술의 발전소 적용 연구)

  • Choi, Kwang-Hee;Lee, Sang-Guk
    • Journal of Power System Engineering
    • /
    • v.17 no.4
    • /
    • pp.17-22
    • /
    • 2013
  • Diesel generator of nuclear power plant has a role for supply of emergency electric power to protect reactor core system in event of loss of off-site power supply. Therefore diesel generator should be tested periodically to verify the function that can supply specified frequency and voltage at design power level within limited time. For this purpose, appropriate maintenances in case that abnormal conditions were found are required in allowed time. In this paper, results of development of engine condition diagnosis technology and study on power plant of its technology for diesel generator are described.

Estimation on locations of air-supply and exhaust ports in the nacelle of wind turbine (풍력터빈 나셀 냉각시스템의 급.배기 위치 평가)

  • Woo, S.W.;Kim, H.T.;Lee, J.H.;Lee, K.H.;Park, J.P.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.240-242
    • /
    • 2011
  • Wind power system is generally divided into the onshore wind turbine and the offshore wind turbine according to site locations. The offshore wind turbine is manufactured as a closed nacelle cooling system including a heat exchanger to prevent corrosion, but the onshore wind turbine is manufactured as open nacelle cooling system dependent on only the outdoor air without a heat exchanger. The indoor of a nacelle which is composed of a generator, foil power converters and a gearbox with a lot of heat is very narrow and airtight. This aim of the study is to demonstrate the temperature effect depending on positions of air-supply and exhaust ports. And this study discusses the flow field and removal efficiency of heat caused by components.

  • PDF

Study on the Diversity of Power supply to Safety related Bus in Korean Next Gener (차세대원전 안전등급모선의 전원공급 다중성 연구)

  • Yun, Jung-Hyun;Chi, Mun-Goo
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1170-1172
    • /
    • 1998
  • The electrical power of nuclear power plant consists of Safety related power systems and Non-Safety related power systems. The safety related power systems are designed to have sufficient capacity to safely shut down the unit and to mitigate the effects of an accident assuming loss of off-site power. This paper presents the operation scheme of the safety related power system for several plant conditions in Korean Next Generation Reactor and reviews the diversity of power supply to the safety related bus.

  • PDF

Prediction of Demand for Photovoltaic Power Plants for Electric Vehicle Operation (전기자동차 운행을 위한 태양광발전소 수요 예측)

  • Choi, Hoi-Kyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.40 no.4
    • /
    • pp.35-44
    • /
    • 2020
  • Currently, various policies regarding ecofriendly vehicles are being proposed to reduce carbon emissions. In this study, the required areas for charging electric vehicle (EV) batteries using electricity produced by photovoltaic (PV) power plants were estimated. First, approximately 2.4 million battery EVs, which represented 10% of the total number of vehicles, consume approximately 404 GWh. Second, the power required for charging batteries is approximately 0.3 GW, and the site area of the PV power plant is 4.62 ㎢, which accounts for 0.005% of the national territory. Third, from the available sites of buildings based on the region, Jeju alone consumes approximately 0.2%, while the rest of the region requires approximately 0.1%. Fourth, Seoul, which has the smallest available area of mountains and farmlands, utilizes 0.34% of the site for PV power plants, while the other parts of the region use less than 0.1%. The results of this study confirmed that the area of the PV power plant site for producing battery-charging power generated through the supply of EVs is very small. Therefore, it is desirable to analyze and implement more specific plans, such as efficient land use, forest damage minimization, and safe maintenance, to expand renewable energy, including PV power.

Examination on High Vibration and Branch Vent Pipe's Failure of Complex Piping System Suppling Condensate-Water in Power Site (발전소 복수 공급 배관계의 고진동과 분기 배기배관의 절손 규명)

  • Kim, Yeon-Whan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2010.10a
    • /
    • pp.380-384
    • /
    • 2010
  • A disturbance flow at piping bands and discontinuous regions such as a valve, a header has a intense broadband internal pressure field and a sound field which are propagated through the piping system The fields becomes the source of a vibration of this piping system. Intense broadband disturbance flow at a discontinuous region such as elbows, valves or headers generates an acoustical pulsation. The pulsation becomes the source of structural vibration at the piping system. If it coincides with the natural frequency of the pipe system, excessive vibration results. High-level vibration due to the pressure pulsation affects the reliability of the plant piping system. This paper discusses the high vibration and the branch vent pipe's failure of condensate-water supply piping system due to the effect of acoustical pulsations by flow turbulence from the flow control valves of globe type in a power site.

  • PDF

On the Social Acceptance of Site Selection for a LNG Power Plant (LNG발전소 입지선정에 관한 주민 수용성 제고연구)

  • Park, Dongkyu;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.18 no.3
    • /
    • pp.41-51
    • /
    • 2022
  • Recently, LNG power plants are increasing drastically and the desire of an improvement in the quality of life is growing. The delay of power plant construction can hinder the stability of power supply and increase the cost. So this study was conducted to help power plant construction progressing from now on by studying on the social acceptance of a LNG power plant. On this study I limited the scope of the study to the stage of Site Selection which is the most conflict stage and can interrupt the project. To conduct this study I researched the recently constructed power plants which have been delayed, in particular Eumseong Natural Power Plant and Daegu LNG Power Plant which are under bitter conflicts with local residents and have difficulty in construction progressing. So I found out that it is very important to collect the opinions of the residents in the stage of Site Selection and it is necessary to change ACT ON ASSISTANCE TO ELECTRIC POWER PLANTS- NEIGHBORING AREAS. Lastly it is very important to adapt the state-of-the-art facilities to increase the social acceptance of a LNG power plant.

  • PDF