• Title/Summary/Keyword: on-line scheduling

Search Result 172, Processing Time 0.026 seconds

Development of Scheduling System for Production of the Hydraulic Control Valve of Construction Equipment (건설기계 유압밸브 생산을 위한 일정계획 시스템 개발)

  • Kim, Ki-Dong;Lee, Bo-Hurn
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.61-67
    • /
    • 2007
  • The construction machine is the composite machine assembled by about 30,000 parts. Excavator, one kind of a construction machine, plays the leading role for export of construction equipment. It is generally impossible to produce all of the items within one company. Especially the supply of hydraulic control valves, one of the core part of the construction equipment, depends on the import heavily. So it is important to make an efficient production plan of hydraulic control valves in the company. The most important thing for the production scheduling of a hydraulic control valve is to make production schedule keeping the start date for assembly line for an excavator and to make minimization of the stock level. The production plan of hydraulic control valve includes the decision of the quantity supplied by subcontractor. This paper presents a scheme for a scheduling system of the hydraulic control valve considering the schedule of the assembly line for excavator production. This paper provides a methodology, which can make a plan of supply and production and generate a detailed schedule for daily production.

  • PDF

Mixed-Integer programming model for scheduling of steelmaking processes (철강 공정의 일정계획을 위한 혼합정수계획 모델)

  • Bok, Jin-Gwang;Lee, Dong-Yeop;Park, Seon-Won
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.5 no.6
    • /
    • pp.714-723
    • /
    • 1999
  • This paper presents a short-term scheduling algorithm for the operation of steelmaking processes. The scope of the problem covers refining of the hot iron transferred form a blast furnace, ladle treatment, continuous casting, hot-rolling, and coiling for the final products that should satisfy the given demand. The processing time at each unit depends on how much the batch amount is treated, and te dedicated intermediate storage with finite capacity between the units is considered. Resource constraints and initial amount of each state are incorporated into the presented scheduling model for the algorithm of on-line scheduling. We propose amixed integer linear programming (MILP) model with two objectives for the scheduling. The first is to maximize the total profit while atisfying the due date constraint for each product. And the second is to minimize the total processing time, makespan, while satisfying the demand for each product. Especially, we observe the effect of penalizing the intermediate storage and the inventory level of the final product on the scheduling results.

  • PDF

Packet Scheduling Mechanism to Improve TCP Throughput Using Link State Information in Wireless Networks (무선 네트워크에서 링크 상태 정보를 이용하는 TCP 효율 향상을 위한 패킷 스케줄링 매커니즘)

  • Kim Seong-Cheol;Lee Jin-Young
    • Journal of Korea Multimedia Society
    • /
    • v.7 no.10
    • /
    • pp.1443-1451
    • /
    • 2004
  • In this paper we propose a new packet scheduling mechanism to improve TCP throughput and fairness with estimated link state information in wireless networks, in which mobile hosts are receivers. Since a priori estimated link state information is used in this proposed mechanism, the entire packet transmission time can be reduced. In other words, packets scheduling procedure is performed before packets are transmitted using estimated link state. The proposed mechanism also has an temporary FIFO queue to store packets which are on the head of queue and can not be transmitted due to bad link state. Using this temporary FIFO queue, HOL(Head of Line) problem of FIFO queue can be resolved.

  • PDF

Development of integrated scheduling system for virtual manufacturing system

  • Roh, Kyoungyun;Noh, Sangdo;Lee, Kyoil
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10a
    • /
    • pp.354-357
    • /
    • 1996
  • Virtual Manufacturing System(VMS) is an integrated computer based model which has physical, logical schema and behavior of real manufacturing system. In this paper, an integrated scheduling system is developed to simulate and control a Virtual Factory. A workflow model is constructed to define and analyze the structure of a VMS. On-line dynamic dispatching system is developed using MultiPass algorithm and scheduling system considering dynamic CAPP is carried out. Integrated scheduling system developed in this paper reduces the discrepancies between virtual model and real manufacturing system, and control of real shop floor is possible.

  • PDF

A Study on the Constrained Dispatch Scheduling Using Linear Programming for TWBP (선형계획법을 이용한 양방향입찰시장에서의 제약급전계획 연구)

  • Kim Gwang Won;Lee Jong-Bae;Jung Jung-Won
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.10
    • /
    • pp.573-580
    • /
    • 2004
  • A new real-time constrained dispatch scheduling (CDS) is needed for TWBP. The CDS needs to be performed at every dispatch period to decide generation power of scheduling generators and amounts of scheduling load. Therefore, the CDS is not based on real generation costs but on bidding data of market participants with some constraints such as power balance, generation limits, ancillary service, and transmission line limits. This paper selects linear programming(LP) as an optimization tool for the CDS and presents effective formulae for the LP application. This paper also presents the way of minimizing the number of variables and constraints of the LP to improve real-time applicability.

PCB 생산라인에서의 호이스트 스케쥴링을 위한 유전자알고리즘의 응용

  • 임준묵
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.1 no.1
    • /
    • pp.29-62
    • /
    • 1996
  • In this paper, the problem of determining cyclic schedules for a material handling hoist in the printed-circuit-board(PCB) electroplating line is considered. The objective of this research is to determine an optimal simple-cycle schedule of the hoist which in turn maximizes the line throughput rate. Previous approaches to the cyclic hoist scheduling problem are all mathematical programming-based approaches to develop cyclic schedules(Mixed Integer Programming, Linear Programming based Branch and Bound, Branch and Bound Search Method and so on). In this paper, a genetic algorithm-based approach for a single hoist scheduling in the PCB electroplating line is described. Through some experiments for the well known example data and randomly generated data, the proposed algorithm is shown to be more efficient than the previous mathematical programming-based algorithm.

Heuristic Procedure on Minimizing Makespan for Preemptive Sequence Dependent Job Scheduling with Parallel Identical Machines (일시(一時) 작업중단(作業中斷)을 허용(許容)하는 순서종속작업(順序從屬作業)을 병행기계(並行機械)로서 makespan 최소화(最小化)를 도모(圖謀)하는 발견적(發見的) 방법(方法))

  • Won, Jin-Hui;Kim, Man-Sik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.13 no.2
    • /
    • pp.35-46
    • /
    • 1987
  • To minimize makespan for preemptive sequence dependent job scheduling with parallel identical processors, fundamental results, as the basis of new algorithm to be presented, such as McNauton's algorithm for independent jobs, Hu's characterization for dependent jobs, and Muntz-Coffman's algorithm, were first introduced. Then a huristic procedure was presented applying those concepts of zoning of assembly line balancing and of resource leveling on CPM network scheduling with two or more of parallel machines in general. New procedure has eliminated presumative machine assignment using ${\rho}$, rate of resource capability (${\rho}$ < 1), for practical scheduling.

  • PDF

A Study on Machine and AGV Dispatching in Flexible Manufacturing Systems (유연생산 시스템에서 기계와 무인 운반차의 할당규칙에 관한 연구)

  • 박성현;노인규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.81-89
    • /
    • 1997
  • This study is concerned with the scheduling problems in flexible manufacturing systems(FMSs). The scheduling problem in FMSs is a complex one when the number of machines and jobs are increased. Thus, a heuristic method is recommended in order to gain near-optimal solutions in a practically acceptable time. The purpose of this study is to develope a machine and AGV dispatching algorithm. The proposed dispatching algorithm is a on-line scheduling algorithm considering the due date of parts and the status of the system in the scheduling process. In the new machine and AGV dispatching algorithm, a job priority is determined by LPT/LQS rules considering job tardiness. The proposed heuristic dispatching algorithm is evaluated by comparison with the existing dispatching rules such as LPT/LQS, SPT/LQS, EDD/LQS and MOD/LQS. The new dispatching algorithm is predominant to existing dispatching rules in 100 cases out of 100 for the mean tardiness and 89 cases out of 100 for the number of tardy jobs.

  • PDF

Priority-based Scheduling Methods for Real-time Tasks of Massively Multiplayer On-line Game Systems (대규모 다중사용자용 온라인 게임 시스템의 실시간 태스크를 위한우선순위 스케쥴링 기법)

  • Kim, Jinhwan
    • Journal of Korea Multimedia Society
    • /
    • v.16 no.4
    • /
    • pp.493-501
    • /
    • 2013
  • A key challenge in massively multiplayer on-line game(MMOG) systems is providing real-time response latencies to the large number of concurrent game players. MMOG systems are a kind of soft real-time systems because requests from many players should be responded within specified time constraints. Client events have different timeliness and consistency requirements according to their nature in the game world. These requirements lead to tasks with different priorities on CPU processing. In order to meet their timing constraints, we propose priority scheduling methods that attempt to allocate preferentially more CPU bandwidth to serve an task with the higher priority level in the presence of transient overloading. The proposed scheduling methods are capable of enhancing real-time performance of MMOG system by maximizing the number of tasks with higher priority completed successfully within their deadlines while minimizing total average latency of tasks finished after given deadlines. The performance of these scheduling methods is evaluated through extensive simulation experiments.

Selecting the Critical Resources Using DBR on Multi-parameters (DBR 스케줄링에 있어 제약자원 선정에 관한 연구)

  • 서장훈;홍석묵;박명규
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.1
    • /
    • pp.131-139
    • /
    • 2002
  • Since introducing the "Theory of Constraints" by Goldratt, its effect was verified by lots of scholars, men of enterprise. These days it is also introducing and studying in this country with good results. The objective of this study is to show how to determine the constraint resources on DBR scheduling. Actually, previous studies based on the line which just think a load/capacity rate on doing scheduling. This study will show a scheduling method which reflects multi-parameters. It could be a standard to reflect real manufacturing surroundings. On calculating a priority of each resources, we classified factors with subjective and objective factors. And we propose a decision model to incorporate values assigned by a group of experts on different factors to select a critical resource. On deploying this model, SN ratio of Taguchi method for each of subjective and objective factors will be used. And we propose a procedure which is organized with 7 steps. To understand the logic, a numerical manufacturing simulation will be presented. This method is a incorporating decision model on determining the constraint on multi parameters with experts.h experts.