• Title/Summary/Keyword: offshore wind

Search Result 850, Processing Time 0.031 seconds

The Development of the Foundation of Offshore Wind Turbines (해상풍력발전용 Foundation에 관한 해외 동향)

  • Wei, Shi;Park, Hyun-Chul
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.290-294
    • /
    • 2008
  • Offshore wind farms will contribute significantly to the renewable generation of electricity for the world. The economic development of wind farms depends, however, on development of efficient solutions to a number of technical issues, one of these being the foundations for the offshore turbines. We review here the results of recent research for wind turbine foundations. Also it is a short overview of some of the challenges facing the growth of offshore wind energy foundation technology.

  • PDF

Analysis on Siting Strategy for Offshore Wind Farm Based on National Wind Map and GIS (국가바람지도 및 지리정보시스템 기반의 해상풍력단지 입지전략 연구)

  • Kim, Hyun-Goo;Song, Kyu-Bong;Hwang, Sun-Young;Yun, Jin-Ho;Hwang, Hyo-Jeong
    • Journal of Environmental Science International
    • /
    • v.18 no.8
    • /
    • pp.877-883
    • /
    • 2009
  • This study has analyzed the scale, location, resource potential and feasibility of offshore wind farm scientifically and systematically based on the national wind map and GIS. For long-term wind power development, this study pursues siting strategy building, selection of target area and deciding development priority as well as the presenting a basis for assessment that are necessary for policy decision making by making theme layers under GIS environment. According to the analysis after organizing technological development by stages, even if only the most suitable sites are developed among the area of offshore wind farm candidates that can be developed under the current technological standard, it has been evaluated as being able to develop about 3 times of the wind power dissemination target until 2012. It is expected that about 5% of territorial water area can be developed in a short-term future while the southern offshore area possessing relatively favorable wind resource than the western offshore has been identified as the most feasible site. While about 23% of territorial water area has been classified as potential area for offshore wind farm development in a long-term future, even Jeju Island and offshore of Ulsan possessing excellent wind resource have been analyzed as feasible sites. The feasibility assessment of offshore wind lam development established by this study is expected to assist national strategy building for accomplishing the wind power dissemination target.

Assessment of Possible Resources and Selection of Preparatory Sites for Offshore Wind Farm around Korean Peninsula (국내 해역의 해상풍력 가능자원 평가 및 예비부지 선정)

  • Kim, Ji-Young;Kang, Keum-Seok;Oh, Ki-Yong;Lee, Jun-Shin;Ryu, Moo-Sung
    • New & Renewable Energy
    • /
    • v.5 no.2
    • /
    • pp.39-48
    • /
    • 2009
  • Recently, developing the offshore wind farm in Korean peninsula is widely understood as essential to achieve the national target for the renewable energy. As part of national plan, KEPRI (Korea electric power research institute) is performing the front running project for the offshore wind farm development that is dedicated to investigate the possible resources based on the economy considering current technological status. It also includes the selection of the first sea area among candidates and optimal design of the offshore wind farm, etc. In this paper the interim results of the project are summarized that the possible capacity for the offshore wind farm can be estimated conservatively around 18 GW regarding the wind power class, sea depth and social constraint. The five western sea areas near Taean, Gunsan, Gochang, Yeonggwang, Sinan were chosen for the candidating sites. Detailed analysis for these sites will be conducted to finalize the first-going offshore wind farm in Korea.

  • PDF

Practical Application of Remote-Sensing Data for Offshore Wind Resource Assessment (해상 풍력자원평가를 위한 원격탐사자료의 활용)

  • Kim, Hyun-Goo;Hwang, Hyo-Jeong;Kyong, Nam-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.319-320
    • /
    • 2008
  • This paper introduces remote-sensing data which can be practically applied for offshore wind resource assessment. Development of offshore wind energy is inevitable for Korea to achieve the national dissemination target of renewable energy, i.e., 5% uptil 2010. However, the only available offshore in-situ measurement, marine buoy data would not represent areal wind characteristics. Consequently, remote-sensing technology has been started to apply to offshore wind resource assessment and is actively developing. Among them, NCAR/NCEP reanalysis dataset, QuikSCAT blended dataset, and offshore wind retrieval from SAR imagery are briefly summarized in this paper.

  • PDF

Analyzing Offshore Wind Power Patent Portfolios by Using Data Clustering

  • Chang, Shu-Hao;Fan, Chin-Yuan
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.1
    • /
    • pp.107-115
    • /
    • 2014
  • Offshore wind power has been extremely popular in recent years, and in the energy technology field, relevant research has been increasingly conducted. However, research regarding patent portfolios is still insufficient. The purpose of this research is to study the status of mainstream offshore wind power technology and patent portfolios and to investigate major assignees and countries to obtain a thorough understanding of the developmental trends of offshore wind power technology. The findings may be used by the government and industry for designing additional strategic development proposals. Data mining methods, such as multiple correspondence analyses and k-means clustering, were implemented to explore the competing technological and strategic-group relationships within the offshore wind power industry. The results indicate that the technological positions and patent portfolios of the countries and manufacturers are different. Additional technological development strategy recommendations were proposed for the offshore wind power industry.

Suitability Review on Development Plans of Offshore Wind Farm Based on National Wind Map and Geographic Information (국가바람지도 및 국가지리정보에 의한 해상풍력단지 개발계획의 적합성 검토)

  • Kim, Hyun-Goo;Hwang, Hyo-Jung;Song, Kyu-Bong;Hwang, Sun-Young;Yun, Jin-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.534-535
    • /
    • 2009
  • The objective of this research aims preliminary assessments of the proposed plans of offshore wind farm development based on the recently established national offshore wind map and suitability assessment system of offshore wind farm. Incheon Mueodo, Busan Dadaepo-Gadukdo, Sinangun Haeodo have been assessed considering geographic constraints such as water depth, offshore distance, national park, grid connection, and meteorological constraint such as wind power density and wind direction. According to the assessment, Mueodo plan has a weak point in grid connection and several geographic limitations are involved in Haeodo plan while Dadaepo-Gadukdo seems the most possible plan among the review cases. Because of limited assessment in this research, more detail and further consideration are necessary to make a decision of a feasibility project at proposed sites.

  • PDF

Developing a Methodology for Stakeholder Participation in Site Feasibility Studies for Offshore Wind Farms (해상풍력 입지타당성 조사단계에서의 이해관계자 참여 방법론 개발)

  • Jongmun Park;Kongjang Cho
    • Journal of Wind Energy
    • /
    • v.14 no.2
    • /
    • pp.5-13
    • /
    • 2023
  • As offshore wind farms are developed, the importance of cooperation with stakeholders such as fishermen from the initial phase is gradually increasing. This study developed a methodology that can promote the involvement of fishermen in the site feasibility review process. The spatial scope is Gunsan City, which is establishing an initial offshore wind project strategy. A survey was conducted for representatives of 12 fishing villages on the location preference for offshore wind farms. As a result, fishermen suggested negotiable or absolute opposite locations by examining a local sea map. Location preference seems to depend on the degrees of vitalization of fisheries using vessels. This study shows that fishermen can have reasonable opinions according to the location, not unconditionally, in initial discussions on offshore wind power. Investigating stakeholders with various positions is essential, and adjustments are needed for conflicting points in the future.

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.1
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.

Regulatory Pathways for Siting and Permitting Offshore Wind Facilities (해상풍력발전시설의 부지 및 허가에 관한 승인절차)

  • Yang, Hyoung-Seon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.1
    • /
    • pp.71-77
    • /
    • 2014
  • According to the increasement of demand for energy around globe, the concern degree of advanced countries for ocean energy including offshore wind power becomes excited. In domestic case, the government set up a goal that jumps up to the third ranked powerful nation of offshore wind in the world until 2020 and announced "The plan for 2.5-gigawatt wind farm off the south-west coast by 2019". Also the legal basis was created in order to support development of offshore wind power as 'A law on development, use, supply and promotion for New energy and renewable energy' was established by law. However to promote offshore wind power projects, there are much difficulties that developers should be applied by permitting use of public water surface and regulations of several domestic public institution. Therefore in this paper, we suggested an alternative to promote efficient offshore wind power projects by comparative analysis between domestic and foreign on regulatory pathways for siting and permitting offshore wind facilities.

Response Analysis of MW-Class Floating Offshore Wind Power System using International Standard IEC61400-3-2

  • Yu, Youngjae;Shin, Hyunkyoung
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.6
    • /
    • pp.454-460
    • /
    • 2020
  • In 2019, the Korean government announced the 3rd Basic Plan for Energy, which included expanding the rate of renewable energy generation by 30-40% by 2040. Hence, offshore wind power generation, which is relatively easy to construct in large areas, should be considered. The East Sea coast of Korea is a sea area where the depth reaches 50 m, which is deeper than the west coast, even though it is only 2.5 km away from the coastline. Therefore, for offshore wind power projects on the East Sea coast, a floating offshore wind power should be considered instead of a fixed one. In this study, a response analysis was performed by applying the analytical conditions of IEC61400-3-2 for the design of floating offshore wind power generation systems. In the newly revised IEC61400-3-2 international standard, design load cases to be considered in floating offshore wind power systems are specified. The upper structure applied to the numerical analysis was a 5-MW-class wind generator developed by the National Renewable Energy Laboratory (NREL), and the marine environment conditions required for the analysis were based on the Ulsan Meteorological Buoy data from the Korea Meteorological Administration. The FAST v8 developed by NREL was used in the coupled analysis. From the simulation, the maximum response of the six degrees-of-freedom motion and the maximum load response of the joint part were compared. Additionally, redundancy was verified under abnormal conditions. The results indicate that the platform has a maximum displacement radius of approximately 40 m under an extreme sea state, and when one mooring line is broken, this distance increased to approximately 565 m. In conclusion, redundancy should be verified to determine the design of floating offshore wind farms or the arrangement of mooring systems.