Integrated CAD System for Ship and Offshore Projects

  • Suh, Heung-Won;Lee, Sung-Geun
    • International Journal of CAD/CAM
    • /
    • 제6권1호
    • /
    • pp.41-48
    • /
    • 2006
  • Nowadays major shipbuilding companies are trying to expand their business not only to shipbuilding but to offshore projects as well. DSME is one of them. DSME is trying to set up a flexible design and construction environment for shipbuilding and offshore construction in a single shipyard. The shipbuilding and offshore projects, however, have their unique technology but they need to be designed and constructed in one site. To support this new requirement, DSME has developed an integrated CAD system for ship and offshore projects. In this integrated design environment, the designers can design commercial ships and offshore projects in a flexible manner. Concurrent design is very important for ship and offshore design. As compared to the complexity of the product, the design period is quite short. In effect, the design system for the ship and offshore project has to support concurrent design. One essential point of concurrent design environment is a product model based design system. DSME has developed and implemented the 3D product model concurrent design environment based on Tribon M3. Tribon is a widely used CAD system in shipbuilding area that is developed by Tribon Solutions. DSME has both customized the Tribon system and developed in-house application systems to support its own design and production procedures. All the design objects are modeled in one common database to support concurrent design and accurate production. The major in-house development focused on the modeling automation and automatic drawing generation. During the drawing generation process many of the additional production information are also extracted from the 3D product model. In addition, several applications and functionalities have been developed to apply the shipbuilding based Tribon M3 system to offshore projects. The development of shape nesting, tubular connection, isometric drawing, grating nesting systems are the typical.

Challenges and Strategies for Commissioning of FLNG

  • Lee, Dong Hyun;Seo, Kwang Su;Yeo, Jong Su;Kim, Myung Ki
    • Journal of Advanced Research in Ocean Engineering
    • /
    • 제2권3호
    • /
    • pp.129-135
    • /
    • 2016
  • After the construction of offshore plants, the function and integrity of system in offshore plants should be commissioned. As the executor of many FLNG projects, Samsung Heavy Industries Co., Ltd has faced some challenges for commissioning which are not similar to those in other offshore project. This study shows the differences between the commissioning of typical offshore projects and the one of FLNG projects. By the characteristics of offshore, performing the commissioning activity of FLNG near shipyard as much as possible reduces the risk of malfunction. The possible solutions to achieve these strategies are introduced.

국가바람지도 및 국가지리정보에 의한 국내 해상풍력단지 개발계획의 비교분석 (Review on The Proposed Offshore Wind Farm Projects Using National Wind Atlas and National Geographic Information)

  • 김현구;황효정
    • 한국태양에너지학회 논문집
    • /
    • 제30권5호
    • /
    • pp.44-55
    • /
    • 2010
  • The proposed offshore wind farm projects, i.e., Mooudo offshore, Yeonggwang-Gochang offshore, Saemangeum offshore, Imjado offshore and Gadeokdo-Dadeapo offshore, were compared and analyzed using the Korea National Wind Mapand Wind Farm Suitability Assessment System developed by the Korea Institute of Energy Research. The suitability of the proposed areas was comprehensively assessed using geographic, economic constraints, wave condition and wind resource factors, but the focus of this paper was on the geographic constraints and wave conditions. Imjado had several geographical constraints, despite having a good wind power density, while Saemangeum had a relatively low wave height, shallow water depth, close substation and slow tidal current. It is anticipating that the present comparison and analysis could be used as reference guidelines when selecting and preparing the design of large-scale offshore wind farm in the near future.

해상풍력 발전사업의 합리적 절차를 위한 제도개선 방안 : 인허가를 중심으로 (System Improvement Measures for Rational Procedures of Offshore Wind Power Generation Projects : Focusing on Permits)

  • 강석규;문정갑;조문관
    • 수산경영론집
    • /
    • 제54권2호
    • /
    • pp.59-76
    • /
    • 2023
  • This study is to propose ways to improve the system for rational procedures for offshore wind power generation projects. The results of this study are summarized as follows. In order to quickly distribute and develop offshore wind power projects, the permitting period should be shortened through special laws, the government actively intervenes to support the formation and operation of privat-public councils to ensure residents' acceptance. In this way, it can be competitive in the future energy market. Above all, a special law (proposal) related to offshore wind power currently pending in the National Assembly should be passed as soon as possible. Finally, the government and local governments that manage public waters should provide active administrative support based on system improvement measures in consideration of these permits, and the project's main body should minimize damage to the marine environment and ecosystem. Through these subject-specific roles, offshore wind power generation will be able to reduce carbon emissions and help establish a sustainable energy production system.

사할린 연안 유전개발 프로젝트 현황과 전망 (A Summary of Oil and Gas Development Projects on Sakhalin Offshore and Its Prospects)

  • 임채환
    • 연구논문집
    • /
    • 통권28호
    • /
    • pp.111-121
    • /
    • 1998
  • Offshore of Sakhalin Island is one of potential oil and gas development fields in Russia. American and Japanese companies are actively participating in the developments. They plan to export the produced oil and gas to East Asia including Korea, Japan and China. So far, offshore oil and gas field developments are mainly concentrated in the Russian Arctic area such as Barents Sea, Kara Sea and Tinman-Pechora Sea. In this article, the projects under development on the Sakhalin Shelf are reviewed and the environmental conditions in this area are summarized. At the end, the future prospects of the Sakhalin developments are reviewed.

  • PDF

Business Collaboration Support for Offshore Software Development

  • Moriyasu, Takashi;Zu, Guowei;Tsuji, Hiroshi
    • Industrial Engineering and Management Systems
    • /
    • 제9권3호
    • /
    • pp.275-284
    • /
    • 2010
  • Offshore software development (OSD) is international business collaboration. OSD projects often encounter intercultural and inter-linguistic problems disturbing the projects. Business documents are formal media of information and knowledge for OSD. While OSD documents should convey common understanding of the OSD products, the documents may contain unsuitable expressions which draw misunderstanding of the required products and offensive issues for the collaboration. Intercultural and inter-linguistic differences cause mistakes and inappropriate expressions. OSD from Japan to China is the largest in Asia, and Japanese language is often used in OSD documents. Large similarity is found between Japanese and Chinese in their languages, while many differences exist even for the same word. The similarity induces to write unsuitable expressions for both sides of OSD. To introduce risks for OSD projects caused by unsuitable or inappropriate expressions in OSD documents, we propose to apply a proofreading system of Japanese documents for OSD. Japanese consignor uses the system to refine OSD documents written by Japanese engineers for Chinese readers, and Chinese consignee uses it to refine Japanese documents written by Chinese Engineers as derivatives of OSD projects. Effectiveness of applying the proofreading system is discussed for actual projects.

Review of the marine environmental impact assessment reports regarding offshore wind farm

  • Oh, Hyun-Taik;Chung, Younjin;Jeon, Gaeun;Shim, Jeongmin
    • Fisheries and Aquatic Sciences
    • /
    • 제24권11호
    • /
    • pp.341-350
    • /
    • 2021
  • The energy production of offshore wind farms plays an important role in expanding renewable energy. However, the development of offshore wind farms faces many challenges due to its incompatibility with marine environments and its social acceptability among the local community. In this study, we reviewed the marine environmental impact assessment status of offshore wind farm development projects for 2012-2019 in South Korea. A total of nine projects were selected for this study, all of which experienced considerable conflict with local fisheries resources. To appropriately respond to the underlying challenges faced by offshore wind farm development and in order to better support decision-making for future impact assessment, our findings identified: i) a need for adequate preliminary investigation and technical examination of fisheries resources; ii) a need to assess and estimate the impact of underwater noise, vibration, and electromagnetic waves on fisheries resources during wind farm construction and operation; and iii) a need for a bottom-up approach that allows for communication with local stakeholders and policy-makers to guarantee the local acceptability of the development.

해양 공사 EPC 견적용 중량 추산 방법에 관한 기초 연구 (A Preliminary Study on a Method for the Weight Estimation and Calculation of Offshore EPC Projects)

  • 이수호;안현식;허윤;배재류;김기수;함승호;이성민;노명일
    • 대한조선학회논문집
    • /
    • 제53권2호
    • /
    • pp.154-161
    • /
    • 2016
  • There are several existing studies for the weight estimation of offshore plants. However, most of them were applicable at the pre-FEED (Front End Engineering Design) stage. In this paper, a preliminary study on a method for the weight estimation and calculation of offshore EPC (Engineering Procurement Construction) projects is made for the use at the estimation stage after FEED. Based on literature surveys including ISO (International Organization for Standardization) 19901-5 about weight estimation, we proposes new weight factors and a weight curve. Weight factors defined in this study include MTO (Material Take-Off), estimated weight, FEED maturity factor, allowance factor, and contingency factor. The proposed method utilizes bottom-up approach for weight estimation and it can be used for the weight estimation and calculation of offshore EPC projects at the estimation stage.

해상풍력발전시설의 부지 및 허가에 관한 승인절차 (Regulatory Pathways for Siting and Permitting Offshore Wind Facilities)

  • 양형선
    • 해양환경안전학회지
    • /
    • 제20권1호
    • /
    • pp.71-77
    • /
    • 2014
  • 전 세계적으로 에너지 수요의 증가에 따라 해상풍력발전을 포함한 해양재생에너지 개발에 대한 선진국들의 관심도가 고조되고 있다. 국내의 경우 정부는 2020년 세계 3대의 해상풍력 강국으로 도약한다는 목표를 설정하고 2011년 11월 "서남해안 2.5GW 해상풍력개발 종합추진계획"을 발표하였다. 또한 '신에너지 및 재생에너지 개발 이용 보급 촉진법'의 제정으로 해상풍력발전 개발을 지원할 수 있는 법적근거가 마련되었다 그러나 해상풍력발전사업을 추진하기 위해서는 공유수면 사용의 허가와 여러 기관의 규제를 적용 받아야 하는 어려움이 있다. 따라서 본 연구에서는 해상풍력을 선도하는 국가들의 해상풍력발전의 부지 및 허가에 대한 규정을 검토하고 국내규정과의 비교분석 및 고찰을 통해 해상풍력발전사업을 효율적으로 추진할 수 있는 대안을 제시한다.

Integrated engineering environment for the process FEED of offshore oil and gas production plants

  • Hwang, Ji-Hyun;Roh, Myung-Il;Lee, Kyu-Yeul
    • Ocean Systems Engineering
    • /
    • 제2권1호
    • /
    • pp.49-68
    • /
    • 2012
  • In this paper, an offshore process front end engineering design (FEED) method is systematically introduced and reviewed to enable efficient offshore oil and gas production plant engineering. An integrated process engineering environment is also presented for the topside systems of a liquefied natural gas floating production, storage, and offloading (LNG FPSO) unit, based on the concepts and procedures for the process FEED of general offshore production plants. Various activities of the general process FEED scheme are first summarized, and then the offshore process FEED method, which is applicable to all types of offshore oil and gas production plants, is presented. The integrated process engineering environment is presented according to the aforementioned FEED method. Finally, the offshore process FEED method is applied to the topside systems of an LNG FPSO in order to verify the validity and applicability of the FEED method.