• Title/Summary/Keyword: occurred defect data.

Search Result 43, Processing Time 0.027 seconds

Open Heart Surgery of Ventricular Septal Defect in Infancy (영아기 심실중격결손의 개심술)

  • 조준용;허동명
    • Journal of Chest Surgery
    • /
    • v.29 no.3
    • /
    • pp.271-277
    • /
    • 1996
  • In selected cases, early corrective surgery is indicated in the management of infants having large ventricular septal defects. The risk of any surgical procedure in infancy is acknowledged to be great and should be avoided whenever possible. However this greater surgical risk is justified when the patient presents with intractable congestive heart failure, severe pulmonary hypertension, marked growth retardation, and recurrent prolonged lower respiratory infections. We analyzed 31 patients with ventricular septal defect in infancy who underwent surgical correction from January 1991 through December 1994. Age ranged from 6 months to 12 months with mean age of 9.2 months. Of the thirty-one patients, 23 patients were male and 8 patients were female. Mean body weight was 7. 4kg. The most common type of ventricular septal defect was perimembraneo s (64.5%). Associated cardiac anomalies were found in 17 patients (55.8%). Mitral regurgitation was the most commonly associated cardiac anomaly (16.1 %) and followed by patent ductus arteriosus (12.9%). When cardiac catheterization data were analysed, the most common range of Qp/qs, RpiRs, Pp/ps were 2.1∼ 3.0, 1-0.25, above 0.70 respectively. Among the indications of surgical correction, there were pulmonary hypertension in 20 patients, congestive heart failure in 3 patients, intractable respiratory infection in 10 patients and growth retardation in 14 patients. The most common surgical approach and method for closure of ventricular septal defect .were right atriotomy (58%) and Dacron patch closure (94%). Postoperative complications occurred in 10 cases (32%) and overall mortality was 12.9% (4 cases). All operative deaths in this series occurred in infants under the age of 8 months and weight of 8 kilograms.

  • PDF

A Study on Software Fault Analysis and Management Method using Defect Tracking System (결함 추적 시스템에 의한 소프트웨어 결함 분석 및 관리기법 연구)

  • Joon, Moon-Young;Yul, Rhew-Sung
    • The KIPS Transactions:PartD
    • /
    • v.15D no.3
    • /
    • pp.321-326
    • /
    • 2008
  • The software defects that are not found in the course of a project frequently appear during the conduct of the maintenance procedure after the complete development of the software. As the frequency of surfacing of defects during the maintenance procedure increases, the cost likewise increases, and the quality and customer reliability decreases. The defect rate will go down only if cause analysis and process improvement are constantly performed. This study embodies the defect tracking system (DTS) by considering the Pareto principle: that most defects are repetitions of defects that have previously occurred. Based on the records of previously occurring defects found during the conduct of a maintenance procedure, DTS tracks the causes of the software defects and provides the developer, operator, and maintenance engineer with the basic data for the improvement of the software concerned so that the defect will no longer be manifested or repeated. The basic function of DTS is to analyze the defect type, provide the measurement index for it, and aggregate the program defect type. Doing these will pave the way for the full correction of all the defects of a software as it will enable the defect correction team to check the measured defect type. When DTS was applied in the software configuration management system of the W company, around 65% of all its software defects were corrected.

Long Term Follow Up of Maxilla Reconstruction Following the Ablative Cancer Surgery (악성종양 절제술 후 상악 재건의 장기 추적관찰)

  • Lee, Han Earl;Ahn, Hee Chang;Choi, M.Seung Suk;Jo, Dong In
    • Archives of Plastic Surgery
    • /
    • v.34 no.4
    • /
    • pp.448-454
    • /
    • 2007
  • Purpose: The objective of this study was to evaluate the outcomes of using the free flap in the reconstruction of maxillary defects. Methods: 27 consecutive cases of maxillary reconstruction with free flap were reviewed. All clinical data were analyzed, including ideal selection of flap, time of reconstruction, recurrence of cancer, postoperative complications, flap design, and follow-up results. The main operative functional items, including speech, oral diet, mastication, eye globe position and function, respiration, and aesthetic results were evaluated. Results: Among the 24 patients who underwent maxillary reconstruction with the free flap, 14 patients underwent immediate reconstruction after maxillary cancer ablation, and 10 patients underwent delayed reconstruction. There occurred 1 flap loss. Recurrences of the cancer after the reconstruction happened in 2 cases. Postoperative complications were 3 cases of gravitational ptosis of the flap, 2 cases of the nasal obstruction, and 1 case of fistula formation. Out of 27 free flaps, there were 15 latissimus dorsi myocutaneous flaps, 5 radial forearm, 4 rectus abdominis myocutaneous flaps, 1 scapular flap, 2 fibula osteocutaneous flap, respectively. Flaps were designed such as 1 lobe in 9 cases, 2 lobes in 9 cases, and 3 lobes in 5 cases. Among the 14 patients who had intraoral defect or who had palatal resection surgery, 2 patients complained the inaccuracy of the pronunciation due to the ptosis of the flap. It was corrected by the reconstruction of the maxillary buttress and hung the sling to the upper direction. All of the 14 patients were able to take unrestricted diets. In 6 patients who had reconstruction of inferior orbital wall with rib bone graft, they preserved normal vision. Aesthetically, most of the patients were satisfied with the result. Conclusion: LD free flap is suggested in uni-maxilla defect as the 1st choice, and fibular osteocutaneous flap and calvarial bone graft to cover the larger defect in bi-maxilla defect.

Prediction technology on the source location of acoustic emission signal (음향방출 신호원의 위치추정 기법)

  • 이성재;김정석;강명창;정연식;정규동
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2003.04a
    • /
    • pp.293-298
    • /
    • 2003
  • This study deals with the source location method of defect which can be occurred in structure. The existing methods was very difficult to be applied to predict it because of using very complex numerical formula. The triangulation method which was proposed in his study can predict the source location predicted easily with small amount of data. Wave arrival time data can be directly converted into source-sensor distance is known. For this purpose, the propagation velocity was measured by Rayleigh wave, and the propagation behavior was analyzed. For the consideration of jointed part in structure, the source location method was applied to the welded workpiece. The signal propagation velocity was measured in welding part for the purpose of application to the part and the revised algorithm of source location was proposed.

  • PDF

Rupture of Achilles Tendon after Steroid Injection in Achilles Tendinitis (A Report of Five Cases) (아킬레스 건염에서 스테로이드 주입 후 아킬레스 건 파열 (5예 보고))

  • Kim, Jeon-Gyo;Gwak, Heui-Chul;Baik, Jong-Min
    • Journal of Korean Foot and Ankle Society
    • /
    • v.17 no.4
    • /
    • pp.309-315
    • /
    • 2013
  • Purpose: The purpose of the study was to investigate five cases with chronic Achilles tendon rupture that occurred after steroid injections. Materials and Methods: In our hospital, we experienced five cases of chronic Achilles tendon rupture from September 2010 to March 2012. All patients had got steroid injection for Achilles tendinitis at the other hospitals, and their heel pain was aggravated when they visited our outpatient department. After treatment, signs and symptoms of Achilles tendon rupture were developed and the diagnosis was confirmed by ultrasonography or magnetic resonance imaging (MRI). Surgical treatment was done for Achilles tendon rupture. Results: There was difference between intra-operative findings of Achilles tendon rupture and usual chronic Achilles tendon rupture. Unlike usual findings of chronic Achilles tendon rupture whose scar tissue or tissue attenuation are found around the defect area of Achilles tendon, there were partial necrosis of tendon severe adhesion with surrounding tissue, extensive defect and longitudinal rupture on ruptured area. Also, severe inflammation of paratenon, granulation and fibrinoid deposit were found on biopsy findings in four cases. Conclusion: Based on review of data about relative risk and benefit of local corticosteroid injection to inflammatory lesion in Achilles tendon, it requires more attention to Achilles tendon rupture following local corticosteroid injection.

Investigating the Impact of Project Management on Construction Defects in Housing Projects: With a Focus on Project Manager Experience (프로젝트 관리가 공동주택 건설의 하자 발생에 미치는 영향: 프로젝트 매니저 경험의 조절효과를 중심으로)

  • Young-Jun Lee;Seung-Chul Kim;Minjeong Oh;Sungyong Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.209-220
    • /
    • 2023
  • Recently, defects that occurred during the construction of apartment houses have become a social issue. Defects in apartment houses lead to waste of resources and economic loss, causing psychological and physical damage to customers, and a decrease in reliability and financial loss to construction companies. The purpose of this study was to analyze the impact of defect occurrence according to the difference in project management level in the apartment housing construction stage, and to investigate the extent to which the project manager's experience affects the defect occurrence rate. For the empirical analysis of the study, statistical analysis was conducted using data collected from 130 actual projects. The results of the analysis showed that schedule management, cost management, and quality management had a positive effect on reducing the defect occurrence rate in the execution stage of apartment housing construction, while human resource management productivity had a negative effect. This study theoretically demonstrated the importance of project management, and in practice, showed that schedule management, cost management, and quality management should be faithfully performed in the execution stage to reduce the rate of defects after project completion. It was also suggested that hiring an experienced project manager would help reduce project defects.

Prediction Technology on the Source Location of Acoustic Emission Signal in Plate with Welding Line (용접선을 갖는 판재에서 AE 신호원의 위치추정 기법)

  • 이성재;정연식;김정석;강명창;정규동
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.21 no.8
    • /
    • pp.57-64
    • /
    • 2004
  • This study deals with the prediction of defect location which can be occurred in structure. The existing methods was very difficult to be applied to predict it, because of complex numerical formula. The triangulation method proposed in this study can predict the source location easily with small amount of data. The arrival time of wave can be directly converted into the distance between sensors. For this purpose, the propagation velocity was measured by Rayleigh wave, and the propagation behavior was analyzed. The welded workpiece is adapted to investigate for the consideration of jointed part in structure, The propagation velocity of signal was measured in welded workpiece and the revised algorithm of source location was proposed.

Analysis of Response to Major Oil Spills in the Korean Coastal Waters

  • Yun Jong-Hwui;Yoon Yeong-Suk;Ko Seong-Jung
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2004.05b
    • /
    • pp.65-72
    • /
    • 2004
  • With data of historical spill from vessels occurred in korean coastal waters, the author analyze the causes of spill and evaluate response technique adopted during spill. It is found that the majority of spill caused by operational failure, bad weather, violation of navigation rule and hull defect. As a result of evaluation of response measures, it is suggested that responsible agency establishes criteria for various response options and standards of tier response time and capability according to the size of spill.

  • PDF

Case Study of Intermittent Engine Hesitation Fault Diagnosis By CKPS Fault (LPI차량에서 CKPS불량으로 주행 중 간헐적인 엔진부조 현상의 고장진단)

  • Kim, Sung Mo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.23 no.6
    • /
    • pp.624-629
    • /
    • 2014
  • The purpose of this study is to carry out the task of engine hesitation which occurred intermittently in driving due to the defective CKPS of LPI vehicles. As the result of the wrong data from the equipment of D-logger, the signal error of CKPS caused the engine hesitation. We performed a study in the followings to analyze and investigate the cause effectively. First, we have investigated the control wiring harness and connector pin contact defect inspection. Second, we have inspected the defection of CKPS separately. From this study, it was found that the engine hesitation were caused by the bad durability and we have showed how to diagnosis the fault of the engine hesitation intermittently while driving. Therefore, it is determined that we have to improve the durability of the CKPS through a strict quality control and to increase the reliability.

MV Cable Failure Statistics Analysis and Failure Rate Utilization Method of Prioritization of Diagnosis Targets (지중 배전용케이블 고장통계 분석 및 고장률 활용 진단대상 우선순위 선정방법)

  • Cho, Chong-Eun;Lee, On-You;Kim, Sang-Bong;Kim, Kang-Sik
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.263-268
    • /
    • 2021
  • This paper statistically analyzes the time required for each failure cause and describes a diagnostic method for 159 reports of failure analysis of MV cables that occurred in the distribution system of KEPCO over the past 18 years. In addition, the manufacturer's failure rate compared to 100C-km was calculated using 381 cases of MV cable deterioration failure between 2008 and 2020. It is hoped that this paper will help those in charge of maintaining underground facilities at the business office to use the failure rate to prioritize facility diagnosis.