The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning cannot use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning process in the power markets. This system is composed of Regulator and GENCO's model. Regulator model used multi-criteria decision making rule. GENCO model is very complex problem. Thus, this system transacted the part by several scenario assuming GENCO model.
In this paper, we present a frequency reassignment problem (FRP) arising from the reconfiguration of radio networks such as adding new base stations (BSs) and changing the number of frequencies assigned to BSs. For this problem, we develop an integer programming (IP) model that minimizes the sum of frequency reassignment cost and the cost for unsatisfied frequency demands, while avoiding interference among frequencies. To obtain tight lower bounds, we develop some valid inequalities and devise an objective function relaxation scheme. Also, we develop a simple but efficient heuristic procedure to solve large size problems. Computational results show that the developed valid inequalities are effective for improving lower bounds. Also, the proposed tabu search heuristic finds tight upper bounds with average optimality gap of 2.3%.
This paper proposes a method for solving running cost problem by minimizing switching reactive power compensation devices. An objective function was modeled by calculating the weighting value of cost, and a solution was derived using ILP. This paper suggests optimal coordinative control method between FACTS, Shunt Reactors, Capacitors and OLTC. Therefore, it is valuable for decision maker in determining order and capacity of devices which gaining a voltage stabilization. As a result, the objectives of voltage stabilization and cost minimization were achieved simultaneously. This realizes the economic efficiency of the system. We start by showing how to solve systems of linear equations using the language of pivots and tableaus. The effectiveness of this technique is demonstrated in modified PSS/E MIGUM 45 bus system. The simulation results show the effectiveness of this algorithm by comparing the outcome withseveral established methods.
Optimum cost design of a simply supported reinforced concrete beam is presented in this paper. In the formulation of the optimum design problem, the height and width of the beam, and reinforcement steel area are treated as design variables. The design constraints are implemented according to ACI 318-08 and studies in the literature. The objective function is taken as the cost of unit length of the beam consisting the cost of concrete, steel and shuttering. The solution of the design problem is obtained using the artificial bee colony algorithm which is one of the recent additions to metaheuristic techniques. The artificial bee colony algorithm is imitated the foraging behaviors of bee swarms. In application of this algorithm to the constraint problem, Deb's constraint handling method is used. Obtained results showed that the optimum value of numerical example is nearly same with the existing values in the literature.
Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.1187-1192
/
2005
Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.
In the preliminary design stage of prestressed concrete (PSC) box girder bridges, the design factors decided by inexperience designer could heavily affect to the results of final design. There is a possibility that the design ends up with an excessively wasteful design. To achieve an economical design with preventing an excessive design, the optimal design technique has been developed using ADS optimal program and SPCFRAME in this study. The objective function for the optimal design problem is the material cost of box girders and constrained functions are constituted with design specifications and workability. The Sequential Unconstraint Minimization Technique (SUMT) is used for the optimal design in this study. We designed an uniform cross-section bridge and an ununiform cross-section bridge in the same design condition by optimal design technique developed in this study. Analyzing the results obtained for various tendon layouts, we suggest a standard tendon layout which gives the most effective structural behavior.
Metaheuristic algorithms can work well in solving or optimizing problems, especially those that require approximation or do not have a good analytical solution. Particle swarm optimization (PSO) is one of these algorithms. The response quality of these algorithms depends on the objective function and its regulated parameters. The nonlinear nature of the pressurized light-water nuclear reactor (PWR) dynamics is a significant target for PSO. The two-point kinetics model of this type of reactor is used because of fission products properties. The proportional-integral-derivative (PID) controller is intended to control the power level of the PWR at a short-time transient. The absolute error (IAE), integral of square error (ISE), integral of time-absolute error (ITAE), and integral of time-square error (ITSE) objective functions have been used as performance indexes to tune the PID gains with PSO. The optimization results with each of them are evaluated with the number of function evaluations (NFE). All performance indexes achieve good results with differences in the rate of over/under-shoot or convergence rate of the cost function, in the desired time domain.
In residential house, photovoltaic (PV) system among various alternatives in renewable energy system is the most efficient and feasible solution for reducing energy consumption and electricity cost. However, relatively high initial cost make people reluctant to install PV system in their houses. Therefore, in the initial state for PV system installation in the house, it is very important to decide proper capacity of the PV system considering the expected energy usage and solar energy supplying condition with the house. This paper proposes a novel optimization model for deciding appropriate capacity of the PV system for residential house. The objective function of the model is to minimize the annual cost including electricity bill, operation and maintenance cost, and annual fixed cost calculated from the initial installation cost based on capital recovery factor (CRF). The model also shows the optimal inclining angle of PV panels of the system. In this paper, we estimate the PV output using PVWATTS (PV simulator of Office of Energy Efficiency and Renewable Energy) and find optimal solutions by Sequential Quadratic Programming (SQP) method using MATLAB software. The proposed approach is finally applied to a residential model house in Gangneung, Gangwon-Do and verified its feasibility for adopting to PV system design for residential houses.
최근 들어 교량과 같은 구조물에 대한 생애주기비용(Life Cycle Cost, LCC) 분석의 중요성이 점차 커지고 있다. 그러나 교량의 공용수명 동안 발생할 수 있는 생애주기비용은 설계 및 시공조건 그리고 사용환경에 따라 많은 불확실성을 내포하고 있기 때문에 정확히 예측하기 힘들다. 본 논문에서는 교량의 생애주기비용 최적설계를 위한 설계방법을 제시하였다. 교량의 총생애주기비용은 초기비용, 손상비용 유지관리비용, 보수/보강비용, 사용자비용, 해제/폐기비용의 합으로 산정하였다. 생애주기비용을 목적함수로 하고 도로교설계기준을 제약조건으로 최적화를 수행하였다. 초기비용은 종합불가정보 및 참고자료를 근거로 산출하였으며, 하중 및 부재에 대한 불확실성을 고려하기 위해 손상확률의 개념을 도입하여 손상비용을 산출하였다. 교량의 내하율곡선을 이용하여 교량의 보수/보강 비용을 추정하였으며, 차량운행비용과 시간지연비용으로부터 사용자비용을 산정하였다. 이로부터 교량에 대한 생애주기비용 최적설계를 수행하고 주요인자들에 대한 영향을 살펴보았다.
공동주택의 건설 분쟁(Claim)발생 시 지속적으로 발생하는 하자의 보수비용 산정 방안에 대한 객관적 기준이 없어 건설전문가들도 각자의 경험과 성향에 따라 다양하게 판단하게 되므로 문제점을 발생 시키고 있다. 따라서 본 연구에서는 이에 대한 분석을 통하여 보수비용 산정기준과 방안을 제시한 후 건축물 하자관련 담당자들에게 합리적인 하자 판단기준을 제안 하고자 한다. 연구결과, 실적공사비를 우선 적용하며 실적공사비에 없는 항목은 표준품셈을 활용하여 산정한다. 지속형 하자 유형인 법규위반 하자의 보수비용 산정은 위반 건물부위만 철거하여 재시공하는 비용을 산정하고, 진행성(확대)하자는 건물 준공의 경과연수에 비례하여 기여율로 산정하며, 반복성 하자는 하자를 최소화시키는 방법의 설비공법을 대안으로 강구하여 산정하고, 가치감소 하자는 내용연수대비 하자보증기간의 비율로 산정하는 방법을 제안하였다. 이중 가치감소하자 보수비용의 산정은 향후 보다 많은 연구가 필요할 것으로 사료된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.