• 제목/요약/키워드: objective cost function

검색결과 464건 처리시간 0.022초

CBP 시장 체제하에서의 전력수급계획 수립 체계에 관한 연구 (A Study on the Generation Expansion Planning System Under the Cost Based Pool)

  • 한석만;김발호
    • 전기학회논문지
    • /
    • 제58권5호
    • /
    • pp.918-922
    • /
    • 2009
  • The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning cannot use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning process in the power markets. This system is composed of Regulator and GENCO's model. Regulator model used multi-criteria decision making rule. GENCO model is very complex problem. Thus, this system transacted the part by several scenario assuming GENCO model.

주파수 수요와 주파수 재할당 비용을 고려한 무선통신 네트워크 재설계 (Redesigning Radio Networks Considering Frequency Demands and Frequency Reassignment Cost)

  • 한정희
    • 한국IT서비스학회지
    • /
    • 제10권1호
    • /
    • pp.117-133
    • /
    • 2011
  • In this paper, we present a frequency reassignment problem (FRP) arising from the reconfiguration of radio networks such as adding new base stations (BSs) and changing the number of frequencies assigned to BSs. For this problem, we develop an integer programming (IP) model that minimizes the sum of frequency reassignment cost and the cost for unsatisfied frequency demands, while avoiding interference among frequencies. To obtain tight lower bounds, we develop some valid inequalities and devise an objective function relaxation scheme. Also, we develop a simple but efficient heuristic procedure to solve large size problems. Computational results show that the developed valid inequalities are effective for improving lower bounds. Also, the proposed tabu search heuristic finds tight upper bounds with average optimality gap of 2.3%.

비상상태 전압제어를 위한 무효전력보상설비의 최적 운용 (Optimal Operation of Reactive Power Compensation Devices for Voltage Control of Emegency Status)

  • 안창한;백영식
    • 전기학회논문지
    • /
    • 제64권5호
    • /
    • pp.661-666
    • /
    • 2015
  • This paper proposes a method for solving running cost problem by minimizing switching reactive power compensation devices. An objective function was modeled by calculating the weighting value of cost, and a solution was derived using ILP. This paper suggests optimal coordinative control method between FACTS, Shunt Reactors, Capacitors and OLTC. Therefore, it is valuable for decision maker in determining order and capacity of devices which gaining a voltage stabilization. As a result, the objectives of voltage stabilization and cost minimization were achieved simultaneously. This realizes the economic efficiency of the system. We start by showing how to solve systems of linear equations using the language of pivots and tableaus. The effectiveness of this technique is demonstrated in modified PSS/E MIGUM 45 bus system. The simulation results show the effectiveness of this algorithm by comparing the outcome withseveral established methods.

Optimum design of a reinforced concrete beam using artificial bee colony algorithm

  • Ozturk, H.T.;Durmus, Ay.;Durmus, Ah.
    • Computers and Concrete
    • /
    • 제10권3호
    • /
    • pp.295-306
    • /
    • 2012
  • Optimum cost design of a simply supported reinforced concrete beam is presented in this paper. In the formulation of the optimum design problem, the height and width of the beam, and reinforcement steel area are treated as design variables. The design constraints are implemented according to ACI 318-08 and studies in the literature. The objective function is taken as the cost of unit length of the beam consisting the cost of concrete, steel and shuttering. The solution of the design problem is obtained using the artificial bee colony algorithm which is one of the recent additions to metaheuristic techniques. The artificial bee colony algorithm is imitated the foraging behaviors of bee swarms. In application of this algorithm to the constraint problem, Deb's constraint handling method is used. Obtained results showed that the optimum value of numerical example is nearly same with the existing values in the literature.

STUDY ON LCC ANALYSIS OF BUILDING ACCORDING TO STRUCTURES - FOCUSING ON MILITARY ESTABLISHMENTS -

  • Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1187-1192
    • /
    • 2005
  • Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.

  • PDF

프리스트레스트 콘크리트 박스 거더 교량의 최적설계에 관한 연구 (A Study on the Optimal Design of Prestressed Concrete Box Girder Bridges)

  • 노금래;윤희택;박선규
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제4권2호
    • /
    • pp.139-149
    • /
    • 2000
  • In the preliminary design stage of prestressed concrete (PSC) box girder bridges, the design factors decided by inexperience designer could heavily affect to the results of final design. There is a possibility that the design ends up with an excessively wasteful design. To achieve an economical design with preventing an excessive design, the optimal design technique has been developed using ADS optimal program and SPCFRAME in this study. The objective function for the optimal design problem is the material cost of box girders and constrained functions are constituted with design specifications and workability. The Sequential Unconstraint Minimization Technique (SUMT) is used for the optimal design in this study. We designed an uniform cross-section bridge and an ununiform cross-section bridge in the same design condition by optimal design technique developed in this study. Analyzing the results obtained for various tendon layouts, we suggest a standard tendon layout which gives the most effective structural behavior.

  • PDF

Control of a pressurized light-water nuclear reactor two-point kinetics model with the performance index-oriented PSO

  • Mousakazemi, Seyed Mohammad Hossein
    • Nuclear Engineering and Technology
    • /
    • 제53권8호
    • /
    • pp.2556-2563
    • /
    • 2021
  • Metaheuristic algorithms can work well in solving or optimizing problems, especially those that require approximation or do not have a good analytical solution. Particle swarm optimization (PSO) is one of these algorithms. The response quality of these algorithms depends on the objective function and its regulated parameters. The nonlinear nature of the pressurized light-water nuclear reactor (PWR) dynamics is a significant target for PSO. The two-point kinetics model of this type of reactor is used because of fission products properties. The proportional-integral-derivative (PID) controller is intended to control the power level of the PWR at a short-time transient. The absolute error (IAE), integral of square error (ISE), integral of time-absolute error (ITAE), and integral of time-square error (ITSE) objective functions have been used as performance indexes to tune the PID gains with PSO. The optimization results with each of them are evaluated with the number of function evaluations (NFE). All performance indexes achieve good results with differences in the rate of over/under-shoot or convergence rate of the cost function, in the desired time domain.

주택용 태양광발전시스템의 적정 용량 및 설치각 선정을 위한 최적화 모델 연구 (An Optimal Decision Model for Capacity and Inclining Angle of Residential Photovoltaic Systems)

  • 전정표;김광호
    • 전기학회논문지
    • /
    • 제59권6호
    • /
    • pp.1046-1052
    • /
    • 2010
  • In residential house, photovoltaic (PV) system among various alternatives in renewable energy system is the most efficient and feasible solution for reducing energy consumption and electricity cost. However, relatively high initial cost make people reluctant to install PV system in their houses. Therefore, in the initial state for PV system installation in the house, it is very important to decide proper capacity of the PV system considering the expected energy usage and solar energy supplying condition with the house. This paper proposes a novel optimization model for deciding appropriate capacity of the PV system for residential house. The objective function of the model is to minimize the annual cost including electricity bill, operation and maintenance cost, and annual fixed cost calculated from the initial installation cost based on capital recovery factor (CRF). The model also shows the optimal inclining angle of PV panels of the system. In this paper, we estimate the PV output using PVWATTS (PV simulator of Office of Energy Efficiency and Renewable Energy) and find optimal solutions by Sequential Quadratic Programming (SQP) method using MATLAB software. The proposed approach is finally applied to a residential model house in Gangneung, Gangwon-Do and verified its feasibility for adopting to PV system design for residential houses.

교량의 생애주기비용 최적설계 (Optimal Life Cycle Cost Design of a Bridge)

  • 박장호;신영석
    • 한국안전학회지
    • /
    • 제25권6호
    • /
    • pp.115-122
    • /
    • 2010
  • 최근 들어 교량과 같은 구조물에 대한 생애주기비용(Life Cycle Cost, LCC) 분석의 중요성이 점차 커지고 있다. 그러나 교량의 공용수명 동안 발생할 수 있는 생애주기비용은 설계 및 시공조건 그리고 사용환경에 따라 많은 불확실성을 내포하고 있기 때문에 정확히 예측하기 힘들다. 본 논문에서는 교량의 생애주기비용 최적설계를 위한 설계방법을 제시하였다. 교량의 총생애주기비용은 초기비용, 손상비용 유지관리비용, 보수/보강비용, 사용자비용, 해제/폐기비용의 합으로 산정하였다. 생애주기비용을 목적함수로 하고 도로교설계기준을 제약조건으로 최적화를 수행하였다. 초기비용은 종합불가정보 및 참고자료를 근거로 산출하였으며, 하중 및 부재에 대한 불확실성을 고려하기 위해 손상확률의 개념을 도입하여 손상비용을 산출하였다. 교량의 내하율곡선을 이용하여 교량의 보수/보강 비용을 추정하였으며, 차량운행비용과 시간지연비용으로부터 사용자비용을 산정하였다. 이로부터 교량에 대한 생애주기비용 최적설계를 수행하고 주요인자들에 대한 영향을 살펴보았다.

A Proposal of Repair Cost Estimating Criteria for Persistent Defects in Apartment Houses

  • Lee, Hae-Jin;Lim, Nam-Gi
    • 한국건축시공학회지
    • /
    • 제11권6호
    • /
    • pp.597-608
    • /
    • 2011
  • 공동주택의 건설 분쟁(Claim)발생 시 지속적으로 발생하는 하자의 보수비용 산정 방안에 대한 객관적 기준이 없어 건설전문가들도 각자의 경험과 성향에 따라 다양하게 판단하게 되므로 문제점을 발생 시키고 있다. 따라서 본 연구에서는 이에 대한 분석을 통하여 보수비용 산정기준과 방안을 제시한 후 건축물 하자관련 담당자들에게 합리적인 하자 판단기준을 제안 하고자 한다. 연구결과, 실적공사비를 우선 적용하며 실적공사비에 없는 항목은 표준품셈을 활용하여 산정한다. 지속형 하자 유형인 법규위반 하자의 보수비용 산정은 위반 건물부위만 철거하여 재시공하는 비용을 산정하고, 진행성(확대)하자는 건물 준공의 경과연수에 비례하여 기여율로 산정하며, 반복성 하자는 하자를 최소화시키는 방법의 설비공법을 대안으로 강구하여 산정하고, 가치감소 하자는 내용연수대비 하자보증기간의 비율로 산정하는 방법을 제안하였다. 이중 가치감소하자 보수비용의 산정은 향후 보다 많은 연구가 필요할 것으로 사료된다.