The 1th International Conference on Construction Engineering and Project Management
/
pp.1112-1117
/
2005
Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.
Journal of information and communication convergence engineering
/
제9권5호
/
pp.491-499
/
2011
In this paper, we offer a new strategic portfolio model for national IT R&D project selection in Korea. A risk and return (R-R) portfolio model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R portfolio model to solve the non-strategy and subjectivity problems of the existing national R&D project selection model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technical level reports (TLR) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic portfolio project and balancing the allocation of resources effectively and objectively.
Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.
부산항 신항은 항만의 대형화 및 하역장비의 현대화와 상해, 싱가포르 등 경쟁항만과의 중심항만 선점 필요성 등 세계해운항만 여건 변화에 대응하기 위해 물류중심항만(Hub Port)으로 건설을 목표로 추진되고 있다. 현재 북컨테이너 부두 및 남컨테이너 부두 등 23선석 운영 중에 있으며, 장래 서컨테이너 부두, 남컨테이너 부두 등에 2020년까지 45선석 규모로 확장될 계획이다. 또한 기 준공된 북컨 외에 웅동지구 1,2단계, 서컨 1,2단계, 남컨 항만배후부지 등 항만배후단지 개발이 동시에 추진되고 있다. 따라서 이러한 개발계획을 반영한 장래 교통수요를 예측하여 부산 신항의 교통체계의 문제점을 도출하였다. 부산항 신항의 교통체계 문제점은 부산항 신항 제2배후도로와 연계되는 남북축 도로의 주요교차로의 교통혼잡이 발생하고, 장래 증가될 교통량 대비 신항로(북컨 임항도로)의 용량이 부족할 것으로 예상되었다. 또한 부산항 신항 제1진입도로와 국도2호선이 직접 연결되지 않아 신항북로 등으로 우회교통량이 발생하는 문제점이 있는 것으로 파악되었다. 이에 본 연구에서는 부산항 신항의 원활한 교통처리를 위한 3가지 교통체계 개선방안을 제시하였다. 첫째, 첫째, 부산 신항 제2배후도로와 연계되는 서"컨"남북간 교통축에 대한 주요교차로 운영 및 부교차로의 우회전 진입,진출만 허용하는 방안, 둘째, 존 보도 및 중앙분리대 공간을 활용한 신항로(북"컨"임항도로) 차로 확장방안, 셋째, 부산항 신항 제1진입도로에서 지방도 1042호선 직결 진출입램프 설치하여 국도2호선 방면 연계방안이다. 이러한 개선방안의 효과를 측정하기 위해 Micro Simulation Package인 Vissim을 사용하여 분석하였다.
도시개발에 있어 도로의 건설은 교통의 목적 외에 전기, 가스, 통신, 난방, 하수, 상수, 오수 등의 도시 편의시설을 위한 공간으로도 활용되고 있다. 하지만 현재 도로 시공과정에서 각 기능에 따른 관련 주체들이 진행되는 공사수행일정에 대한 의사소통이 충분히 이루어지지 않아 재굴착 작업이 빈번히 이루어지고 있으며 이로 인해 예산의 중복투입, 공사기간 지연, 품질저하, 이용자의 불편 등 여러 가지 문제점들이 나타나고 있다. 본 연구에서는 신도시 개발과 같은 대규모의 프로젝트에서 도로 재굴착으로 인한 문제를 사전에 예방하기 위해 시간과 공간데이터를 활용한 재굴착 방지 프로세스 모델을 개발하였으며, 이를 활용하여 도시기반시설 건설주체간 원활한 협의를 돕기 위한 재굴착방지시스템을 개발하였다. 아울러, 개발된 시스템을 개발중인 신도시 건설사업에 활용하여 그 적용성을 검토하였다.
To mitigate the development gap between urban and rural area, the government has implemented project planning as the Rural Integrated Development in each Gun level since 1986. On account of shortage of the development fund, the government had changed the Gun level development into Myeon level development so called the Rural Central Settlement Zone Development. The government had started nine pilot projects throughout Korea from 1990. This study is aimed at identifing problems that found in the course of implementation of the projects and recommending the new direction of the successful implementation of the projects in the future. The problems and directions found in the cource of project implementation were as follows: 1. Project implementation by investment priority considering economic and financial rate of return should be made. 2. Objective project planning should be made. 3. Equal allocation of the limited investment fund by group interest and egoism should be prohibited. 4. Enforcement of special man power should be taken into account. 5. Unification of the diversified existing terms and conditions of loans for house construction and improvement. 6. Road development oriented budget allocation should be improved. 7. Sufficient development fund should be procured considering the present rate of sufficiency of the project cost as 36%. 8. Sufficient supply of the credit loans for improvement of living environment of the farmers should be realized. 9. Rational implementation planning in connection with farm household income source development should be made.
The 8th International Conference on Construction Engineering and Project Management
/
pp.433-439
/
2020
As eco-friendly and sustainable architecture is becoming more popular, the interest in Korean traditional wooden buildings (Hanok) has also been increasing. The building technologies of the wooden construction have been actively developed in all over the world through the diversification of new materials and construction methods. On the other hand, the growth rate of wooden construction market is still slow in Korea. In an attempt to promote the Korean traditional wooden buildings, a comprehensive research project has been conducted. This R&D project is developing standard designs, new materials, and methods for modernized Hanok including houses, public buildings, long-span structures, and even high-rise buildings. To this end, the purpose of this study is to formulate a technological strategy for popularization of modernized Hanok. Influencing variables and issues are analyzed and defined first. At the same time, the five keywords have examined in the perspective of dissemination of modernized Hanok technology. Finally, a technology road map for strategic development of modernized Hanok is proposed through casual diagrams.
The purpose of this study was to analyze the conflicts in fishing villages, focusing on the Fishing Village New Deal 300 Project. In order to solve the research problem, the case analysis method was selected among qualitative research methods. Interviewees were selected as the village leaders and the MP(master planner) at the center of the project contest and promotion process. Of the leaders who were in charge of the project or in the villages selected for the project, three leaders who fully understood the purpose of this study were selected. The categorized results are as follows: First, difficulties in forming regional councils due to indifference of residents. Second, demanding excessive sacrifice of the leader. Third, the leader and the residents distrust of the local government. Fourth, the non-cooperation and intentional interference of the residents. Preventing and managing these conflicts is as follows: First, the regional arrangement of experts at the national level. Second, education for improving residents awareness. Third, structuralization of pre-learning and refueling systems. Forth, participation of residents in the decision-making process, Fifth, development and application of a practical road-map.
본 연구에서는 효율적인 도로 유지관리를 위한 적극적인 민간의 참여방안을 위해 도로시설 개량사업 추진현황 및 현 추진 중인 민간자본 활용 개량사업의 개선사항을 검토하고, 이를 바탕으로 새로운 사업방식이 적용된 사례조사, 재무적 타당성 분석 업무 등을 수행하여 적용 가능한 사업방식을 선정하였다. 분석 결과, 현 추진 중인 민간자본 활용 개량사업의 민간방식보다 크라우드 펀딩을 활용한 방식이 비용측면에서 가장 유리한 것으로 분석되었으며, 고속도로 이용자, 특히 개량공사 구간 이용자로부터 자금을 조달 한다는 점에서 활용효과가 높을 것으로 판단된다. 또한 공사로 인해 불편을 겪는 도로이용객에게 도로공사가 얻는 통행료 이익을 사용자에게 환원한다는 의미도 부여할 수 있다.
The Seoul-Metro is the first city railroad corporation to operate RIMS(Rolling-stock Information Maintenance System). The development of "RIMS Project" and trial running task were started from Mar 29, 2001. Finally, this project was completed successfully on Dec 31, 2005, as integrated systems including light or heavy maintenance works in Ji-Chuk and Chang-Dong Rolling-stock Offices. After that, from 2006 to Dec 31, 2007, we promoted a this new program to other four rolling-stock offices (Su-Seo, Gun-Ja, Sin-Jeong) and the headquarter. For the duration of trial running, we developed and applied new complementary program having made up for the weak points or defects. The series of new program which were newly developed and applied are comprised of an operation management, trouble management, wheel management, heavy maintenance table automatic creation programs and ordering prediction programs to purchase goods smoothly. The Seoul-Metro have registered these programs(RIMS) to Computer Program Protection Committee. We'd like to introduce a composition of program for enhancement of a city railroad Information Systems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.