• Title/Summary/Keyword: nearby excavation

Search Result 68, Processing Time 0.018 seconds

Comparison of Nail Tensile Force by Feed Back Analysis rind Measurements (현장계측과 역해석에 의한 네일의 인장력 비교 연구)

  • Jeon, Seong-Kon
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.3
    • /
    • pp.33-41
    • /
    • 2002
  • Soil nailing type of retaining structures has been widely used in Korea far the purpose of the temporary and permanent support in excavations and slope stability. The important factors in application of soil nailing systems in urban excavation site nearby the existing structures are the displacement of the wall and tensile farce of the nails, etc. In this paper, the fled back analyses are carried out at 11 excavation sites to investigate the behavior of tensile farce of nails at stepwise excavation in the multi-layered strata including various rock layers. The results of the fled back analysis are less than about 50% of the measured ones. The distance of active zone by measurements are shown almost larger than that of fled back analysis when the distance of active Bone is defined from the surface of wall to the potential failure surface. And the results of fled back analysis are within the range proposed by the project CLOUTERRE and Cartier & Gigan (1983) which were 0.3$H_f$, and 0.5$H_f$, of the final excavation depth ($H_f$,) respectively, but the values of the measurement were larger than these values.

A Case Study of Deep Shaft Blasting for Reducing Ground Vibration in Urban Area (도심지의 대심도 수직구 발파에서 지반진동저감 시공 사례)

  • Hwang, Nam-Sun;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Jung, Min-Sung;Lee, Hyeung-Jin;Na, Gyeong-Min
    • Explosives and Blasting
    • /
    • v.39 no.2
    • /
    • pp.15-26
    • /
    • 2021
  • Domestic electronic detonators are used widely in many quarry and construction sites since its launch at 2013. In the case of SOC projects conducted in the city, most of them are designed in high-depth to reduce complaints. The high-depth excavation needs a long construction period and huge cost for building shaft and ventilation hole. Mechanical excavation method is applied when safety things are located nearby the site. Solidity of rock and machine's performance affect on the method's efficiency. So as the efficiency is getting lower, the construction period is extended, and the cost is increases as well. This case study is about changing the machine excavation method to the blasting method which is electronic detonator applied at the shaft construction site in the city. This is an example of using electronic detonators on the construction site in reducing blast-noise and vibration while meeting environmental regulatory standards.

Investigations of countermeasures used to mitigate tunnel deformations due to adjacent basement excavation in soft clays

  • Jinhuo Zheng;Minglong Shen;Shifang Tu;Zhibo Chen;Xiaodong Ni
    • Geomechanics and Engineering
    • /
    • v.36 no.6
    • /
    • pp.563-573
    • /
    • 2024
  • In this study, various countermeasures used to mitigate tunnel deformations due to nearby multi-propped basement excavation in soft clay are explored by three-dimensional numerical analyses. Field measurements are used to calibrate the numerical model and model parameters. Since concrete slabs can constrain soil and retaining wall movements, tunnel movements reach the maximum value when soils are excavated to the formation level of basement. Deformation shapes of an existing tunnel due to adjacent basement excavation are greatly affected by relative position between tunnel and basement. When the tunnel is located above or far below the formation level of basement, it elongates downward-toward or upward-toward the basement, respectively. It is found that tunnel movements concentrate in a triangular zone with a width of 2 He (i.e., final excavation depth) and a depth of 1 D (i.e., tunnel diameter) above or 1 D below the formation level of basement. By increasing retaining wall thickness from 0.4 m to 0.9 m, tunnel movements decrease by up to 56.7%. Moreover, tunnel movements are reduced by up to 80.7% and 61.3%, respectively, when the entire depth and width of soil within basement are reinforced. Installation of isolation wall can greatly reduce tunnel movements due to adjacent basement excavation, especially for tunnel with a shallow burial depth. The effectiveness of isolation wall to reduce tunnel movement is negligible unless the wall reaches the level of tunnel invert.

Object Detection From 3D Terrain Data Gener Ated by Laser Scanner of Intelligent Excavating System(IES) (굴삭 자동화를 위한 레이저 스캐너 기반의 3차원 객체 탐지 알고리즘의 개발)

  • Yoo, Hyun-Seok;Park, Ji-Woon;Choi, Youn-Nyung;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.130-141
    • /
    • 2011
  • The intelligent excavating system(IES), the development in South Korea of which has been underway since 2006, aims for the full-scale automation of the excavation process that includes a series of tasks such as movement, excavation and loading. The core elements to ensure the quality and safety of the automated excavation equipment include 3D modeling of terrain that surrounds the excavating robot and the technology for detecting objects accurately(i.e., for detecting the location of nearby loading trucks and humans as well as of obstacles positioned on the movement paths). Therefore the purpose of this research is to ensure the quality and safety of automated excavation detecting the objects surrounding the excavating robot via a 3D laser scanning system. In this paper, an algorithm for estimating the location, height, width, and shape of objects in the 3D-realized terrain that surrounds the location of the excavator was proposed. The performance of the algorithm was verified via tests in an actual earthwork field.

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

A Study on Tunnel Excavation by Controlled Blast Vibration at Particular Environment Conditions (발파진동 제어에 의한 특수구간 터널굴착에 관한 연구)

  • Choi, Hyung-Bin;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.20 no.A
    • /
    • pp.257-267
    • /
    • 2000
  • It was difficult to apply conventional excavation methods in some sections from Seoul to Pusan high speed rail road construction of 1 lot 2, due to highway concrete road, gas pipe, water pipe and nearby factories with automatic control system machine. To excavate safely and efficiently in these sections new blast patterns were employed within allowable blast vibration level, by test blast and controlled vibration by sequential blast. Behaviors of the rock mass including convergence and displacement around tunnel were measured with construction works and the crack width in concrete wall was also monitored for controlling allowable limits. The results can be summarized as follow : 1. The allowable blast vibration level in structure site is less 1.0cm/sec for highway concrete, 0.5 cm/sec for gas pipe, water pipe and building housing and 0.3 cm/sec for automatic control system machine. 2. The convergence displacement, single rod extensometer and multi rod extensometer around tunnel and cracks in concrete wall were measured, it was confirmed that the measured values were converged within allowable level. 3. The empirical formular of ground vibrations with 90% confidence lines for PD-3 was given as follow. $$V_{90%}=45.549({\frac{D}{\sqrt{W}}})^{-1.353}$$

  • PDF

Determination of effective parameters on surface settlement during shield TBM

  • Kim, Dongku;Pham, Khanh;Park, Sangyeong;Oh, Ju-Young;Choi, Hangseok
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.153-164
    • /
    • 2020
  • Tunnel excavation in shallow soft ground conditions of urban areas experiences inevitable surface settlements that threaten the stability of nearby infrastructures. Surface settlements during shield TBM tunneling are related to a number of factors including geotechnical conditions, tunnel geometry and excavation methods. In this paper, a database collected from a construction section of Hong Kong subway was used to analyze the correlation of settlement-inducing factors and surface settlements monitored at different locations of a transverse trough. The Pearson correlation analysis result revealed a correlation between the factors in consideration. Factors such as the face pressure, advance speed, thrust force, cutter torque, twin tunnel distance and ground water level presented a modest correlation with the surface settlement, while no significant trends between the other factors and the surface settlements were observed. It can be concluded that an integrated effect of the settlement-inducing factors should be related to the magnitude of surface settlements.

Evaluation of Groundwater Level Decline and Water Quality Due to Tunnel Excavation (터널굴착으로 인한 지하수위 저하 및 수질영향 평가)

  • Kim, Min Gyu;Kim, Minsoo;Jeong, Gyocheol;Lee, Jeongwoo;Chung, Il-Moon
    • The Journal of Engineering Geology
    • /
    • v.29 no.2
    • /
    • pp.113-122
    • /
    • 2019
  • In this study, the flow analysis to evaluate the extent of groundwater decline and the effect of the small valleys caused by the decrease of groundwater level in the construction of road tunnel, and the pollutant movement analysis to evaluate pollution of nearby water source by pollutant discharge during tunnel construction, respectively. The decrease of the groundwater during the 30 month tunnel excavation period was maximum 27 m and it was found to be the largest within 50 m from the tunnel center. The flow of groundwater is shown in the form of flowing into the tunnels and the effects of groundwater level decline were observed up to a tunnel radius of 200 m. As a result of the numerical modeling of the contaminant transport to examine the influence of the polluted water discharge from the tunnel, the range of the turbid water generated at the end of the tunnel is up to 120 m and it is estimated that the risk of contamination of the small river is not large.

Field Measurements of Ground Movements Around Tunnel (현장계측에 의한 터널주변지반의 변위연구)

  • 홍성완;배규진
    • Geotechnical Engineering
    • /
    • v.1 no.2
    • /
    • pp.41-54
    • /
    • 1985
  • Generally, ground settlements and lateral displacements are accompanied by underground excavation associated with open-cut or tunnling. These ground movements cause a harmful influence upon nearby super.structures and sub-structures. Occasionally, the ground movements may pose serious problems as the function of the nearby structures may be disrupted. Therefore, prior to the subway construction in an urban area, it is necessary to identify the causes of ground settlements and estimating the extent St the magnitude of ground movements since any potential damage to the nearby structures such as gas lines, water mains, high buildings and cultural assets must be assessed. The research was performed mainly on ground movements such as surface settlements, lateral displacements, subsurface settlements and crown settlements to predict the maximum settlement and settlement zone, and to identify the causes of ground settlements in NATM sections of Busan subway. As a result, it was found that lateral distribution of settlements could be approximated reasonably by a Gaussian normal probability curve and longitudinal distribution of settlements by a cumulative Gaussian probability curve, and that the early closure of temporary invert was very important to minimize ground settlements.

  • PDF

Experimental study on the behavior of retaining wall according to underground excavation distance (지하굴착 이격거리에 따른 흙막이벽체 거동에 대한 실험적 연구)

  • Park, Jong-Deok;Ahn, Chang-Kyun;Kim, Do-Youp;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.2
    • /
    • pp.155-164
    • /
    • 2016
  • The changes in earth pressure and ground settlement due to the underground excavation nearby the existing retaining wall according to the separation distance between underground excavation and retaining wall, were studied experimentally. A soil tank having 160 cm in length and 120 cm in height, was manufactured to simulate the underground excavation like tunnel by using 5 separated bottom walls. The variation of earth pressure was measured according to the excavation stages by using 10 separated right walls simulating the retaining wall. The results showed that the earth pressure was changed by the lowering of first bottom wall(B1), however the earth pressure was not changed significantly by the lowering of third bottom wall(B3) since B3 had sufficient separation distance from retaining wall. Lowering of first bottom wall(B1) induced the decrease of earth pressure in lower part of retaining wall, on the contrary, lowering of first bottom wall(B1) induced the increase of earth pressure in middle part of retaining wall proving the arching effect.