• Title/Summary/Keyword: natural gas pre-treatment process

Search Result 3, Processing Time 0.017 seconds

Energy System Analysis of LNG-FPSO Pre-Ttreatment Processes by Heat Integration Technique (LNG-FPSO 전처리 공정 에너지 시스템 분석)

  • Cho, Ha-bin;Kim, Jin-Kuk;Min, Kwang-Jun;Lim, Dong-Ha
    • Plant Journal
    • /
    • v.8 no.4
    • /
    • pp.40-44
    • /
    • 2012
  • The pre-treatment of natural gas to remove $H_2S$ and $CO_2$ before liquefaction in natural gas processing is required, and amine-based absorption processes are widely used in gas processing. The current study aims to model amine-based absorption process and to find cost-effective design through systematic analysis of energy systems, together with column design. Different design options for absorber and stripper are investigated in a holistic manner, and heat integration technique has been applied to investigate how design of columns is interacted with energy efficiency for the pre-treatment process considered. Case study has been presented to demonstrate the applicability of heat integration method for improving energy efficiency in practice.

  • PDF

Vibration Reduction of Vertical Pumps Used in the Power Plant Circulating Water System (발전소 순환수계통 수직펌프의 진동저감에 관한 연구)

  • Park, Hyeok;Yoo, Ho-Seon
    • Plant Journal
    • /
    • v.9 no.1
    • /
    • pp.43-49
    • /
    • 2013
  • In this study, the natural frequency of the actual operating vertical pump in the P combined cycle power plant is measured and the cause of high vibration is determined by using fluid-structure coupled vibration theory. Choosing the vibration reduction plan suited for field conditions and using the numerical analysis verify effectiveness of the plan. The plan is applied to the actual pump and the empirical experiments are conducted.

  • PDF

Simulation of Membrane-absorption Hybrid Process for LNG-FPSO (LNG-FPSO용 막-흡수 하이브리드 공정 전산모사)

  • Min, Kwang-Joon;Cho, Habin;Kim, Jin-Kuk;Kang, Sang Wook
    • Membrane Journal
    • /
    • v.28 no.2
    • /
    • pp.90-95
    • /
    • 2018
  • A process design was performed for a removal of acid gases using membrane-absorption hybrid system in LNG-FPSO. Commercial process simulator Promax version 4.0 was utilized for comparing acid gases removal capabilities of amine absorption process and hybrid process. Simulation results show hybrid process could be small amine solvent circulate rate, energy consumption, equipment sizing compared to typical amine absorption process. As a result, hybrid process which is small footprint and energy saving process may be a good solution for the pre-treatment of natural gas in LNG-FPSO.