• Title/Summary/Keyword: national project

Search Result 5,332, Processing Time 0.041 seconds

A Study for the Development of Writing National Standard Specifications, Owner′s Standard Specifications and Project Specifications (표준$\cdot$전문$\cdot$공사시방서의 작성방법 개선방안에 관한 연구)

  • Koo Jai Dong;Kim Tae Song
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.81-88
    • /
    • 2000
  • Recently the Government has classified the construction specifications into three types such as national standard specifications, owner's standard specifications and project specifications, by the revision of the Law of Construction Technology Management. And the Government provided that project owner shall use the project specifications that are written by excerption from, revision of, and supplement to the national standard specifications or the owner's standard specitications etc.. The present study suggests the writing way of national standard specifications, owner's standard specifications and project specifications in these situations.

  • PDF

Application of Project Management on Pyro Project (파이로 프로젝트에 프로젝트 관리 적용 방안)

  • Kim, Jeong-Guk;Kim, Hyuck-Jong;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

Temporal Transcriptome Analysis of SARS-CoV-2-Infected Lung and Spleen in Human ACE2-Transgenic Mice

  • Jung Ah, Kim;Sung-Hee, Kim;Jung Seon, Seo;Hyuna, Noh;Haengdueng, Jeong;Jiseon, Kim;Donghun, Jeon;Jeong Jin, Kim;Dain, On;Suhyeon, Yoon;Sang Gyu, Lee;Youn Woo, Lee;Hui Jeong, Jang;In Ho, Park;Jooyeon, Oh;Sang-Hyuk, Seok;Yu Jin, Lee;Seung-Min, Hong;Se-Hee, An;Joon-Yong, Bae;Jung-ah, Choi;Seo Yeon, Kim;Young Been, Kim;Ji-Yeon, Hwang;Hyo-Jung, Lee;Hong Bin, Kim;Dae Gwin, Jeong;Daesub, Song;Manki, Song;Man-Seong, Park;Kang-Seuk, Choi;Jun Won, Park;Jun-Won, Yun;Jeon-Soo, Shin;Ho-Young, Lee;Jun-Young, Seo;Ki Taek, Nam;Heon Yung, Gee;Je Kyung, Seong
    • Molecules and Cells
    • /
    • v.45 no.12
    • /
    • pp.896-910
    • /
    • 2022
  • Severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2) is a highly transmissible and potentially fatal virus. So far, most comprehensive analyses encompassing clinical and transcriptional manifestation have concentrated on the lungs. Here, we confirmed evident signs of viral infection in the lungs and spleen of SARS-CoV-2-infected K18-hACE2 mice, which replicate the phenotype and infection symptoms in hospitalized humans. Seven days post viral detection in organs, infected mice showed decreased vital signs, leading to death. Bronchopneumonia due to infiltration of leukocytes in the lungs and reduction in the spleen lymphocyte region were observed. Transcriptome profiling implicated the meticulous regulation of distress and recovery from cytokine-mediated immunity by distinct immune cell types in a time-dependent manner. In lungs, the chemokine-driven response to viral invasion was highly elevated at 2 days post infection (dpi). In late infection, diseased lungs, post the innate immune process, showed recovery signs. The spleen established an even more immediate line of defense than the lungs, and the cytokine expression profile dropped at 7 dpi. At 5 dpi, spleen samples diverged into two distinct groups with different transcriptome profile and pathophysiology. Inhibition of consecutive host cell viral entry and massive immunoglobulin production and proteolysis inhibition seemed that one group endeavored to survive, while the other group struggled with developmental regeneration against consistent viral intrusion through the replication cycle. Our results may contribute to improved understanding of the longitudinal response to viral infection and development of potential therapeutics for hospitalized patients affected by SARS-CoV-2.

A Study on Maintenance Actual Condition and Revitalization of Rural Development Project (일반농산어촌개발사업 완료지구 시설물 실태분석 및 활성화 방안 연구)

  • Choi, Young-Wan;Kim, Keun-Ho;Eun, Hee-Chang;Lee, Young-Kyu;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.1-8
    • /
    • 2016
  • This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.

Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan

  • Musarat, M. Ali;Ahad, M. Zeeshan
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.1-6
    • /
    • 2016
  • Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.

Eco-car Manufacturing Activities as Engineering Design Education Subject in Suzuka National College of Technology

  • Mori, Kunihiko;Sakamoto, Hidetoshi;Ohbuchi, Yoshifumi
    • Journal of Engineering Education Research
    • /
    • v.15 no.5
    • /
    • pp.25-30
    • /
    • 2012
  • "The engineering education program for environmental intention and value creation" has been executed from 2008 to 2010 in Suzuka National College of Technology, which program was promoted as "Good Practice for Education" by Ministry of Education, Culture, Sports, Science and Technology Japan. "Eco-car project" is one of these practical ecology/environment education programs. The project's members have been learning and researching the environmental managements by the process of design, manufacturing, and assembly of solar car, highly effective fuel consumption car (Eco-run car), electric vehicle and fuel-cell car. Also this project was supported by some professional experts of the local industries and community. The students learned the actual industrial technique, the engineering management and the structure of local industries by this project. In this paper, the environmental intention engineering design education with local industry collaboration is introduced.

TAMA-300 PROJECT FOR GRAVITATIONAL WAVE DETECTOR

  • KOZAI YOSHIHIDE;TEAM TAMA-300 PROJECT
    • Journal of The Korean Astronomical Society
    • /
    • v.29 no.spc1
    • /
    • pp.279-280
    • /
    • 1996
  • This paper reports on the outline and the status of the TAMA-300 project, the 300 meter laser interferometer gravitational wave detector developed by a team of scientists of several research institutes and universities in Japan. In fact the project has been funded and its construction started at the National Astronomical Observatory, Mitaka, in spring 1995. And the constructions of the tunnels for the east-west and north-south arms and of the central building are completed and a half of pipes for laser beams were brought in. Very stable laser oscillator has been almost completed and mew techniques such as vibration isolations, recycling of laser power, and suspension of mirrors by double pendulums have been developed. In fact the purposes of the project are to establish techniques necessary for future km-class detectors and to operate the detector to catch possible gravitational wave events in nearby galaxies such as Andromeda, the target sensitivity being $3 {\times} 10^{-21}$ at 300Hz.

  • PDF

Conflict Avoidance in Construction Projects: Six 'C' Rescue Factors

  • Acharya Nirmal Kumar;Lee Young-Dai;Kim Sa-Myeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.193-204
    • /
    • 2005
  • Conflict is aroused when different people having different interest work together for fulfilling same the objectives. As the construction field is large, complex, volatile and requires tremendous capital, there are always greater challenges and possibility of risks of conflicts. Poor management practices in construction site and trying to protect risks and threats by contracting parties are the cited sources of the construction conflicts. The best management practice is to resolve the problems before these cultivate as conflicts. This paper has identified six dispute avoidance factors-Convince, Coordination, Consideration, Compromise, Consolation and Coercion. Six 'C' factors described in this paper are the mantra (formula) to execute a conflict free construction project. The conflict avoidance factors have been verified through a successfully executed project called TEVT development project (Technical Education and Vocational Training) during 1993-1998 in Nepal. The results show that the six 'C' factors 'C' considered during the implementation of the project, construction conflicts would be controlled or minimized effectively.

A Study on Development of IT System Roadmap in Construction industry

  • Xue-Quan Lee;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1404-1409
    • /
    • 2009
  • These days, the extension and complication of construction project has attached greater significance to IT system for effective project management. Construction companies inside the country have established IT system, but the fact is that they are not up to the expectations of investment provision, and the absense of objective and strategy about project management information system makes its efficiency doubtful. The research, from the point view of construction company, makes an estimate of indefinite future, and presents the process of making out IT system roadmap as a long-term strategy in building IT system.

  • PDF