• Title/Summary/Keyword: national investment cost

Search Result 339, Processing Time 0.036 seconds

Intangible Cost Influence on Business Performance of Wholesale and Retail Brokerage in Korea: Focusing on HRM, Marketing and CSR

  • KIM, Boine;KIM, Byoung-Goo
    • Journal of Distribution Science
    • /
    • v.20 no.5
    • /
    • pp.119-127
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the Cost-Effectiveness Analysis (CEA) of wholesale and retail brokerage businesses in Korea. And give managerial implications and contribute to academics. Research design, data and methodology: This research empirically analyzes the relationship between expenses and business performance. As for business performance, this research considered two financial performances; sales and profit. As for antecedent variables, this research measured three cost investment expenses; human resource management (HRM), marketing (MKT) and corporate social responsibility (CSR). This research used frequency analysis, correlation analysis, stepwise regression analysis and curve estimation analysis. Results: The result shows that HRM and CSR positive significant influence on sales yet marketing negatively significant influence on sales. And for profit, HRM and CSR give a positive significant influence. However, marketing's influence was not significant. According to curve estimation analysis, the relation between individual cost and performance, best functional relation was all quadratic functions. Some results show ∩ shape and others show shape. Conclusions: Based on this study result, implications for practical management to Wholesale and Retail Brokerage companies in Korea. And the contribution to academics is expected. Also, based on the limitation of this study, future research is suggested.

Environmental Accounting of the Total Maximum Daily Loads (TMDL) Program in the Nakdong River Basin using the Emergy Analysis (Emergy 분석을 이용한 낙동강유역의 오염총량관리계획에 대한 환경회계)

  • Kim, Jin Lee;Lee, Su-Woong;Kim, Yong-Seok;Lee, Suk-Mo
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.3
    • /
    • pp.349-356
    • /
    • 2011
  • This study, which evaluated the contribution of the real economic value and system in the Nakdong River Basin, estimated the emergy analysis for environmental accounting of the TMDL program. And an environmental accounting for TMDL is evaluated before and after adopting TMDL program respectively. The value of emergy after adopting the TMDL was 7.90 E+20 sej/yr. Although the real yield of the river after governmental investment was high (before: 9.7118 E+20 sej/yr and after: 9.7224 E+20 sej/yr), the effects of improvement was not great, in terms of an investment cost. The benefit/cost ratio resulted from environmental accounting has decreased from 1.493 to 1.230 due to the cost of managing treatment facilities. The method of improving water quality in the Nakdong River Basin by the TMDL program should be changed into an ecological treatment facilities using resources efficiently from a control of water quality depending on expansion of the wastewater treatment facilities and advanced treatment plant using high cost and non-renewable energies.

Policy Directions & Efficient Investment Strategy in Transportation Infrastructure (긴급제언 - 교통인프라 정책방향과 투자효율화 전략)

  • Lee, Sun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.46 no.1
    • /
    • pp.49-54
    • /
    • 2013
  • The total estimated socioeconomic logistics cost in transportation sector, including traffic congestion, household travel expenses, national macroeconomic logistics and traffic accident related cost, amount to approximately 240 trillion won a year in 2009. The amount is in increasing trend every year due to the inefficient infrastructure system in urban city roads and in intercity highways. The Government adopts the 4th National Spatial Planning (Revised) which is in progress in order to build a new physical environment ensuring people's welfare by providing the efficient and sustainable transportation networking system.

  • PDF

Comparative Evaluation between Cool Roof and Green Roof in terms of Installation Cost: a Case Study of KNU Campus (설비 투자비용의 관점에서 쿨루프와 옥상녹화의 비교 평가: 경북대학교 캠퍼스 사례를 중심으로)

  • Kim, Jun-Woo;Um, Jung-Sup
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.6
    • /
    • pp.927-939
    • /
    • 2012
  • Cool roofs are currently being emerged as one of important mechanism to save energy in relation to the building. Although green roof has already gained nation-wide recognition as a typical method of energy saving in the roof, this approach did not provide a realistic evidence that is economically feasible in terms of installation cost. This research is primarily intended to compare installation cost between the two techniques. This research proposes a comparative evaluation framework in a more objective and quantitative way for an installation cost between the two techniques. Kyungpook National University (KNU) was selected as a survey objective and an exhaustive and realistic comparison of installation cost between the two techniques was conducted, based on Life Cycle Cost analysis (initial investment cost, maintenance cost, dismantling and waste disposal expense). It was possible to identify that installation cost of cool roofs is 4.7 times cheaper than that of green roof. Also present value based on probabilistic approach was identified as 0.25 (4.95) higher than the installation cost on the assumption of constant price and interest. It is expected that much more installation cost for the large scale green roof will be required since small-size green roof selected as a survey objective in this study could be operated under less initial installation and maintenance condition.

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF

Transmission System Expansion Planning Considering Outage Cost (공급지장비를 포함한 송전계통계획)

  • Choi, Jae-Seok;Oh, Tae-Gon;Lim, Jin-Taek;Cho, Kyeong-Hee;Jeon, Don-Hoon;Hong, Sung-Eun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.361-363
    • /
    • 2011
  • This paper proposes a method for choosing the best transmission system expansion(TEP) plan considering an annual outage cost and a probabilistic transmission system reliability criterion ($_RLOLE_{TS}$). The objective method minimizes a total cost which are an investment budget for constructing new transmission lines and an annual outage cost, subject to the probabilistic transmission system reliability criterion, which consider the uncertainties of power system facilities. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the transmission system expansion planning problem subject to practical future uncertainties.

  • PDF

Optimizing Design Problem in an Automotive Body Assembly Line Considering Cost Factors (비용요소를 고려한 자동차 차체조립라인의 설계 최적화)

  • Lee, Young Hoon;Kim, Dong Ok;Baek, Gyeong Min;Shin, Yang Woo;Moon, Dug Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.4
    • /
    • pp.95-109
    • /
    • 2020
  • In this paper, an optimal manufacturing system design problem in an automotive body assembly lines is introduced when various costs such as equipment investment costs are considered. Meta-model methodology based on simulation results has been used for estimating the performances of the system such as production rate and work-in-process levels. The objective function is minimizing total cost which satisfies the target production rate. The investment costs such as robots, buffers, transportation equipment, and the inventory holding cost of work-in-process have been included in the objective function. Harmony search method has been used for optimization.

A Framework for Deriving Investment Priority in National Defense R&D - Using DEA based on TRA - (국방연구개발 투자우선순위 도출 프레임워크 - TRA 방법론에 기반한 DEA 중심으로 -)

  • Yu, Donghyun;Lim, Dongil;Seol, Hyeonju
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.2
    • /
    • pp.217-224
    • /
    • 2018
  • The purpose of this study is to evaluate the future potential value of CTE(Critical Technology Element)s that are evaluated to be low in TRA(Technology Readiness Assesment) and to present investment prioritization technologies in defense R&D(Research and Development) based on them. To do this, we used the DEA(Data Envelopment Analysis) method, which is useful in evaluating the efficiency of the organization. Specifically, we suggest a systematic framework to evaluate the future value of CTEs by setting the CTEs derived from the TRA process to DMU(Decision Making Unit)s, the cost and time required to develop each CTE as the input factor of the DEA and the effects of the development of each CTE as the output factor of the DEA respectively. We also conducted an illustrative case study on radar technologies to demonstrate the usefulness of the proposed approach.

An Economic Analysis of Black Rockfish, Sebastes schlegeli in the Marine Floating Cage Culture (조피볼락 해상가두리 양식업의 지역별·규모별 경제성 분석)

  • Son, Maeng-Hyun;Park, Min-Woo;Lim, Han-Kyu
    • The Journal of Fisheries Business Administration
    • /
    • v.45 no.1
    • /
    • pp.95-107
    • /
    • 2014
  • This study is aimed to analyze the economic performance of black rockfish aquaculture by standardizing cost structures by region and farming size. The result of survey on farming and sale condition in each region, stocking density, survival rate, juvenile price, and unit production was the highest at Yeosu and Tongyeong, Heuksando showed the lowest. While rearing period was the longest at Tongyeong, the shortest region was Yeosu and Wando. In farming cost structure by region, amount of feeing was the highest at Tongyeong and Yeosu, and the lowest was Heuksando. Cost of medicine was high in Wando and Taean region, Yeosu and Hecksando was low. In case of farm size, feed cost ratio was high in the order of medium(0.75ha), small(0.25ha) and large(1.25ha) size. Standard production cost at every farm size of Heuksando showed the lowest among these regions. Taean and Yeosu was middle, and Tongyeong and Wando was the highest. According to the income, profit rate and investment return of farm size in all regions, as the bigger farm size, the higher income and profit rate was revealed. However, in case of Wando, Taean, and Heuksando which regions has high investment return, medium farm size was higher than large size. The result of economic analysis according to various factors, economic feasibility of black rockfish aquaculture in marine floating cage was showed significant changes by rearing and market condition.

A Study on Macroscopic Future maintenance Investment Scale for National SOC Infrastructure (국가 사회기반시설물에 대한 거시적 관점의 미래 유지보수 투자규모에 관한 연구)

  • Lee, Dong-Hyun;Jun, Tae-Hyun;Kim, Ji-Won;Park, Ki-Tae;Kim, Yongsoo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.4
    • /
    • pp.87-96
    • /
    • 2017
  • It is important to estimate the future maintenance budget of all SOC infrastructure at the national strategic level. In this study, Based on a currently available statistics data, we predicted future maintenance investment for all SOC infrastructure in Korea. We have studied the applicable prediction models, and we developed the prediction models that can calculated the future maintenance cost by a real expenditure date. The subjects of facilities are bridges, tunnels, pavements, harbors, dams, airports, water supply, rivers and port. As a result of total estimated cost, eight types of SOC infrastructures are about 23 trillion won for the next 10years, and the most expensive facilities are road pavements and bridges.