Critical Assessment of Programme-Based Conflict Resolution Model Applied to Multiple Stakeholders Within The Context of Industrialized Building Production and Life Cycle Supply Chain System

  • Tanaka, Koji
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.551-562
    • /
    • 2022
  • The building production system has been analysed by the dichotomy "employer-contractor" relationship, which failed to take into account of the role and function of multiple stakeholders within the life-cycle supply chain. This is further observed in the current conflict resolution model, which, in my argument, struggles to contribute to industrialize the building production and achieve better efficiency and effectiveness as expected. The purpose of this paper is to critically assess the issues of current programme-based conflict resolution model, and discuss alternative models how they can be modelled and applied to the construction projects. The conclusions of findings are; First, the current model is framed around the contracts and dispute resolutions based on the legal concept of "claimant and respondent" where one party(s) advances a claim once and the other(s) objects, as such it fails to reflect the nature of construction projects where multiple stakeholders are involved concurrently and for a long period of life-cycle of buildings. Second, an alternative is "Six-stakeholders model" which represents the multiple stakeholders and clarifies the flow of obligation-liability-monetary relationships among participants for a long period of life-cycle of buildings. Further, with reference to both historical and recent cases, a reflection and insight into pros and cons of programming method is added, especially as to why this method is considered to have become a mandate of the modern construction management, and how academics and practitioners should deal with it more cautiously and prudently.

  • PDF

주한 미군 EC 프로젝트의 현황과 시공관리 주체의 변화에 대한 기초연구 (A Pilot Study on the Present State and Transformation of Construction Management Actors of USFK's EC Projects)

  • 김덕수
    • 한국건설관리학회논문집
    • /
    • 제7권3호
    • /
    • pp.65-75
    • /
    • 2006
  • 주한 미군의 EC(Engineering/Construction) 시장에서 최근 나타나는 경향은: (1) MATOC(Multiple Award Task Order Contract)의 도입: (2)프로젝트의 대형화: 그리고 (3)대형 미국 EC회사들의 주한 미군 시장 진입으로 요약된다. 이러한 새로운 경향에 대한 이해를 바탕으로, 본 연구는 주한 미군 EC 시장의 변화를 시공관리 주체의 변화에 초점을 맞추어 분석한다. 구체적으로 살펴보면, 주한 미군 EC 프로젝트들은 FED에 의해 관리되어 왔다. 그러나 최근에는 대형 미국 민간 EC 회사들이 한국에 진입하여 FED의 시공관리 역할을 대체하고 있다. 이러한 현상은 향 후 10여 년 간의 LPP(Land Partnership Plan: 한미연합 토지 관리계획)에 의한 한국에서의 비즈니스 기회와 시공관리 주체의 민영화를 통해 군 관련 공사비를 절약하려는 미 정부의 의도에 따라 가속화 되고 있다. 이러한 시장의 변화는 미국 대형 EC 회사들과의 JV(Joint Venture)를 통해 외국 시장에 관한 정보를 획득하고 선진 시공 관리 기술을 배울 수 있는 기회가 되기 때문에, 주한 미군 한국 EC 시장에 진입하는 미국의 대형 EC 회사들은 주한 미군 공사를 수주해 온 국내 EC 회사들에게는 위협임과 동시에 기회일 수 있다.

전통시장 지원사업과 경쟁 강도가 점포매출액과 방문고객 수에 미치는 영향 (The Effects of Traditional Market Support Projects and Competition Intensity of Stores on Store Sales and Number of Visitors)

  • 이철성
    • 유통과학연구
    • /
    • 제17권3호
    • /
    • pp.97-105
    • /
    • 2019
  • Purpose - The purpose of this study is to investigate the effect of the government support project on traditional market and the interaction effect between the government support project and the competition intensity. Therefore, this study focuses on the competition intensity of individual stores in traditional markets, unlike the traditional research flow, which is beyond the competitive structure of traditional markets and large retailers. Research design, data, and methodology - This study is based on the data of 'Statistics of Traditional Market in 2017'. In this study, a multiple regression equation was constructed using the number of government support projects as an independent variable, competition intensity as an interaction, and sales per store, number of customers per store as a dependent variable for analysis. A multiple regression equation was constructed for the main effect analysis. To investigate the effect of the interaction, cohen(1980)'s regression equation and two-way ANOVA were used. Results - First, according to this study, the traditional market participated in the government support project showed that the sales and the number of visitors per store in the traditional market were higher than those in the non-participation market. Second, the impact of government support projects on sales per store(also number of visiting customers per store) can be different depending on the competition intensity. More specifically, if the market is politically supported by a market with a high level of competition, it may be more effective than the market with no support. Conclusions - Based on the results of the study, we suggested academic and practical implications and suggested that competition intensity of stores in the traditional market should be considered in the future. The implications of this study are as follows. First, the effects of the government's traditional market support project were analyzed empirically. Second, this study is different from the previous studies in that it examined the competitive strengths and the effects of individual stores in traditional markets, away from competition between traditional market and large retailers. Third, it provided practical implications for the operation of government support projects.

CBD프로젝트의 정보시스템감리 사례연구 (A Case Study of Information System Auditing of CBD Project)

  • 조남재;박기호;전순천;박준호
    • Journal of Information Technology Applications and Management
    • /
    • 제11권2호
    • /
    • pp.167-178
    • /
    • 2004
  • Different from traditional development methodologies like waterfall model, the CBD (component based development) methodology relies on a building block approach in the design and development of information system. The audit procedure and checklist for the traditional IS development methodology are required to be modified to be suitable for CBD. This research reviewed IS audit guidelines for the existing development process and analyzed multiple projects that employed the by component based development process. For the purpose of this study, we chose a governmental project and a next-generation IS project of a financial agency as sample cases. By comparing existing IS audit checklists and items actually reviewed in audit projects, this study identified appropriate check items for the CBD-centric audit program. New items were proposed as additional items such as project control in management phase, usage case and conceptual model establishment, component evaluation and design, in implementation phase, and so forth. The result of the research provides new guidelines for the audit CBD projects for the purposed of increased efficiency and qualify of application development projects.

  • PDF

MODELS FOR PREDICTING SINGAPORE CONTRACTORS' EXTENT OF INTERNATIONALIZATION

  • Florence Y.Y. Ling;Denise H.Y. Kwok
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.995-999
    • /
    • 2009
  • Before a contractor embarks on exporting its services, it needs to know if it is likely to succeed. This research developed two prediction models to help contractors in Singapore predict the number of projects (Y1) and the contract values (Y2) that they are likely to secure from overseas. Detailed characteristics of 60 contractors who export their services (exporters) were obtained from the database of registered contractors in Singapore. Multiple linear regression models were developed and tests showed that Y1 is a robust model. A contractor's chance of winning more overseas projects may be predicted by the number of projects it acted as a subcontractor; the variety of projects it undertakes; the total contract value in the domestic market; and the number of countries it exported its services to. It is recommended that contractors who are planning to export their services be flexible instead of adopt a focused policy of undertaking only one or two project types in a few selected countries.

  • PDF

A STUDY ON DEVELOPING DECISION SUPPORT MODULES OF iPMIS(INTELLIGENT PROGRAM MANAGEMEN INFORMATION SYSTEM) FROM ONTOLOGICAL PERSPECTIVE

  • Jae-Bok Lim;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.717-724
    • /
    • 2009
  • Most recent programs in and out of the country are related to urban renewal projects. Contemporary project management information systems have been developed was to manage single or multiple projects focusing on their construction phase, and those have limitations to apply to large-scale complicated mega projects. So, this study explain the core concept of decision support modules for iPMIS (Intelligent Program Management Information System) and its major functions to support project owner and participants by introducing ontology in the web environment. This study confined the scope of research to the planning phase of urban environment improvement projects. Ontological logic structure and relation about planning works is essential parts and three functions to implement decision support module are developed.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

건축프로젝트 현장 조직 커뮤니케이션이 성과에 미치는 영향 (Influence of Site Organization's Communication on Performance of Building Construction Projects)

  • 안성훈;이웅균
    • 한국건축시공학회지
    • /
    • 제17권4호
    • /
    • pp.361-367
    • /
    • 2017
  • 건축프로젝트의 성공적인 수행을 위해서는 현장 조직의 커뮤니케이션 수준을 높여서 조직 구성원의 협업 능력을 향상시켜야 한다. 따라서 본 연구의 목적은 건축프로젝트 현장 조직을 대상으로 현장 조직 커뮤니케이션이 프로젝트 성과에 어떤 영향을 미치는지 파악하는 것이다. 연구 결과 커뮤니케이션 품질은 프로젝트 성과에 긍정적인 영향을 미치며, 정보공유는 프로젝트 성과에 부정적인 영향을 미치는 것으로 나타났다. 따라서 건축프로젝트 성과를 향상시키기 위해서는 현장 조직에서 정보공유를 일정수준 이상 달성해야 하고, 커뮤니케이션 품질을 향상시켜야 한다. 본 연구 결과는 건축프로젝트 현장 조직의 수행관리 체계를 구축하는데 기여할 수 있을 것이다.

스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로 (A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City)

  • 이상호;조희연;민윤홍
    • 한국빅데이터학회지
    • /
    • 제8권1호
    • /
    • pp.83-97
    • /
    • 2023
  • 프로젝트의 평가란 프로젝트의 진행상황과 결과물을 평가하는 과정이다. 스마트시티 프로젝트들은 시스템 구성요소별(인프라, 서비스, 플랫폼)로 프로젝트가 나뉘기도 하고, 여러 가지 서비스별로 프로젝트들이 동시에 진행되기도 한다. 또한 추가 프로젝트를 통하여 서비스들이 개발되고 확장되기도 한다. 이렇게 여러 가지 프로젝트들이 복합적으로 진행되는 스마트시티가 목표 및 전략에 맞추어 진행되기 위해서는 프로젝트를 수행하는 과정에서 주기적인 프로젝트 평가가 필요하다. 본 논문이 제안한 스마트시티 프로젝트 평가체계는 스마트시티의 기획, 설계, 구축 및 운영의 전 단계에서 발생하는 프로젝트에 대해서 반드시 고려해야 할 다양한 요소를 반영하여 종합적이고 객관적인 지표를 제공하도록 설계되었다. 평가체계로부터 도출된 지표는 의사결정자가 스마트시티 프로젝트 개발 방향을 결정하는데 사용될 수 있다. 또한 프로젝트의 종료 이전에도 프로젝트의 성과를 중간 평가하고 이로부터 얻은 피드백을 반영할 수 있도록 설계하였다. 본 연구가 제안한 스마트시티 프로젝트 평가체계의 적용 방법을 소개하기 위해 인천경제자유구역청(IFEZ)의 스마트시티 프로젝트 사례에 개발된 평가체계를 적용하였다. 또한 평가결과를 바탕으로 스마트시티 프로젝트 항목별 개선효과를 극대화할 수 있는 항목을 제시함으로써 스마트시티 프로젝트 추진 방향을 제시하였다. 여러 가지 프로젝트들이 복합적으로 진행되는 스마트시티 프로젝트의 특성을 반영한 스마트시티 프로젝트 평가체계를 활용함으로써 스마트시티 프로젝트의 종합적인 계획 및 관리가 가능할 것이며, 프로젝트의 우선적인 개선 요소를 파악하는 데 본 연구가 참고가 될 것이다.

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제18권2호
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.