• Title/Summary/Keyword: multi-purpose reservoir

Search Result 94, Processing Time 0.026 seconds

Measuring Recreational Benefits of Chilgap Reservoir Using TCM (TCM을 이용한 칠갑저수지의 레크리에이션 편익 분석)

  • Hong, Seungjee;Kim, Dae-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.3
    • /
    • pp.97-106
    • /
    • 2016
  • The study attempts to estimate the recreational benefits of Chilgap multi-purpose reservoir using the on-site survey sample of 130 visitors. The individual travel cost method is used for measuring the recreational benefits of Chilgap multi-purpose reservoir and a zero-truncated negative binomial model is used to elicit the travel demand function. The price elasticities of visit demand are ranged from 0.29 to 0.39. Recreational benefits are ranged from 119 to 156 thousand won per visit and are ranged from 292 to 383 thousand won per annual. When the number of annual visitors to Chilgap reservoir is appled, then the recreational benefits are ranged from 2.7 to 3.6 billion won. This study could contribute to the advancement of post-construction evaluation in the public construction field similar to Chilgap reservoir.

A Study of Optimal Operation Policy using Risk Evaluation Criteria(I) (for the Daechung Multi-purpose Reservoir) (위험도 평가기준을 적용한 저수지 최적운영방안 연구(I) (대청댐을 중심으로))

  • Park, Myeong-Gi;Kim, Jae-Han;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.1
    • /
    • pp.37-49
    • /
    • 2002
  • The application of conventional method for optimizing firm water supply and hydro-electric power generation has some limitation during abnormal or extreme drought periods. Hashimoto et al. (1982) suggested there risk evaluation criteria such as reliability, resilience, and vulnerability. These three criteria have been incorporated into a mixed-integer programming model for evaluating the possible performance of water- supply reservoir (Moy et al., 1986; Srinivasan et al., 1999). However, till now, these kind of researches have been conducted only for water-supply reservoir. Therefore there have been no other study for multi-purpose dam including hydro-electric power generation. This study presents an improved formulation of the previous model for evaluating a multi-purpose reservoir system operation considering water supply and hydro-electric power generation. The modified model was applied to the Daechung multi-purpose reservoir system in the Keum river basin to demonstrate the efficiency of the improved formulation.

Assessment of Economic Value of Sangkwan Multi-Purpose Reservoir (II): Benefits of Recreational Water (상관 다기능 저류지 조성의 경제적 편익 평가(II): 레크리에이션용수 공급편익을 중심으로)

  • Lee, Joo-Suk;Ryu, Moon-Hyun;Yoo, Seung-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.10
    • /
    • pp.997-1004
    • /
    • 2013
  • There is imminent need to find a way to measure the recreational benefits of water so that appropriate actions can be taken to make a multi-purpose reservoir. Therefore, this study attempts to apply a choice experiment to quantifying the recreational benefits of a multi-purpose reservoir, using a specific case study of Sangkwan multi-purpose reservoir. We consider the trade-offs between price and attributes of recreational attributes for selecting a preferred alternative and derive the marginal willingness to pay (MWTP) estimate for each attribute. The results show that the MWTP for providing additional 10,000 ton of water is estimated to be 3 won per household per year. The MWTP for improving 1 level of water quality is computed to be 645.5 won per household per year. Moreover, the MWTP for providing recreation facilities is calculated to be 1,518.6 won per household per year. This study allows us to provide policy-makers with useful quantitative information that can reduce uncertainty in the decision-making process related to a multi-purpose reservoir construction projects.

Assessment of Economic Value of Sangkwan Multi-Purpose Reservoir (I): Benefits of Environmentally-Enhancing Water (상관 다기능 저류지 조성의 경제적 편익 평가(I): 환경개선용수 공급편익을 중심으로)

  • Lee, Joo-Suk;Ryu, Moon-Hyun;Yoo, Seung-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.10
    • /
    • pp.989-995
    • /
    • 2013
  • This study attempts to estimate the benefits of environmentally-enhancing water ensuing from Sangkwan multi-purpose reservoir. To this end, we apply a survey technique, the contingent valuation (CV) method to elicit the public willingness to pay (WTP). Two CV surveys of randomly selected households were administrated to on-site and off-site areas. As it happens, a number of respondents reported zero WTPs for the environmentally- enhancing water. To deal with the zero WTPs, this study employs a spike model. The results show that average household's WTP for the environmentally-enhancing water ensuing from Sangkwan multi-purpose reservoir is estimated to be 1,393.7 won for on-site area and 2,237.7 won for off-site area per year. The benefits of environmentally-enhancing water ensuing from Sangkwan multi-purpose reservoir amount to about 38.3 billion won per year. Our findings are expected to contribute to determining an appropriate level of investment and making management policies with regard to the benefits of environmentally-enhancing water.

A Study for Storage Reallocation of Multipurpose Reservoir(I) - Flood Control Storage Analysis (다목적댐 용량 재할당에 대한 연구(I)- 치수용량 분석)

  • Yi, Jae-Eung;Kwon, Yong-Ik;Yoon, Young-Nam;Ahn, Tae-Jin
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.4
    • /
    • pp.273-281
    • /
    • 2004
  • Generally, reservoir storage is allocated according to planned purposes established before construction and operating policies are established through release control. The established reservoir allocation is hardly changed unless the special cases such as raising dam or changed purposes occur It Is, however, likely that public needs and objectives can be changed as time go on, the study for multipurpose reservoir storage reallocation is performed as an alternative to reflect these. In this study, flood control analysis is performed for several alternatives of reallocation for the Daechung multi-purpose reservoir in Geum river. As a result, it is confirmed that flood control capability is not decreased compared to single operation of Daechung reservoir for the same flood condition even if conservation level of Daechung multi-purpose reservoir is increased.

Flood Control Operation Model of Reservoir Using CSUDP (CSUDP를 이용한 홍수기 댐운영)

  • Lim, Kwang-Suop;Shim, Kyu-Cheoul;Hwang, Yeon-Sang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.918-922
    • /
    • 2006
  • The purpose of this study is development of operation model for flood control of multi-reservoir in river basin, which can provide the best decision of reservoir release in timely and appropriately manner using CSUDP. For verification and validation of the developed system, the Gum River Basin was selected, which has 82 rainfall gauging stations, 28 water level gauging and 2 multi-purpose reservoirs which can control flood. There was a successful simulation of the developed model and system, using the real-time data from the Han River Basin Flood Forecast Center. Specially, case study for '1995 flood was performed.

  • PDF

Optimized Allocation of Water for the Multi-Purpose Use in Agricultural Reservoirs (농업용 저수지의 다목적 이용을 위한 용수의 적정배분)

  • 신일선;권순국
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.29 no.3
    • /
    • pp.125-137
    • /
    • 1987
  • The purpose of this paper is to examine some difficulties in water management of agricultural reservoirs in Korea, for there are approximately more than 15,000 reservoirs which are now being utilized for the purpose of irrigation, along with the much amount of expenses and labors to be invested against droughts and floods periodically occurred. Recently, the effective use of water resources in the agricultural reservoirs with a single purpose, is becomming multiple according to the alterable environment of water use. Therefore, the task to allocate agricultural water rationally and economically must be solved for the multiple use of agricultural reservoirs. On the basis of the above statement, this study aims at suggesting the rational method of water management by introducing an optimal technique to allocate the water in an existing agricultural reservoir rationally, for the sake of maximizing the economic effect. To achieve this objective, a reservoir, called "0-Bongje" as a sample of the case study, is selected for an agricultural water development proiect of medium scale. As a model for the optimum allocation of water in the multi-purpose use of reservoirs a linear programming model is developed and analyzed. As a result, findings of the study are as follows : First, a linear programing model is developed for the optimum allocation of water in the multi-purpose use of agricultural reservoirs. By adopting the model in the case of reservoir called "O-Bongje," the optimum solution for such various objects as irrigation area, the amount of domestic water supply, the size of power generation, and the size of reservoir storage, etc., can be obtained. Second, by comparing the net benefits in each object under the changing condition of inflow into the reservoir, the factors which can most affect the yearly total net benefit can be drawn, and they are in the order of the amount of domestic water supply, irrigation area, and power generation. Third, the sensitivity analysis for the decision variable of irrigation which may have a first priority among the objects indicate that the effective method of water management can be rapidly suggested in accordance with a condition under the decreasing area of irrigation. Fourth, in the case of decision making on the water allocation policy in an existing multi-purpose reservoir, the rapid comparison of numerous alternatives can be possible by adopting the linear programming model. Besides, as the resources can be analyed in connection with various activities, it can be concluded that the linear programing model developed in this study is more quantitative than the traditional methods of analysis. Fifth, all the possible constraint equations, in using a linear programming model for adopting a water allocation problem in the agricultural reservoirs, are presented, and the method of analysis is also suggested in this study. Finally, as the linear programming model in this study is found comprehensive, the model can be adopted in any different kind of conditions of agricultural reservoirs for the purpose of analyzing optimum water allocation, if the economic and technical coefficients are known, and the decision variable is changed in accordance with the changing condition of irrigation area.

  • PDF

Improvement of Inflow Estimation Data by Precise Measurement of Water Level in Reservoir (저수지 수위 정밀 측정에 의한 댐 유입량 자료 개선)

  • Park, Ji-Chang;Kim, Nam;Ryoo, Kyong-Sik
    • Journal of Environmental Science International
    • /
    • v.18 no.3
    • /
    • pp.309-314
    • /
    • 2009
  • A accurate reservoir inflow is very important as providing information for decision making about the water balance and the flood control, as well as for dam safety. The methods to calculate the inflow were divided by the directed method to measure streamflow from upstream reservoirs and the indirected method to estimate using the correlation of reservoir water level and release. Currently, the inflow of multi-purpose dam is being calculated by the indirect method and the reservoir water level to calculate the storage capacity is being used by centimeters(cm) units. Corresponding to the storage volume of 1cm according to scale and water level of multi-purpose dam comes up to from several 10 thousand tons to several million tons. If it converts to inflow during 1 hour, and it comes to several hundred $m^3/sec$(CMS). Therefore, the inflow calculated on the hourly is largely deviated along the water level changes and is occurred minus value as the case. In this research, the water level gage has been developed so that it can measure a accurate water level for the improvement for the error and derivation of inflow, even though there might be various hydrology and meteorologic considerations to analyse the water balance of reservoir. Also, it is confirmed that the error and the standard derivation of data observed by the new gage is decreased by 89,6% and 1/3 & 87% and 2/3 compared to that observed by the existing gage of Daecheong and Juam multi-purpose dam.

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

A Study on the hydrological generation of streamflow - A study on the Range determination of reservoir - (하천유량의 수문학적 모의기술에 관한 연구(I) - 저수지의 Range 결정에 관한 연구)

  • Choe, Han-Gyu;Choe, Yeong-Park;Kim, Chi-Hong
    • Water for future
    • /
    • v.15 no.2
    • /
    • pp.33-39
    • /
    • 1982
  • For the determination of a reservoir capacity Rippl's mass-curve method has long been used with the past river flow data assuming the same flow records will be repeated in the future. In this study the synthetic generation methods of thomas-Fiering type and harmonic analysis were used to synthetically generate 50 years of monthly river inflows to three single-purpose reservoris(Chuncheon, Chungpyong, Hwacheon) and three multi-purpose reservoirs(Soyany, Andon, Daichung). The generated sequences of monthly flows were analyzed based on the range concept, and hence the so-determined ranges for single-prupose and multi-purpose rewervoirs were correlated with the number of monthly flow subseries, resulting an empirical equation of the Feller's type. (1) Single-purpose reservoir $$R_n=2.8357 I\sqrt{n}$$ (2) Multi-purpose reservoir $$R_n=2.5145 I\sqrt{n}$$ where, $R_n$:Range(㎥/S-M) n:periodic(12 months, ……120 months) I:Input mean(㎥/S-M) In Korea, the monthly inflow data generation will be fit to the Thomas-Fiering type, and this paper shows that the periodic range is easily calculated without the Rippl's mass-curve method as shown above formula.

  • PDF