• Title/Summary/Keyword: multi-echelon

Search Result 72, Processing Time 0.025 seconds

Integrated Order Scheduling with Limited Production Capacity of Multiple Producers in Distribution Requirement Planning Systems ( DRPs ) (DRP 시스템에서 생산지의 생산능력을 고려한 통합발주계획)

  • Yoo, Yeong-Joon;Rhee, Jong-Tae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.26 no.1
    • /
    • pp.17-26
    • /
    • 2000
  • This paper presents an integrated order scheduling method with the improved DRP concept for multi-echelon distribution system that has the constraint of limited production capacity of producers. The proposed method reflects the dynamic characteristics of inventory level changes in the regional and central distribution center. The simulation is done with two models : the traditional DRP method and the proposed method presented in this paper. From the results, the latter is more efficient than the former in cost, customer's service level as well as balanced production load on each producer.

  • PDF

Distribution Planning for Capacitated Supply Chains Using Tabu Search Approach (타부 탐색을 이용한 생산능력 제한하의 공급망 분배계획)

  • Kwon, Ick-Hyun;Baek, Jong-Kwan;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.18 no.1
    • /
    • pp.63-72
    • /
    • 2005
  • In this paper, we present a distribution planning method for a supply chain. Like a typical distribution network of manufacturing firms, we have the form of arborescence. To consider more realistic situation, we investigated that an outside supplier has limited capacity. The customer demands are given in deterministic form in finite number of discrete time periods. In this environment, we attempt to minimize the total costs, which is the sum of inventory holding and backorder costs over the distribution network during the planning horizon. To make the best of the restricted capacity, we propose the look-ahead feature. For looking ahead, we convert this problem into a single machine scheduling problem and utilize tabu search approach to solve it. Numerous simulation tests have shown that the proposed algorithm performs quite well.

An Algorithm to Determine the Spare Inventory Level of Finite Repairable-item Inventory System with Finite Number of Operating Items (유한가동제품을 가진 수리가능시스템의 여유제품수준의 결정)

  • Shin, Kyu-Chul;Kim, Jong-Soo;Hur, Sun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.15-23
    • /
    • 1998
  • This paper concerns the problem of determining the spare inventory level for multi-echelon repairable-item inventory system with finite number of operating items. We consider the system which has several bases and a central depot. When an item fails, it is dispatched to a repair facility and, a spare, if available, is plugged in immediately. When the failed item is repaired, it is sent to the base and either is used to fill a backorder or is stored at a spare inventory point. Using queueing network, we develop an algorithm to find the spare inventory level which minimizes the total expected cost and, simultaneously, satisfies a specified minimum fill rate. The results of the algorithm clearly indicate that the algorithm successfully generate output with optimal solution.

  • PDF

Spares Provisioning Problem for Repairable Items (수리가능 제품의 여유재고 비축문제)

  • 유형근;김만식;김종수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.22
    • /
    • pp.17-24
    • /
    • 1990
  • The inventory problem of the repairable items is modeled as a queueing network for the purpose of determining the number of spares in a multi-echelon repair system subject to stochastic failure. In this paper, we are considering a finite number of repairman at each base and the depot. After repair job has completed, the repaired items are returned to the base where they have originated. For the system, we identify the distribution of the total number of failed items which belongs to a base and develope a method to find spare inventory levels of the repairable items at each base to satisfy a specified minimum fill rate.

  • PDF

On Fleet Sizing and Distribution Policy of Transportation Equipments in Hub-and-Spoke Network (방사형 물류체계에서 수송장비의 보유대수 결정과 분배정책)

  • Seo, Sun-Keun;Lee, Byung-Ho
    • IE interfaces
    • /
    • v.11 no.1
    • /
    • pp.55-66
    • /
    • 1998
  • Fleet sizing and distribution of empty equipments are two of the most critical problems in managing transportation system. This paper develops a cost model for sizing a fleet and establishing decentralized redistribution polices of empty equipments by building from inventory theory of multi-echelon system in hub-and-spoke network. An analytical approach to determine control variables of redistribution policies in each terminal and fleet size of the transportation system is proposed and its results are validated by simulation model. Numerical experiments are conducted with respect to parameters of the model and test results for assumptions of the model are discussed.

  • PDF

An Energy Efficient Multi-Chaning Routing Protocol using Angle of Arrival for WSN (WSN 환경에서 AoA를 이용한 에너지 효율적 멀티체이닝 라우팅 프로토콜)

  • Chae, Ji-Hoon;Kwon, Tae-Wook
    • Journal of Korea Multimedia Society
    • /
    • v.25 no.11
    • /
    • pp.1564-1571
    • /
    • 2022
  • Wireless sensor network(WSN) is being used in various fields such as reconnaissance, echelon scale identification, weather observation, etc. using small sensors in an environment without a network infrastructure environment. In addition, WSN uses limited battery power, so study on routing protocols to extend the lifetime of the network is important. PEGASIS, a hierarchical routing protocol, accounts for the majority of energy-efficient routing protocol studies and is well known as a representative protocol. In this study, based on PEGASIS, we propose a protocol that constructs multiple chains rather than one chain using the AoA of nodes. The proposed protocol has the advantage of reducing the transmission distance of nodes and eliminating unnecessary transmissions, thereby increasing energy efficiency compared to the existing protocols.

A Genetic Algorithm for Integrated Inventory and Routing Problems in Two-echelon VMI Supply Chains (2단계 VMI 공급사슬에서 통합 재고/차량경로 문제를 위한 유전알고리듬 해법)

  • Park, Yang-Byung;Park, Hae-Soo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.34 no.3
    • /
    • pp.362-372
    • /
    • 2008
  • Manufacturers, or vendors, and their customers continue to adopt vendor-managed inventory(VMI) program to improve supply chain performance through collaboration achieved by consolidating replenishment responsibility upstream with vendors. In this paper, we construct a mixed integer linear programming model and propose a genetic algorithm for the integrated inventory and routing problems with lost sales maximizing the total profit in the VMI supply chains which comprise of a single manufacturer and multi-retailer. The proposed GA is compared with the mathematical model on the various sized test problems with respect to the solution quality and computation time. As a result, the GA demonstrates the capability of reaching solutions that are very close to those obtained by the mathematical model for small problems and stay within 3.2% from those obtained by the mathematical model for larger problems, with a much shorter computation time. Finally, we investigate the effects of the cost and operation variables on the total profit of the problem as well as the GA performance through the sensitivity analyses.

Design of a GIS-Based Distribution System with Service Consideration (서비스수준을 고려한 GIS기반의 차량 운송시스템)

  • 황흥석;조규성
    • Korean Management Science Review
    • /
    • v.18 no.2
    • /
    • pp.125-134
    • /
    • 2001
  • This paper is concerned with the development of a GIS-based distribution system with service consideration. The proposed model could be used for a wide range of logistics applications in planning, engineering and operational purpose for logistics system. This research addresses the formulation of those complex prob1ems of two-echelon logistics system to plan the incorporating supply center locations and distribution problems based on GIS. We propose an integrated logistics model for determining the optimal patterns of supply centers and inventory allocations (customers) with a three-step sequential approach. 1) First step, Developing GIS-distance model and stochastic set-covering program to determine Optimel pattern of supply center location. 2) Second step, Optimal sector-clustering to support customers. 3) Third step, Optimal vehicle rouse scheduling based on GIS, GIS-VRP In this research we developed GUI-tree program, the GIS-VRP provide the vehicle to users and freight information in real time. We applied a set of sample examples to this model and demonstrated samp1e results. It has been found that the proposed model is potentially efficient and useful in solving multi-depot problem through examples. However the proposed model can provide logistics decision makers to get the best supply schedule.

  • PDF

Continuing Gradual Reform in Vietnam: An Analysis of the 11th Congress of the Communist Party (베트남에서 점진적 개혁의 지속: 제11차 공산당대회 결과 분석)

  • LEE, Hanwoo
    • The Southeast Asian review
    • /
    • v.21 no.3
    • /
    • pp.105-138
    • /
    • 2011
  • The 11th Congress of the Vietnamese Communist Party(VCP) held in January 2011 was the forum to reconfirm the gradual reform. By analysing the documents submitted to the Congress, it can be realized that the VCP's reform policy reveals the compromise between conservative and progressive perspectives by "the Socialist-oriented Market Economy". The VCP proposes to proceed the balanced reform for the sustainable development by multi-sector economy to achieve the basis of the modern state by 2020 on the one hand and also urges to strive against "the peaceful evolution" to defend the socialist regime from abroad as well as within the party itself on the other hand. In personnel structure of the Central Committee and Politburo, this term of the Party still keeps the balance of the localities and sectors of the society. No big change was in the selection of top leaders, as almost of them were promoted slightly in the existing echelon of the Politburo. On the prospect of the reform process Vietnam will continue the reform as gradual as before.

A Study on the Repair Parts Inventory Cost Estimation and V-METRIC Application for PBL Contract (PBL 계약을 위한 수리부속 재고비용 예측과 V-METRIC의 활용에 관한 연구)

  • Kim, Yoon Hwa;Lee, Sung Yong
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.1
    • /
    • pp.79-88
    • /
    • 2017
  • For the PBL contract, it is necessary for the contracting parties to share information regarding the reasonable inventory-level and the cost of its repair parts for the estimated demand. There are various models which can be used for this purpose. Among them, V-METRIC model is considered to be the most efficient and is most frequently applied. However, this model is usually used for optimizing the inventory level of the repair parts of the system under operation. The model uses a time series forecast model to determine the demand rate, which is a mandatory input factor for the model, based on past field data. However, since the system at the deployment stage has no operational performance record, it is necessary to find another alternative to be used as the demand rate of the model application. This research applies the V-METRIC model to find the optimal inventory level and cost estimation for repairable items to meet the target operational availability, which is a key performance indicator, at the time of the PBL contract for the deployment system. This study uses the calculated value based on the allocated MTBF to the system as the demand rate, which is used as input data for the model. Also, we would like to examine changes in inventory level and cost according to the changes in target operational availability and MTBF allocation.