• Title/Summary/Keyword: multi project

Search Result 768, Processing Time 0.031 seconds

Need to Reduce Industrial Accidents through the Introduction of an Prevailing Wage System (적정임금제 도입을 통한 산업재해 감축 필요성 고찰)

  • Choonhwan Cho;Yeoncheol Shin;Kyung-Bo Han
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • In order to carry out construction work, it is urgent to introduce a proper wage system so that the cost burden of projects that have been won due to bleeding competition among original government buildings based on low-priced bids can be transferred to subcontractors. Purpose: Construction with illegal multi-level industrial structure needs to improve the wage reduction environment leading to order (100%) → original contractor (80%) → subcontractor (65%) → load contractor (65%) and aims to ensure wages for end workers. Method: Investigate the current status of labor cost appropriate payment plan in the construction industry, and investigate the case of the appropriate wage system (P.W) in the United States. In addition, the effect and direction of the appropriate wage system are presented. Result: Individual minimum wage security was also mentioned in the Constitution, and many researchers suggested that only the introduction of an appropriate wage system could solve the problem of reducing worker labor and ensure quality and safety. Conclusion: The proper wage system in the construction industry will block illegal multi-level and illegal foreign work, improve the labor environment in the construction market, create an influx of young workers, and have a significant impact on the construction industry's competitive structure, safety, and quality.

A Study on the Planning Approaches for Newly Constructed Purchased Rental Housing Utilizing Volumetric Modular Construction (모듈러 공법을 활용한 신축매입임대주택 계획방안 연구)

  • Ji-Eun Lee
    • Land and Housing Review
    • /
    • v.15 no.3
    • /
    • pp.129-140
    • /
    • 2024
  • This research explores the potential of purchased rental housing as a versatile solution for residential development. By focusing on smaller-scale construction compared to large residential complexes, purchased rental housing projects offer benefits such as shorter project durations and enhanced flexibility to accommodate residents' needs. This public-private collaboration extends to community planning, enabling tailored models beyond traditional rental housing frameworks. Currently, purchased rental housing, which is predominantly comprised of multi-unit house, multi-household house, and rowhouses, is in high demand and in short supply in metropolitan areas. Utilizing volumetric modular housing, considerations for module size and transportability are paramount, while advancements in construction methods, particularly prefabrication, offer efficiency and quality benefits. This study proposed three construction techniques to plan modular housing models and enhance construction and demolition efficiency: planning without columns in the middle of the unit, core production using volumetric modular construction methods, and industrialization of construction components alongside dry construction methods. Utilizing these methods, a new construction model for purchase lease housing was presented to address the need for new housing in the context of ageing housing renovation and demand fluctuations. The model comprises 16 units, with sizes ranging from 36 m2 to 54 m2, and can be applied on sites larger than 600 m2 with access to roads wider than 6 m. This promotes cluster-style development, which in turn increases construction efficiency in nearby plots.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Baseline Survey Seismic Attribute Analysis for CO2 Monitoring on the Aquistore CCS Project, Canada (캐나다 아퀴스토어 CCS 프로젝트의 이산화탄소 모니터링을 위한 Baseline 탄성파 속성분석)

  • Cheong, Snons;Kim, Byoung-Yeop;Bae, Jaeyu
    • Economic and Environmental Geology
    • /
    • v.46 no.6
    • /
    • pp.485-494
    • /
    • 2013
  • $CO_2$ Monitoring, Mitigation and Verification (MMV) is the essential part in the Carbon Capture and Storage (CCS) project in order to assure the storage permanence economically and environmentally. In large-scale CCS projects in the world, the seismic time-lapse survey is a key technology for monitoring the behavior of injected $CO_2$. In this study, we developed a basic process procedure for 3-D seismic baseline data from the Aquistore project, Estevan, Canada. Major target formations of Aquistore CCS project are the Winnipeg and the Deadwood sandstone formations located between 1,800 and 1,900 ms in traveltime. The analysis of trace energy and similarity attributes of seismic data followed by spectral decomposition are carried out for the characterization of $CO_2$ injection zone. High trace energies are concentrated in the northern part of the survey area at 1,800 ms and in the southern part at 1,850 ms in traveltime. The sandstone dominant regions are well recognized with high reflectivity by the trace energy analysis. Similarity attributes show two structural discontinuities trending the NW-SE direction at the target depth. Spectral decomposition of 5, 20 and 40 Hz frequency contents discriminated the successive E-W depositional events at the center of the research area. Additional noise rejection and stratigraphic interpretation on the baseline data followed by applying appropriate imaging technique will be helpful to investigate the differences between baseline data and multi-vintage monitor data.

Strategic Issues in Managing Complexity in NPD Projects (신제품개발 과정의 복잡성에 대한 주요 연구과제)

  • Kim, Jongbae
    • Asia Marketing Journal
    • /
    • v.7 no.3
    • /
    • pp.53-76
    • /
    • 2005
  • With rapid technological and market change, new product development (NPD) complexity is a significant issue that organizations continually face in their development projects. There are numerous factors, which cause development projects to become increasingly costly & complex. A product is more likely to be successfully developed and marketed when the complexity inherent in NPD projects is clearly understood and carefully managed. Based upon the previous studies, this study examines the nature and importance of complexity in developing new products and then identifies several issues in managing complexity. Issues considered include: definition of complexity : consequences of complexity; and methods for managing complexity in NPD projects. To achieve high performance in managing complexity in development projects, these issues need to be addressed, for example: A. Complexity inherent in NPD projects is multi-faceted and multidimensional. What factors need to be considered in defining and/or measuring complexity in a development project? For example, is it sufficient if complexity is defined only from a technological perspective, or is it more desirable to consider the entire array of complexity sources which NPD teams with different functions (e.g., marketing, R&D, manufacturing, etc.) face in the development process? Moreover, is it sufficient if complexity is measured only once during a development project, or is it more effective and useful to trace complexity changes over the entire development life cycle? B. Complexity inherent in a project can have negative as well as positive influences on NPD performance. Thus, which complexity impacts are usually considered negative and which are positive? Project complexity also can affect the entire organization. Any complexity could be better assessed in broader and longer perspective. What are some ways in which the long-term impact of complexity on an organization can be assessed and managed? C. Based upon previous studies, several approaches for managing complexity are derived. What are the weaknesses & strengths of each approach? Is there a desirable hierarchy or order among these approaches when more than one approach is used? Are there differences in the outcomes according to industry and product types (incremental or radical)? Answers to these and other questions can help organizations effectively manage the complexity inherent in most development projects. Complexity is worthy of additional attention from researchers and practitioners alike. Large-scale empirical investigations, jointly conducted by researchers and practitioners, will help gain useful insights into understanding and managing complexity. Those organizations that can accurately identify, assess, and manage the complexity inherent in projects are likely to gain important competitive advantages.

  • PDF

A Study on the Change of Built-up Areas using Remote Sensing Data (원격탐사 자료를 활용한 시가화지역의 변화에 관한 연구)

  • Kim, Yoon-Soo;Jung, Eung-Ho;Ryu, Ji-Won;Kim, Dae-Wuk
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2005
  • This study was performed to analyze time series landuse pattern of urban areas and the change of the areas by using remotely sensed multiple sensors. The results were as follows. First, according to the result of time series analysis, most agricultural land has been changed into built-up areas by development work such as the land development or land readjustment project, arrangement of science parks or military facilities, and location of public establishment like government buildings. Second, if the expansion of built-up areas maintains the present scale and speed, it seems that a lot of parts of land would be changed into built-up areas, especially centering around agricultural land, so it is necessary to establish the plan for urban space. Third, I have synthetically collected the data of the project of urban development and systematically monitored the process of in expansion the built-up areas up to now (from the past). I hereby could lay the foundation that makes us scientifically forecast the direction of expansion in the built-up areas by the urban development in the future.

  • PDF

A Study of the Establishment of BIM Design Environment based on Virtual Desktop Infrastructure(VDI) of Cloud Computing Technology (클라우드 컴퓨팅 기술을 활용한 데스크탑 가상화 기반의 BIM 설계 환경 구축에 관한 연구)

  • Shin, Joonghwan;Lee, Kyuhyup;Kwon, Soonwook;Choi, Gyuseong;Ko, Hyunglyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.118-128
    • /
    • 2015
  • Recently BIM technology has been expanded for using in construction project. Due to the high-cost of BIM infrastructure development, lack of regulations, lack of process and so forth, usage of BIM has been delayed than initial expectations. In design phase, especially, collaboration based on BIM system has been a key factor for successful next generation building project. Through the analysis of current research trends about IT technologies, virtualization and BIM service, data exchange such as drawings, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. The purpose of this study is to enable the cloud computing BIM server to provide several main functions such as editing models, 3D model viewing and checking, mark-up and snapshot in high-performance quality by proper design of VDI system. Concurrent client connection performance is a main technical index of VDI. Through testing of test-bed server client, developed VDI system's multi-connect control is evaluated. Performance-test result of BIM server VDI effect to development direction of cloud computing BIM service for commercialization.

Construction and Service of a Web-based Cyber-learning Platform for the Computational Science and Engineering Community in Korea (국내 계산과학공학 커뮤니티를 위한 웹 기반 사이버-러닝 플랫폼 구축 및 서비스)

  • Suh, Young-Kyoon;Cho, Kum Won
    • Journal of Internet Computing and Services
    • /
    • v.17 no.4
    • /
    • pp.115-125
    • /
    • 2016
  • Recently, many attentions have been paid to conducting convergence research across diverse disciplines. Along with this convergence era, an IT-based multi-disciplinary convergence project, called EDISON (EDucation-research Integrated Simulation On the Net), has been launched to support the studies of researchers engaged in several computational science and engineering (CSE) fields and to boost learning motivations of CSE students. Since 2011, we have been successfully carrying out the EDISON project. EDISON as a cyber-learning platform enables CSE researchers to share their own high-performance computing (HPC) simulation softwares developed to solve their research problems accompanying large-scale computation and I/O and users to run the softwares with little constraints on the web. Also, the EDISON platform has been utilized as lecture material by many universities in Korea. This article introduces the construction and service statistics of this EDISON platform. Specifically, we explicate several distinctions between EDISON and existing other HPC service platforms and discuss a three-layered technical architecture of the EDISON platform. We then present the up-to-date service statistics of EDISON over the past four years. Finally, we conclude this article and describe future plans.

An Exploratory Analysis School-based Intervention Studies to Prevent Smoking by American Adolescents (미국의 청소년 흡연예방을 위한 중재 프로그램의 현황)

  • Jung, Hye-Sun;Ha, Yeong-Mi;Jhang, Won-Gi;Lee, Ji-Won;Yi, Yun-Jeong;Yun, Soon-Nyung
    • Journal of the Korean Society of School Health
    • /
    • v.21 no.2
    • /
    • pp.119-134
    • /
    • 2008
  • Purpose: The purpose of this study is to understand a variety of intervention studies to prevent smoking by adolescents in U.S. and find out implications for Korea. Methods: This study reviewed articles found in the internet and analysed the data of US DHHS and CDC. Results: The School Health Policies and Programs Study (SHPPS) is a national survey periodically conducted to assess school health policies and programs of U.S. The main components of SHPPS are health education and physical education, health services, mental health and social services, school policies, and school environments. The CDC guidelines for school health programs to prevent tobacco use and addiction are composed of policy, instruction, curriculum, training, family involvement, tobacco-use cessation efforts, and evaluation. School-based interventions to prevent smoking can be classified into the categories of information-giving curricula, social competence curricula, social influence approaches, combined methods draw on social competence and social influence approaches and multi-modal programmes and Youth Empowerment study. The key programs for adolescent smoking prevention are ALERT Project, HSPP, TNT Project, MPP, NC YES. Conclusions: As smoking is often the first step of unhealthy behaviour such as alcohol drinking, illegal drugs, and violence, smoking prevention programmes for adolescents in U.S. have been comprehensive school-based health programs. In smoking prevention programs for adolescents, CDC plays a critical role by supporting survey, research, policy, and funds. The effectiveness of the programs was high when it was based on school and involved parents, community, and mass media. As the effect of each programme is not expected to last for a long time, consistent repetition of these interventions is essential. Current smoking prevention programs for adolescents are exploring the empowerment approach focused on the active involvement of participants rather than traditional approaches using order and discipline.

Validating the Structural Behavior and Response of Burj Khalifa: Synopsis of the Full Scale Structural Health Monitoring Programs

  • Abdelrazaq, Ahmad
    • International Journal of High-Rise Buildings
    • /
    • v.1 no.1
    • /
    • pp.37-51
    • /
    • 2012
  • New generation of tall and complex buildings systems are now introduced that are reflective of the latest development in materials, design, sustainability, construction, and IT technologies. While the complexity in design is being overcome by the availability and advances in structural analysis tools and readily advanced software, the design of these buildings are still reliant on minimum code requirements that yet to be validated in full scale. The involvement of the author in the design and construction planning of Burj Khalifa since its inception until its completion prompted the author to conceptually develop an extensive survey and real-time structural health monitoring program to validate all the fundamental assumptions mad for the design and construction planning of the tower. The Burj Khalifa Project is the tallest structure ever built by man; the tower is 828 meters tall and comprises of 162 floors above grade and 3 basement levels. Early integration of aerodynamic shaping and wind engineering played a major role in the architectural massing and design of this multi-use tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria established at the onset of the project design. Understanding the structural and foundation system behaviors of the tower are the key fundamental drivers for the development and execution of a state-of-the-art survey and structural health monitoring (SHM) programs. Therefore, the focus of this paper is to discuss the execution of the survey and real-time structural health monitoring programs to confirm the structural behavioral response of the tower during construction stage and during its service life; the monitoring programs included 1) monitoring the tower's foundation system, 2) monitoring the foundation settlement, 3) measuring the strains of the tower vertical elements, 4) measuring the wall and column vertical shortening due to elastic, shrinkage and creep effects, 5) measuring the lateral displacement of the tower under its own gravity loads (including asymmetrical effects) resulting from immediate elastic and long term creep effects, 6) measuring the building lateral movements and dynamic characteristic in real time during construction, 7) measuring the building displacements, accelerations, dynamic characteristics, and structural behavior in real time under building permanent conditions, 8) and monitoring the Pinnacle dynamic behavior and fatigue characteristics. This extensive SHM program has resulted in extensive insight into the structural response of the tower, allowed control the construction process, allowed for the evaluation of the structural response in effective and immediate manner and it allowed for immediate correlation between the measured and the predicted behavior. The survey and SHM programs developed for Burj Khalifa will with no doubt pioneer the use of new survey techniques and the execution of new SHM program concepts as part of the fundamental design of building structures. Moreover, this survey and SHM programs will be benchmarked as a model for the development of future generation of SHM programs for all critical and essential facilities, however, but with much improved devices and technologies, which are now being considered by the author for another tall and complex building development, that is presently under construction.