• Title/Summary/Keyword: modified pullout test

Search Result 13, Processing Time 0.018 seconds

Development Length of GFRP Rebars Based on Pullout Test (인발실험에 의한 GFRP 보강근의 정착길이 제안)

  • Choi, Dong-Uk;Ha, Sang-Su;Lee, Chang-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.3
    • /
    • pp.323-331
    • /
    • 2007
  • The development length equations of the GFRP rebars are suggested based on the pullout tests performed in this study. A total of 48 pullout and modified pullout tests were completed. Test variables included embedment length (L=10, 15, 20, and $30d_b$), vertical and horizontal installation of the rebars, height of the rebars (H=100 and 300 mm), and cover thickness $(C=2{\sim}5d_b)$. D13 GFRP rebars domestically developed were used in the experimental program. The average of the bond strength of all vertically installed GFRP rebars was 6.39 MPa with a 5% fractile of 4.63 MPa. A basic development length equation was derived that resulted in an equation equivalent to the one proposed in the ACI 440.1R-03. Careful reevaluation of the bond strength using the modified pullout test indicated that a modification of the design equation was necessary so that the basic development length increases by 11%. The top bar effect of the horizontally installed rebars as well as the effect of the cover thickness were determined and included in the set of suggested equations. Since the current equations were derived from testing rebars embedded in relatively low strength concrete $(f_{ck}=20{\sim}24MPa)$, they result in conservative development lengths when applied to bars embedded in higher strength concretes.

Effect of Mineral Admixture on Bond between Structural Synthetic Fiber and Latex Modified Cement Mortar under Sulfate Environments (황산염에 노출된 구조용 합성섬유와 라텍스 개질 시멘트 모르타르의 부착특성에 미치는 광물질 혼화재의 효과)

  • Kim, Dong-Hyun;Lee, Jung-Woo;Park, Chan-Gi
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.5
    • /
    • pp.25-34
    • /
    • 2012
  • It has been well known that concrete structures exposed to acid and sulfate environments such as sewer etc. show significant decrease in their durability due to chemical attack. Such deleterious acid and sulfate attacks lead to expansion and cracking in concrete, and thus, eventually result in damage to cement mortar by forming expansive hydration products due to the reaction between cement hydration products and acid and sulfate ions. In this study, the effect of fly ash and blast furnace slag on the bond performances of structural synthetic fiber in latex modified cement mortar under sulfate environments. Fly ash and blast furnace slag contents ranging from 0 % to 20 % are used in the mix proportions. The latex modified cement mortar specimens were immersed in fresh water, 8 % sodium sulfate ($Na_2SO_4$) solutions for 28 and 50 days, respectively. Pullout tests are conducted to measure the bond performance of structural synthetic fiber from latex modified cement mortar after sulfate environments exposure. Test results are found that the incorporation of fly ash and blast furnace slag can effectively enhance the PVA fiber-latex modified cement mortar interfacial bond properties (bond behavior, bond strength and interface toughness) after sulfate environments exposure. The microstructural observation confirms the findings on the interface bond mechanism drawn from the fiber pullout test results under sulfate environments.

Indoor and outdoor pullout tests for retrofit anchors in low strength concrete

  • Cavunt, Derya;Cavunt, Yavuz S.;Ilki, Alper
    • Computers and Concrete
    • /
    • v.18 no.5
    • /
    • pp.951-968
    • /
    • 2016
  • In this study, pullout capacities of post-installed deformed bars anchored in low strength concrete using different bonding materials are investigated experimentally. The experimental study was conducted under outdoor and indoor conditions; on the beams of an actual reinforced concrete building and on concrete bases constructed at Istanbul Technical University (ITU). Ready-mixed cement based anchorage mortar with modified polymers (M1), ordinary cement with modified polymer admixture (M2), and epoxy based anchorage mortar with two components (E) were used as bonding material. Furthermore, test results are compared with the predictions of current analytical models. Findings of the study showed that properly designed cement based mortars can be efficiently used for anchoring deformed bars in low quality concrete. It is important to note that the cost of cement based mortar is much lower with respect to conventional epoxy based anchorage materials.

Comparison of Development Length Equation of Bottom and Top GFRP Bars with Splitting Failure (쪼갬파괴된 GFRP 하부근과 상부근의 정착길이 산정식 비교)

  • Ha, Sang-Su;Yoon, Joon-Sun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.141-149
    • /
    • 2009
  • The objective of this study was to propose a development length equation for bottom and top GFRP bars. Including the bottom and top GRPP bars, a total of 104 modified pullout tests were completed. The test variables were embedment length (15, 30, 45db), net cover thickness (0.5~2.0db), different GFRP bar types, and bar diameters (10, 13, 16mm). The average bond stresses were determined based on the modified pullout test results. Two variable linear regression analyses were performed on the results of the average bond stresses. Utilizing the 5% fractile concept, a conservative development length design equation was derived. The design equation of the development length for bottom and top GFRP bars was proposed and the design equation derived in this study was compared to the ACI 440.1R-06 committee equation.

An Performance Evaluation of the Post-installed Anchor System According to the Freezing and Thawing of Concrete and the Corrosion of Anchor (콘크리트의 동결융해와 앵커의 부식에 따른 후 설치 앵커시스템의 성능평가)

  • Kwon, Min-Ho;Kim, Jin-Sup;Jung, Woo-Young;Kwon, Sang-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.5
    • /
    • pp.31-39
    • /
    • 2013
  • In this study, performance of the post-installed anchor system was evaluated with reduced strength of concrete and anchor. One of the post-installed anchors was selected to performance evaluation. Concrete strength was reduced by freeze-thawing test, and the post-installed anchor strength was reduced by corrosion test. The post-installed Anchor was installed in concrete of freezing and thawing and original concrete, and corroded anchor was installed in original concrete only. Anchor diameter and installation depth of the anchor were the variable for each specimen. Performance of post-installed anchor system of each specimen was evaluated by pullout test. Anchor diameter and installation depth of anchor, it may affect the performance of the post-installed anchor system from the experimental test results. Fracture mode of each post-installed anchor system had occurred differently depending on the durability of concrete and anchor. The anchor pullout strength from the experimental test results was used in order to compare with the results of CCD (Concrete Capacity Design) method, and CCD equation was modified. Modified equation was able to predict the anchor pullout strength of post-installed anchor system in Original concrete and freezing and thawing of concrete.

Effect of high temperatures on local bond-slip behavior between rebars and UHPC

  • Tang, Chao-Wei
    • Structural Engineering and Mechanics
    • /
    • v.81 no.2
    • /
    • pp.163-178
    • /
    • 2022
  • This paper aimed to study the local bond-slip behavior between ultra-high-performance concrete (UHPC) and a reinforcing bar after exposure to high temperatures. A series of pull-out tests were carried out on cubic specimens of size 150×150×150 mm with deformed steel bar embedded for a fixed length of three times the diameter of the tested deformed bar. The experimental results of the bond stress-slip relationship were compared with the Euro-International Concrete Committee (CEB-Comite Euro-International du Beton)-International Federation for Prestressing (FIP-Federation Internationale de la Precontrainte) Model Code and with prediction models found in the literature. In addition, based on the test results, an empirical model of the bond stress-slip relationship was proposed. The evaluation and comparison results showed that the modified CEB-FIP Model code 2010 proposed by Aslani and Samali for the local bond stress-slip relationship for UHPC after exposure to high temperatures was more conservative. In contrast, for both room temperature and after exposure to high temperatures, the modified CEB-FIP Model Code 2010 local bond stress-slip model for UHPC proposed in this study was able to predict the test results with reasonable accuracy.

Pullout Bond Characteristics of Polymer Cement Slurry Coated Rebars (폴리머 시멘트 슬러리 도장철근의 인발부착 특성)

  • 김현기;김민호;장성주;김완기;소양섭
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.117-122
    • /
    • 2001
  • Recently, epoxy-coated re-bar used to the structure partly and put to practical use step, but not economical and appeared to the defect of deterioration of long term bond strength between concrete. The method for complement the defect of epoxy coated re-bar, study of polymer cement slurry coated re-bar started and basic properties appeared to excellent, but study of bond properties embedded in concrete specimens insufficient until now. This study attempts to examination of using possibility for bond strength of polymer cement slurry coated re-bar between concrete specimens compare to ACI Code and KS Code through pull-out test of 15cm$\times$15cm$\times$15cm specimens with polymer cement slurry coated re-bar as polymer cement ratio 50%, 100%, 150%, coating thickness 250${\mu}{\textrm}{m}$, 440${\mu}{\textrm}{m}$ and curing age. In the results of this study, the bond strength of polymer cement slurry coated re-bar compare to plain re-bar, epoxy coated re-bar decreased St/BA-modified polymer cement slurry coated re-bar, but bond strength of PA-modified polymer cement slurry coated re-bar appeared to excellent results. The bond properties of polymer cement slurry coated re-bar between concrete will be obtain more precise results according to compressive strength change of concrete and re-bar diameter size.

  • PDF

Development Length of GFRP Bars (GFRP 보강근의 정착길이 설계식 제안)

  • Ha, Sang-Su;Choi, Dong-Uk
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.1
    • /
    • pp.131-141
    • /
    • 2010
  • The objective of this study was to propose a development length equation for GFRP bars. A total of 104 modified pullout tests were completed while the test variables were embedment length (15, 30, $45d_b$), net cover thickness ($0.5{\sim}2.0d_b$), top-cast bar effect, different GFRP bar types (K2KR, K3KR and AsUS), and bar diameters (10, 13, 16 mm). Average bond stresses were determined based on modified pullout test results. Two variable linear regression analysis was performed of the average bond stresses. Utilizing 5% fractile concept, a conservative development length design equation was derived. The design equation derived in this study was compared to the ACI 440 committee equation. The cross-comparison revealed that the current equation resulted in shorter development lengths than those determined by the ACI 440 equation when the net cover thickness was large (greater than $1.0d_b$). On the other hand, when the net cover thickness was small (equal to or less than $1.0d_b$), the development lengths required by the current equation were larger than those by the ACI equation. The bond stresses were significantly influenced by the cover thicknesses. The current equation results in development lengths that are more economical when the cover thickness is large, and more conservative lengths when the cover thickness is small than the ACI 440 committee equation.

Development of a retrofit anchor system for remodeling of building exteriors

  • Yeun, Kyu Won;Hong, Ki Nam;Kim, Jong
    • Structural Engineering and Mechanics
    • /
    • v.44 no.6
    • /
    • pp.839-856
    • /
    • 2012
  • To enable remodeling of the exterior of buildings more convenient, such finishing materials as curtain walls, metal panels, concrete panels or dry stones need to be easily detached. In this respect, this study proposed a new design of the slab for the purposes. In the new design, the sides of the slab were properly modified, and the capabilities of anchors fixed in the modified slab were experimentally tested. In details, a number of concrete specimens with different sizes and compressive strengths were prepared, and the effect of anchors with different diameters and embedment depths applied in the concrete specimens were tested. The test results of the maximum capacities of the anchors were compared with the number of current design codes and the stress distribution was identified. This study found that the embedment depth specified in the current design code (ACI318-08) should be revised to be more than 1.5 times the edge distance. However, with the steel sheet reinforcement, the experiment acquired higher tensile strength than the design code proposed. In addition, for two types of specimens in the tensile strength experiment, the current design code (ACI 318-08) is overestimated for the anchor depth of 75 mm. This study demonstrated that the ideal breakout failure was attainable for the side slot details of a slab with more than 180 mm of a slab thickness and less than 75 mm of an anchor embedment depth. It is expected that these details of the modified slab can be specified in the upgraded construction design codes.

Investigation of the effects of connectors to enhance bond strength of externally bonded steel plates and CFRP laminates with concrete

  • Jabbar, Ali Sami Abdul;Alam, Md Ashraful;Mustapha, Kamal Nasharuddin
    • Steel and Composite Structures
    • /
    • v.20 no.6
    • /
    • pp.1275-1303
    • /
    • 2016
  • Steel plates and carbon-fiber-reinforced polymer (CFRP) laminates or plates bonded to concrete substrates have been widely used for concrete strengthening. However, this technique cause plate debonding, which makes the strengthening system inefficient. The main objective of this study is to enhance the bond strength of externally bonded steel plates and CFRP laminates to the concrete surface by proposing new embedded adhesive and steel connectors. The effects of these new embedded connectors were investigated through the tests on 36 prism specimens. Parameters such as interfacial shear stress, fracture energy and the maximum strains in plates were also determined in this study and compared with the maximum value of debonding stresses using a relevant failure criterion by means of pullout test. The study indicates that the interfacial bond strength between the externally bonded plates and concrete can be increased remarkably by using these connectors. The investigation verifies that steel connectors increase the shear bond strength by 48% compared to 38% for the adhesive connectors. Thus, steel connectors are more effective than adhesive connectors in increasing shear bond strength. Results also show that the use of double connectors significantly increases interfacial shear stress and decrease debonding failure. Finally, a new proposed formula is modified to predict the maximum bond strength of steel plates and CFRP laminates adhesively glued to concrete in the presence of the embedded connectors.