1 |
American Concrete Institute (2008), "Building code requirements for structural concrete (ACI 318-08) and commentary", ACI Committee 318, American Concrete Institute, 409-438.
|
2 |
American Concrete Institute (1997), "Code requirements for nuclear safety related concrete structures (ACI 349- 97)", ACI Committee 349, American Concrete Institute, 123.
|
3 |
Cook, R.A., Collins, D.M., Klingner, R.E. and Polyzois, D. (1992), "Load-deflection behavior of cast-in-place and retrofit concrete anchors", ACI Struct. J., 89, 639-649.
|
4 |
Delhomme, F. and Debicki, G. (2010), "Numerical modeling of anchor bolts under pullout and relaxation tests", Constr. Buil. Mater., 24, 1232-1238.
DOI
ScienceOn
|
5 |
Delhomme, F., Debicki, G. and Chaib, Z. (2010), "Experimental behaviour of anchor bolts under pullout and laxation tests", Constr. Buil. Mater., 24, 266-274.
DOI
ScienceOn
|
6 |
Fuchs, W., Eligehausen, R. and Breen, J.E. (1995), "Concrete capacity design (CCD) approach for fastening to concrete", ACI Struct. J., 92, 73-94.
|
7 |
Kang, T.K., Ha, S.S. and Choi, D.U. (2010), "Bar pullout tests and seismic tests of small-headed bars in beamcolumn joints", ACI Struct. J., 107, 32-42.
|
8 |
Klingner, R.E. and Mendonca, J.A. (1982), "Tensile capacity of short anchor bolts and welded studs: A literature review", ACI Struct. J., 79F, 270-279.
|
9 |
Lee, N.H., Kim, K.S., Bang, C.J. and Park, K.R. (2007), "Tensile-headed with large diameter and deep embedment in concrete", ACI Struct. J., 104, 479-486.
|
10 |
Hoehler, M.S. and Eligehausen, R. (2008), "Behavior and testing of anchors in simulated seismic cracks", ACI Struct. J., 105, 348-357.
|
11 |
Matthew S. Hoehler and Rolf Eligehausen (2008), "Behavior and testing of anchors in simulated seismic cracks", ACI Struct. J., 105, 348-357.
|
12 |
McMackin, P.J., Slutter, R.G. and Fisher, J.W. (1973), "Headed steel anchors under combined loading", AISC Eng. J., Second Quarter, 43-52.
|
13 |
Ozbolt, J., Eligehausen, R., Periskic, G. and Mayer, U. (2007), "3D FE analysis of anchor bolts with large embedment depths", Constr. Buil. Mater., 74, 168-178.
|
14 |
Peter, J.C., Kurt, W.K. and Jai, B.K. (1996), "Tension test of heavy-duty anchors with embedments of 8 to 19 inches", ACI Struct. J., 93, 360-368.
|
15 |
Primavera, E.J., Pinelli, J.P. and Kalajian, E.H. (1997), "Tensile behavior of cast-in-place and undercut anchors in high-strength concrete", ACI Struct. J., 94, 583-594.
|
16 |
Stone, W.C. and Carion, N.J. (1983), "Deformation and failure in large-scale pullout tests", ACI Struct. J., 80, 501-512.
|
17 |
Yang, K.H. and Ashour, A.F. (2008), "Mechanism analysis for concrete breakout capacity of single anchors in tension", ACI Struct. J., 105, 609-616.
|
18 |
Yener, M. (1994), "Overview and progressive finite element analysis of pullout tests", ACI Struct. J., 91, 49-58.
|
19 |
Yoon, Y.S., Kim, H.S. and Kim, S.Y. (2001), "Assessment of fracture behaviors for CIP anchors fastened to cracked and uncracked concretes", KCI Concrete J., 13, 33-41.
|