• Title/Summary/Keyword: modeling process

Search Result 5,337, Processing Time 0.035 seconds

Modeling, simulation and control strategy for the fuel cell process (모델링 및 전산모사를 통한 연료전지공정의 제어전략에 관한 연구)

  • 이상범;이익형;윤인섭
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.1012-1015
    • /
    • 1996
  • This study focuses on the optimal operation and control strategy of the fuel cell process. The control objective of the Phosphoric Acid Fuel Cell (PAFC) is established and dynamic modeling equations of the entire fuel cell process are formulated as discrete-time type. On-line optimal control of the MIMO system employs the direct decomposition-coordination method. The objective function is modified as the tracking form to enhance the response capability to the load change. The weight factor matrices Q,R, which are design parameters, are readjusted. This control system is compared with LQI method and the results show that the suggested method is better than the traditional method in pressure difference control.

  • PDF

Modeling and Validation of Semantic Constraints for ebXML Business Process Specifications (ebXML 비즈니스 프로세스 명세를 위한 의미 제약의 모델링과 검증)

  • Kim, Jong-Woo;Kim, Hyoung-Do
    • Asia pacific journal of information systems
    • /
    • v.14 no.1
    • /
    • pp.79-100
    • /
    • 2004
  • As a part of ebXML(Electronic Business using eXtensible Markup Language) framework, BPSS(Business Process Specification Schema) has been provided to support the direct specification of the set of elements required to configure a runtime system in order to execute a set of ebXML business transactions. The BPS,' is available in two stand-alone representations, a UML version and an XML version. Due to the limitations of UML notations and XML syntax, however, current ebXML BPSS specification fails to specify formal semantic constraints completely. In this study, we propose a constraint classification scheme for the BPSS specification and describe how to formally represent those semantic constraints using OCL(Object Constraint Language). As a way to validate p Business Process Specification(BPS) with the formal semantic constraints, we suggest a rule-based approach to represent the formal constraints and demonstrate its detailed mechanism for applying the rule-based constraints to the BPS with a prototype implementation.

An Analysis on the Material Removal Mechanism of Chemical-Mechanical Polishing Process Part I: Coupled Integrated Material Removal Modeling (화학-기계적 연마 공정의 물질제거 메커니즘 해석 Part I: 연성 통합 모델링)

  • Seok, Jong-Won;Oh, Seung-Hee;Seok, Jong-Hyuk
    • Journal of the Semiconductor & Display Technology
    • /
    • v.6 no.2 s.19
    • /
    • pp.35-40
    • /
    • 2007
  • An integrated material removal model considering thermal, chemical and contact mechanical effects in CMP process is proposed. These effects are highly coupled together in the current modeling effort. The contact mechanics is employed in the model incorporated with the heat transfer and chemical reaction mechanisms. The mechanical abrasion actions happening due to the mechanical contacts between the wafer and abrasive particles in the slurry and between the wafer and pad asperities cause friction and consequently generate heats, which mainly acts as the heat source accelerating chemical reaction(s) between the wafer and slurry chemical(s). The proposed model may be a help in understanding multi-physical interactions in CMP process occurring among the wafer, pad and various consumables such as slurry.

  • PDF

Statistical Modeling of Pretilt Angle Control using Ion-beam Alignment on Nitrogen Doped Diamond-like Carbon Thin Film

  • Kang, Hee-Jin;Lee, Jung-Hwan;Han, Jung-Min;Yun, Il-Gu;Seo, Dae-Shik
    • Transactions on Electrical and Electronic Materials
    • /
    • v.7 no.6
    • /
    • pp.297-300
    • /
    • 2006
  • The response surface modeling of the pretilt angle control using ion-beam (IB) alignment on nitrogen doped diamond-like carbon (NDLC) thin film layer is investigated. This modeling is used to analyze the variation of the pretilt angle under various process conditions. IB exposure angle and IB exposure time are considered as input factors. The analysis of variance technique is settled to analyze the statistical significance, and effect plots are also investigated to examine the relationships between the process parameters and the response. The model can allow us to reliably predict the pretilt angle with respect to the varying process conditions.

Relationship Between Yield and Cost Considering Repair and Rework for LCD Manufacturing System (LCD생산시스템에서 Repair와 Rework을 고려한 수율과 원가 분석 모델)

  • Ha, Chunghun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.3
    • /
    • pp.364-372
    • /
    • 2007
  • The cost modeling of the LCD manufacturing system with the repair and the rework process is hard to achieve because of it's complex manufacturing process. The technical cost modeling divides each process separately and hierarchically, so it is very useful to calculate the total manufacturing cost of the complex manufacturing system. We applied the method to the complex LCD manufacturing system to obtain more accurate cost model. Yields are the most important control parameters in manufacturing. In this paper, we propose a yield based cost model for the LCD manufacturing system and reveal the relationship between manufacturing yield and cost. Through the model, we can estimate the manufacturing cost on the basis of yields that are control indicators of manufacturing. Some simulations are performed to observe the effects of the yield to the cost, and the results are coincide with the real situation. With the proposed model, we expect to develop some optimization problems for enlarging productivity in the LCD industry.

BIM-based Digital Engineering Modeling Process Proposal for Prefabricated Bridges (BIM 기반 디지털엔지니어링 모델을 활용한 프리팹 교량모델 작성 프로세스)

  • Choi, Jae-Woong;Kim, Hyun-Min;Hong, Sa-Hoon
    • Journal of KIBIM
    • /
    • v.13 no.4
    • /
    • pp.36-44
    • /
    • 2023
  • Recently in Korea, efforts are underway to enhance smart construction by implementing Building Information Modeling (BIM) comprehensively across all sectors of the construction industry. This study focused on the adoption of BIM for prefab bridges currently executed in the industry and It examined the process of creating a BIM-based prefab bridge model that can support production. Additionally, it explored how prefab products made by manufacturers can be integrated with road alignments using BIM technology and how the DfMA (Design for Manufacturing and Assembly) approach, which supports production based on designed information, can be adopted. The process of creating the prefab bridge model aims to shorten production time, reduce costs, and enhance quality by leveraging digital information related to design and manufacturing within the BIM framework

Integrated Architectural Engineering Design Process Using BIM Tools (BIM 도구 활용을 통한 건축공학설계의 프로세스)

  • Kang, Da-Young;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.175-178
    • /
    • 2010
  • Public institutions and owners have been introduced to use Building Information Modeling (BIM) tools. Learning BIM becomes an important factor in design process of undergrad program. The purpose of this study is to demonstrate an integrated architectural engineering design process using BIM tools. BIM education programs are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM to introduce integrated process. An architectural engineering design process needs be based on understanding design, building structure, construction and building services. 3D Modeling helps understanding a building structure and checking environment-friendly element analysis. As a result of this research, new process of design education is proposed under four issues.

  • PDF

Quality Improvement for Crimping Process of Electrical Connector Using FEM Analysis (유한요소해석을 통한 전기 커넥터의 압착 품질 향상)

  • Yin, Z.H.;Park, J.G.;Choi, H.S.;Kim, Y.S.
    • Transactions of Materials Processing
    • /
    • v.18 no.3
    • /
    • pp.229-235
    • /
    • 2009
  • This paper covers finite element simulations to evaluate the terminal crimping process of automobile electrical connector. Crimping is a classical technology process to ensure the electrical and the mechanical link between a wire and a terminal. Numerical modeling of the process is helpful to choose and to optimize the dimensions of the crimping part of the connector. In this paper, we discuss a 2D simulation of the crimping process, using explicit finite element methods (ABAQUS/Explicit) and we compare the results with experimental data from the industrial process of crimping (crimping height, crimping width and compressibility). The explicit method is preferred for the modeling of multi-contact problems, in spite of the quasi-static process of crimping. As compared with CAE analysis, a performance improvement makes certain of the truth of the matter.

A Study on Modeling Automation of Human Engineering Simulation Using Multi Kinect Depth Cameras (여러 대의 키넥트 뎁스 카메라를 이용한 인간공학 시뮬레이션 모델링 자동화에 관한 연구)

  • Jun, Chanmo;Lee, Ju Yeon;Noh, Sang Do
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.1
    • /
    • pp.9-19
    • /
    • 2016
  • Applying human engineering simulation to analyzing work capability and movements of operators during manufacturing is highly demanded. However, difficulty in modeling digital human required for simulation makes engineers to be reluctant to utilize human simulation for their tasks. This paper addresses such problem on human engineering simulation by developing the technology to automatize human modeling with multiple Kinects at different depths. The Kinects enable us to acquire the movements of digital human which are essential data for implementing human engineering simulation. In this paper, we present a system for modeling automation of digital human. Especially, the system provides a way of generating the digital model of workers' movement and position using multiple Kinects which cannot be generated by single Kinect. Lastly, we verify the effects of the developed system in terms of modeling time and accuracy by applying the system to four different scenarios. In conclusion, the proposed system makes it possible to generate the digital human model easily and reduce costs and time for human engineering simulation.

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.