• Title/Summary/Keyword: model analysis

Search Result 58,050, Processing Time 0.063 seconds

development of a model of the exhaust System for the Stress Analysis (응력해석을 위한 배기계 모델 개발)

  • 이장명;박성태;김상호;조규수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.370-376
    • /
    • 1997
  • A Simplified Finite Element Method(FEM) model has been developed for the Exhaust System. For the verification of the usage of the developed model , Natural Frequencies, Mode Shapes and Frequency Response Function have been compared between numerical analysis and experimental result. It shows that the developed numerical model also can be utilized to prove the Stress distribution of the Exhaust System if it can be adopted for the vibration analysis adequately.

  • PDF

Development of a Model of the Exhaust System for the Stress Analysis (응력해석을 위한 배기계 모델 개발)

  • 김상호;이장명;박성태
    • Journal of KSNVE
    • /
    • v.9 no.2
    • /
    • pp.295-301
    • /
    • 1999
  • A Simplified Finite Element Method(FEM) model has been developed for the Exhaust System. For the verification of the usage of the developed model. Natural Frequencies, Mode Shapes and Frequency Response Function have been compared between numerical analysis and experimental result. It shows that the developed numerical model also can be utilized to prove the Stress distribution of the Exhaust System if it can be adopted for the vibration analysis adequately.

  • PDF

Flood Runoff Computation for Mountainous Small Basins using HEC-HMS Model (HEC-HMS 모델을 이용한 산지 소하천유역의 홍수유출량 산정)

  • Chang, In-Soo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.7 no.3
    • /
    • pp.281-288
    • /
    • 2004
  • The objective of this study is to propose a methodology of the flood runoff analysis in steep mountainous basins and the analysis basin is the Jasa valley basin in Chungju city Analyzing the spatial pattern of the rainfall in 1994. 6 30~7.1, the seasonal rainy front was tied up in the whole central district, and the rainfall center was moving from the northern Chungbuk province to the northern Kyongbuk province and caused heavy storm. Analyzing the temporal pattern with the Huff method, the 52.5% of the rainfall was concentrated on the 3rd quartile. Rainfall frequency analysis is accomplished by five distribution types; 2-parameter Lognomal, 3-parameter Lognomal, Pearson Type III, Log-Pearson Type III and Extremal Type I distribution Rainfall-runoff analysis in Jasa valley basin was made using HEC-HMS model. Jasa valley basin was divided into 3 sub-basins and the analysis point was 3 points{A, B and C point) With the rainfall data measured by the 10 minutes, the flood runoff also was calculated by as many minutes. SCS CN model, Clark UH model and Muskingum routing model in HEC-HMS model were used to simulate the runoff volume using selected rainfall event.

  • PDF

A Study on Economic Evaluation of SNG Project using Real Option Valuation Model (실물옵션을 이용한 SNG 사업투자의 경제성 평가 연구)

  • Kang, Seung Jin;Hong, Jin Pyo
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.25 no.3
    • /
    • pp.319-335
    • /
    • 2014
  • This study attempts to suggest an economic analysis model for SNG projects, which can reflect the future uncertainty objectively and applies the real option valuation incorporating the flexible investment decision. Based on this analysis model, net present value and internal rate of return were estimated by using preliminary feasibility study report of SNG project. And economic evaluation of SNG project was performed with real option valuation using binomial option model. Through this, the difference of analysis results between the real option valuation model and the discounted cash flow model were compared and the usefulness of the real option valuation model was confirmed. From the actual proof analysis, it is confirmed that the real option valuation model showed higher SNG project value than the discounted cash flow model did. It was confirmed that by applying the real option valuation model, economic analysis can be performed on not only the current straightforward SNG project, but also various future portfolios having options such as expansion, modification, or decommission.

A Study on 3D CAD/NFEA modeling Interface of A-Type RC Bridge Pylon (A-Type RC 주탑의 3차원 정보모델과 비선형 구조해석모델 생성을 위한 인터페이스 연구)

  • Eom, Ji-Young;Choi, Saem-Lee;Lee, Heon-Min;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.4 no.3
    • /
    • pp.1-9
    • /
    • 2014
  • As BIM application continues to increase in civil engineering, in this study, 3D information model for RC(Reinforced Concrete) bridge pylon was developed and verified its effectiveness at the structural-design stage. To define 3D information model of RC A-Type pylon, characteristics of pylon were analyzed and 3D model structure was constructed. The 3D information model, one of the core product of BIM, manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. Also, this study proposes interface module between input data in structural analysis and 3D model of RC pylon. The module can create the input data for non-linear structural analysis. It is essential to study on method of developing 3D information model and propose a structural analysis model by utilizing 3D model for the effective use of BIM techniques in construction industry. The results of this study can be used as the base data for developing the 3D information model of RC pylon in the structural analysis field.

Generation of the Structural Analysis Model Through the Reconstruction of the Topological Information of the Hull Structural Model (선체 구조 모델의 위상 정보 재구성을 통한 구조 해석 모델 생성)

  • Roh, Myung-Il;Yoo, Seong-Jin;Lee, Kyu-Yeul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.2 s.146
    • /
    • pp.246-257
    • /
    • 2006
  • In the ship building industry, the generation of a structural analysis model, that is, a finite element model of a hull structure, has been manually performed by a designer and thus has required lots of time as compared with that of a mechanical part, because of many constraints, the complexity, and the huge size of the hull structure. To make this task automatic, a generation method of the structural analysis model is proposed through the reconstruction of the topological information of a hull structural model in this study. The applicability of the proposed method is demonstrated by applying it to the generation of the structural analysis model of a deadweight 300,000ton VLCC(Very Large Crude oil Carrier).

Comparative analysis of ONE parameter hydrological model on domestic watershed (ONE 모형의 국내유역 적용 및 비교 분석)

  • Ko, Heemin;An, Hyunuk;Noh, Jaekyung;Lee, Seungjun
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.1
    • /
    • pp.59-72
    • /
    • 2024
  • Agricultural reservoirs supply water for various purposes such as irrigation, maintenance, and living. Since agricultural reservoirs respond sensitively to seasonal and climate changes, it is essential to estimate supply and inflow for efficient operation, and water management should be done based on these data. However, in the case of agricultural reservoirs, the measurement of supply and inflow is relatively insufficient compared to multi-purpose dams, and inflow-supply analysis in agricultural reservoirs through water balance analysis is necessary for efficient water management. Therefore, rainfall-runoff analysis models such as ONE model and Tank model have been developed and used for reservoir water balance analysis, but the applicability analysis for ungauged watersheds is insufficient. The ONE model is designed for daily runoff calculation, and the model has one parameter, which is advantageous for calibration and ungauged watershed analysis. In this study, the water balance was analyzed through the ONE model and the Tank model for 15 watersheds upstream of dams, and R2 and NSE were used to quantitatively compare the performance of the two models. The simulation results show that the ONE model is suitable for predicting the inflow of agricultural reservoirs with the ungauged watershed

Analyses of Fracture Tube Tearing using Gurson Model and Shear Failure Model (Gurson Model과 Shear Failure Model을 이용한 파쇄튜브의 찢어짐 해석)

  • Yang, Seung-Yong;Kwon, Tae-Su;Choi, Won-Mok
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.280-285
    • /
    • 2008
  • Two kinds of failure model, that is, the Gurson model and a shear failure model were used for the finite element analyses of simple and notch tensile specimens and axial compression of a fracture tube with initial saw-cuts. The parameter values for the shear failure model were determined by a combined experimental and numerical analysis of the notch tensile specimens. After fitting the numerical parameters such as the yielding stress and the fracture shear strains, the Gurson model and the shear failure model were applied to the analysis of the fracture tube. Although the Gurson model and the shear failure model showed similar fracture behavior for the case of the tensile specimens, the respective results were different in the axial force and the crack growth rate of the fracture tube. That is, the shear failure model required more axial force to make the cracks propagate along the tube than the Gurson model. These are believed to show the lack of damage evolution process of the shear failure model. To decide which model is better in the tube analysis, experimental verification will be necessary.

Prediction Model on Delivery Time in Display FAB Using Survival Analysis (생존분석을 이용한 디스플레이 FAB의 반송시간 예측모형)

  • Han, Paul;Baek, Jun Geol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.3
    • /
    • pp.283-290
    • /
    • 2014
  • In the flat panel display industry, to meet production target quantities and the deadline of production, the scheduler and dispatching systems are major production management systems which control the order of facility production and the distribution of WIP (Work In Process). Especially the delivery time is a key factor of the dispatching system for the time when a lot can be supplied to the facility. In this paper, we use survival analysis methods to identify main factors of the delivery time and to build the delivery time forecasting model. To select important explanatory variables, the cox proportional hazard model is used to. To make a prediction model, the accelerated failure time (AFT) model was used. Performance comparisons were conducted with two other models, which are the technical statistics model based on transfer history and the linear regression model using same explanatory variables with AFT model. As a result, the mean square error (MSE) criteria, the AFT model decreased by 33.8% compared to the statistics prediction model, decreased by 5.3% compared to the linear regression model. This survival analysis approach is applicable to implementing the delivery time estimator in display manufacturing. And it can contribute to improve the productivity and reliability of production management system.

Application of Water-Quality Management Model for Upstream Basin of Hoengsung Dam (횡성댐 상류유역에 대한 수질관리모형의 적용)

  • Kim, Sang Ho;Lee, Eul Rae
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.2
    • /
    • pp.239-246
    • /
    • 2008
  • In this study, an optimized deterministic water-quality model was constructed to estimate water quality of a river and lake in the upstream basin of a dam. A stochastic water-quality analysis using reliability analysis technique was applied to the model. The model was tested in the 13.9 km reach from Maeil stage station of Kyechun to Hoengsung Dam of Sum River. After finding hydraulic characteristics from nonuniform flow analysis, Broyden-Fletcher-Goldfarb-Shanno (BFGS) optimization technique for model calibration was applied to determine optimum reaction parameters, and model verification was performed based on these. The stochastic model, using Mean First­Order Second­-Moment (MFOSM) and Monte-Carlo methods, was applied to the same reach as the deterministic study. Variations of discharge and water quality in headwater were considered, as well as variations of hydraulic coefficients and reaction coefficients. The statistical results of output variables from MFOSM were similar to those from the Monte-Carlo method. Risk analysis using MFOSM and Monte-Carlo methods presented the probabilities of some locations in the Hoengsung Lake violating existing water-quality standards in terms of DO and BOD.