• Title/Summary/Keyword: mock-up 실험

Search Result 227, Processing Time 0.024 seconds

A Study on Field Application of the Mass Concrete using Hydration Temperature-Reducing Binder - Focused on the Mock-up Test- (수화 온도 저감형 결합재를 이용한 매스콘크리트 현장적용에 관한 연구 -현장 Mock-up Test를 중심으로-)

  • Seo, Il;Kwon, Hae-Won;Park, Hee-Gon;Kim, Yoo-Jin;Kim, Woo-Jae;Lee, Jae-Sam
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.371-372
    • /
    • 2010
  • This study was a result of mock-up test for the field application which was compared between low heat cement and temperature-reducing binder with the way of temperature crack reduction. The result of mock-up test was shown that the heat of hydration from the low heat cement and the temperature-reducing binder indicated 44 and $54^{\circ}C$ respectively.

  • PDF

Design Planning and Evaluation using Mock-up for the Short-term Temporary Housing (단기 임시주거를 위한 설계계획 및 목업을 통한 성능평가)

  • Lee, Won-Hak;Lee, Byung-Yun;Cho, Young-Jun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.609-616
    • /
    • 2019
  • This paper proposes a design plan of short-term temporary housing for the victims by disaster. Also construction workability and residential environment evaluated by mock-up. In particular, in the event of a disaster, victims have lived the auditorium or gymnasium of the nearby school which is an emergency shelter. However, there was a problem of livability. Therefore, it is the purpose of study to provide temporary housing that resides within 30 days. For this purpose, a composite panel with light weight and insulation select to produce mock-up. The mock-up complete in about an hour. This is because it is made only of the composite panels. The composite panels confirm to be easy to load and construct. And mock-up evaluates insulation and waterproofing performance in the laboratory. As a result, Mock-up has insulation and waterproofing performance. This suggests an alternative to short -term temporary housing.

Safety Evaluation of Void Plywood Slab System with form Work Panel (거푸집 패널이 부착된 중공슬래브의 안전성 평가)

  • Hur, Moo-Won;Chae, Kyoung-Hun;Park, Tae-Won;Kang, Hyun-Wook;Park, Hyun-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.6
    • /
    • pp.185-192
    • /
    • 2021
  • In this study, Full-scale hollow slab Mock-up with VPS(Void Plywood Slab System) was produced. Through Mock-up, the safety of the flat plate hollow slab against short-term sagging and long-term sagging is to be evaluated. The hollow rate of the mock-up specimen to which the hollow core slab was applied was designed to be 24%. When loading through concrete blocks, the most central part of the slab was deflection 8.88mm when loading. However, it shows a safe value compared to the reference value (ln/240=17.93mm) for short-term deflection. As a result of 3 months of measurement of the mock-up experiment, the deflection at the center of the slab increased by 6.792mm from the initial deflection. In addition, it was found that the reference value by the load used suggested by KBC2016 was satisfied.

The Mock-Up Test for Applying Rebar Modularization to the Wall of Nuclear Power Plant (원전 벽체구조물의 철근모듈화 적용을 위한 Mock-Up 실험연구)

  • Lee, Byung-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.7-8
    • /
    • 2016
  • We are developing the technology for applying the Rebar Modularization Method to the Nuclear Power Plant Structures. To achieve this, we had developed the elementary technology for applying this method to Nuclear Power Plant Structures efficiently and performed the Mock-Up Test by using the developed elementary technology. By analysing this test result, we deduced the problems and found solutions to solve them.

  • PDF

Experiment on Reduction of Pollutants in Titanium Dioxide Photocatalytic Ventilation System (이산화티탄 광촉매 환기장치의 오염물질 저감 실험)

  • Song, Yong Woo
    • Land and Housing Review
    • /
    • v.13 no.2
    • /
    • pp.117-123
    • /
    • 2022
  • In this study, titanium dioxide photocatalyst was applied to the ventilation system to reduce particulate matter and nitrogen oxides (NOx), which are representative indoor harmful substances. A reaction device capable of installing an ultraviolet lamp was designed and manufactured so that the pollutant decomposition effect of the titanium dioxide photocatalyst identified through previous studies could be applied indoors. The reaction device was used on the indoor ventilation system and applied to the Mock-Up test. As a result of the Mock-up test, the NOx reduction performance according to the change in air volume once per hour and five times per hour was confirmed. As a result, it was confirmed that as the number of ventilation increases, the NOx reduction time decreases proportionally, and the reduction performance increases.

Development and Operation of Durability Mock-Up Test Facilities for Offshore Electricity Structures (해상 전력구조물 내구성 실증 실험장 구축 및 운영)

  • Pang Gi-Sung;Han Sang-Mook;Song Young-Chul;Kwon Byeong-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05b
    • /
    • pp.265-268
    • /
    • 2005
  • This paper discusses a strategy and status for development and operation of durability mock-up test facilities for offshore structures. The strategy is examplified and facilitated using an offshore transmission tower crossing the West sea and the Shihwha lake, which was designed and constructed 345kV T/L lines transmitting power from Yeong-Heung fossil power plant to Seoul metropolitan area. Various data for corrosion protection, aging, life-prediction of concrete and steel offshore structures can be obtained using the proposed mock-up test facility. Acquired data will be used for further research on durability, life-prediction, and retrofit of structures. It is important to maintain the safety of 345 kV Yeong-Heung transmission line crossing the Shihwha lake because the offshore structure is one of the critical electric facilities transmitting large power to the metropolitan area. Operation of the offshore transmission tower mock-up is expected to make a significant contribution to stable power supply.

  • PDF

Mock-up Test on the Reduction of Hydration Heat of Mass Concrete for Transfer Girder (전이보 매스콘크리트의 수화열 저감에 관한 Mock-up 실험)

  • Yoon Seob;Hwang Yin Seong;Baik Byung Hoon;Han Cheon Goo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.707-710
    • /
    • 2004
  • This paper reported the results of mock-up test on mass concrete for transfer girder using setting time difference of super retarding agent(SRA). According to test results, two mock-up structures were made. Plain concrete without placing layer reached maximum temperature after 24hours since placement and caused surface hydration cracks at top section. However, concrete with placing layer reached maximum temperature after 72hours and surface temperature was higher than center temperature, which did not cause surface crack. After form removing, no crack was observed at side surface of plain concrete, while concrete using SRA at mid section had surface scaling and settling crack. According to coring results, concrete with placing layer had a penetration crack from top section to bottom section. Therefore, the setting time difference method to reduce hydration heat will have difficulty in applying the mass concrete for transfer girder.

  • PDF

Mock-up Test of Low Heat Concrete Using High Volume Mineral Admixture (혼화재를 다량 사용한 저발열 콘크리트의 모의부재실험)

  • Kim, Yong-Ro;Song, Young-Chan;Kim, Hyo-Rak;Park, Jong-Ho;Yoo, Jung-Hoon;Jeong, Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.31-34
    • /
    • 2011
  • In this study, for the evaluation of field application of low heat concrete using high volume mineral admixture, the characteristics of hydration heat generation and engineering properties of low heat concrete was investigated by mock-up test according to the replacement ratio of mineral admixture. Also, it was evaluated the compressive strength of low heat concrete with curing temperatures and ages for effective concrete mix design considering seasonal change.

  • PDF

A Study on Concentration Change of Volatile Organic Compounds; VOCs by using Mock-up Test (실물실험을 통한 개별 VOC의 농도변화에 관한 연구)

  • Kim Chang-Nam;Lee Yun-Gyu
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.17 no.5
    • /
    • pp.487-495
    • /
    • 2005
  • Recently, due to the airtightness of buildings or the misuse of building materials, we have been witness SHS (Sick House Syndrome) which can have bad influences on the resident in an existing apartment house as well as newly constructed apartment house start to attract public attention. As a result of this situation, we went to restrict the TVOC (Total Volatile Organic Compound) and formaldehyde. But these guidelines concentrated on only TVOC although TVOC are consist of many individual VOC. Therefore, in this study, we will look about concentration change of VOCs (Volatile Organic Compounds) by using Mock-up test. As result of test, the concentration of four individual VOC (Benzene, Toluene, Ethylbenzene, Styrene) showed quitely low level after 7 days. On the other hand the concentration of Xylene and formaldehyde showed low level after 14 days.