This research deals with a task assignment problem to worker group which consists of one master and one assistant. Each task must be assigned to only one worker group and it is possible to make a pair of each master and each assistant to organize a worker group. A worker group may have more than one task assigned to it, but the workloads of each worker group must be balanced within the allowable range. This problem can be formulated mathematically using the Mixed Integer Programming(MIP), where the objective function is to minimize the total assignment cost. A two phase heuristic algorithm is suggested in order to find approximate solutions. The first phase is to obtain an initial solution, where the initial assignment is performed to follow the workload adjustment. In the second phase, the solution is improved through the repeated process of the exchange and the assignment adjustment. Numerical experiments have been performed to evaluate the performance of the heuristic algorithm.
Journal of the Korean Operations Research and Management Science Society
/
v.17
no.3
/
pp.137-158
/
1992
We study the Multiple Product Single Facility Stockout Avoidance Problem (SAP). That is the problem of determining, given initial inventories, whether there is a multiple product single facility production schedule that avoids stockouts over a given time horizon. The optimization version of the SAP where stockouts are pnelized linearly is also studied. We call this problem the Weighted Stockout Problem (WSP). Both problems are NP-hard in the strong sense. We develop Mixed Integer Linear Programming (MIP) formulations for both the SAP and the WSP. In addition, several heuristic algorithms are presented and performances are tested using computational experiments. We show that there exist polynomial algorithms for some special cases of the SAP and the WSP. We also present a method to phase into a target cyclic schedule for infinite horizon problems. These can be used as a practical scheduling tool for temporarily overloaded facilities or to reschedule production after a disruption.
Lee Youngho;Chang Yongwon;Park Noik;Lee Soonsuk;Kim Youngbu;Cho Kisung
Journal of the Korean Operations Research and Management Science Society
/
v.30
no.1
/
pp.1-15
/
2005
In this paper, we deal with a mesh network design problem arising from the deployment of WDM for the optical internet. The mesh network consists of mesh topology for satisfying traffic demand while minimizing the cost of WDM, OXC, and fiber cables. The problem seeks to find an optimal routing of traffic demands in the network such that the total cost is minimized. We formulate the problem as a mixed-integer programming model and devise a tabu search heuristic procedure. Also we develop an optical internet design system that implements the proposed tabu search heuristic procedure. We demonstrate the computational efficacy of the proposed algorithm, compared with CPLEX 8.0.
Journal of the Korean Operations Research and Management Science Society
/
v.11
no.2
/
pp.1-6
/
1986
Capacitated facility location problems have received a great deal of attention in the past decade, resulting in a proliferation of algorithms for solving them. As is the case with mixed 1-1 integer programming problems, the computational success of such algorithms depends greatly on how to obtain lower bounds in good quality within a resonable time. The objective of this paper is to provide a comparative analysis of those algorithms in terms of lower bounds they produce. Analyses of the strategies for generating lower bounds as well as the quality of generated lower bounds are provided.
Proceedings of the Korea Water Resources Association Conference
/
1993.07a
/
pp.535-543
/
1993
이 논문의 목적은 기존의 상수도 관망을 개선하는데 있어 어느 관을 교체 또는 재생할 것인가와 펌프용량을 얼마나 늘릴 것인가를 결정함으로써 관망내 각 급수지점에서의 요구유량및 수압을 만족시킴은 물론 그에 드는 비용을 최소화시키는 모델을 개발하는데 있다. 이 논문은 관교체 비용, 세관 및 재생 비용, 관보수 비용, 펌핑 비용, 펌프시설 확충비용 등의 다섯가지 비용들을 비교 검토함으로써 의사결정을 하게 된다. 제약조건식으로는 급수 조건식, 에너지 방정식, 수리학적 방정식, 결정 조건식, 한계 조건식, 정수 조건식 등이 있다. 이 모델을 수식화하면 정수혼합 비선형계획법 (mixed-integer nonlinear programming, MINLP) 문제가 된다. 이 문제를 풀기 위해 비선형해법의 GRG (generalized reduced gradient) 방법과 분기와 한계 (banch and bound) 기법을 통한 implicit enumeration 기법을 접목시키는 방법을 제안하였다.
Magazine of the Korean Society of Agricultural Engineers
/
v.42
no.5
/
pp.103-113
/
2000
A decision support system DSS-WQMRA (Decision Support System-Water Quality Management in Rural Area) was developed to help regional planners for the water quality management in a rural basin. The integrated model DSS-WQMRA, written in JAVA, includes four subsystems such as a GIS, a database, water quality simulation models and a decision model. In the system, the GIS deals with landuse and the location of pollutant sources. The database manages each data and supplies input data for various water quality simulation models. the water quality simulation model is composed of the GWLF( Generalized Watershed Loading Function), PCLM(Pollutant Loading Calculation Module) and the WASP5 model. The decision model based on mixed integer programming is designed to determine optimal costs and thus allow the selection of managemental practices to meet the water quality criteria. The methodology was tested with an example application in the Bokha River Basin, Kyunggi Province in Korea. It was proved that the integrated model DSS-WQMRA could be very useful for water quality management including the non-point source pollution in rural areas.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.162-163
/
2016
This paper presents a mathematical model for optimizing earthwork allocation plan that minimizes earthwork cost. The model takes into account operational constraints in the real-world earthwork such as material-type (i.e., quality level of material) and quantities excavated from cut-sections, required quality of material and quantities for each embankment layer, top-down cutting and bottom-up filling constraints, and allocation orders. These constraints are successfully handled by assuming the rock-earth material as the three dimensional (3D) blocks. The study is of value to project scheduler because the model identifies the optimal earth allocation plan (i.e., haul direction (cut and fill pairs), quantities of soil, type of material, and order of allocations) expeditiously and is developed as an automated system for usability. It is also relevant to estimator in that it computes more realistic earthworks costs estimation. The economic impact and validity of the mathematical model was confirmed by performing test cases.
This paper presents a Case-Sort method to solve the unit commitment problem using database in electric power systems. The formulation of the unit commitment may be described as nonlinear mixed integer programming. However, it is hard to optimize a problem with discrete and continuous variables in a large-scale system at the same time. The Case-Sort method is based on the unit [MW] generation cost considered drive hour. Then, this paper shows effectiveness and economical efficiency of the proposed algorithm.
Proceedings of the Korean Operations and Management Science Society Conference
/
2002.05a
/
pp.426-433
/
2002
This paper deals with an offline routing problem, which can be used as an explicit routing procedure in MPLS(Multiprotocol Label Switching) network, for traffic engineering. This problem is formulated as an MIP(Mixed Integer Programming) with the objective function which is to minimize the sum of the maximum link utilization for load balancing (link utilization) and the routing cost. Constraints arc composed of link capacity restriction and demand requirement that has origin-destination pair, bandwidth requirement and hop restriction. The problem is proved to be NP-hard so that the Lagrangean relaxation method is applied to propose a Lagrangean heuristic. To test the effectiveness & efficiency of the proposed algorithm, computational experiments are performed with numerical instances. The experiment results show that the proposed algorithm solves the problem within a reasonable time.
Proceedings of the Korean Operations and Management Science Society Conference
/
2002.05a
/
pp.734-741
/
2002
The importance of efficient Supply Chain Management is increasing in accordance with recent industrial environment, such as globalization of business, complexity and diversity of company's management structure, and variety of customer's demand. In a rapidly changed environment of business, quick and efficient decision making is the important matter to the survival of the company. The purpose of this study supports decision making for efficient supply chain management. In this study, we consider simultaneously and mutually reflecting the preference of each constituent (Supplier, Manufacturing plant, Distribution center, Customer) on supply chain network, and decide company's strategic choice and coordinated production/distribution models of company. The Analytical Hierarchy Process is used for decision making of qualitative and quantitative elements. We use the results of AHP as inputs and propose mathematical models thru Mixed Integer Programming.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.