• Title/Summary/Keyword: metro train

Search Result 155, Processing Time 0.024 seconds

Emergency Evacuation Scenario Study of Urban Metro Vehicle Running on Elevated Guideway (도시철도차량의 고가선로 비상대피 시나리오 분석)

  • Kim, Young-Sang;Maeng, Hee-Young;Wang, Jong-Bae
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.3
    • /
    • pp.117-124
    • /
    • 2012
  • There have been recently introduced new types of urban metro vehicles called LRT (Light Rail Transit) running on elevated guideway such as Uijeongbu VAL(which stands for V$\acute{e}$hicule Automatique L$\acute{e}$ger: Automatic Light Rail Vehicle) system, Yong-In LIM(Linear Induction Motor) system, Incheon international airport MAGLEV(Magnetic Levitated Vehicle) system and Daegu monorail system. Most of accidents by the vehicles are bound to happen on elevated guideway. Therefore, it is of vital importance to analyze hazards related to vehicles running on elevated guideway and study emergency evacuation scenarios applicable in case of accidents on elevated guideway so as to secure the safety of the new types of urban metro vehicles. In this study, FTA(Fault Tree Analysis) model was developed to identify all possible hazards, and all possible evacuation scenarios were studied. It was also confirmed that each hazard can be corresponded to one or more evacuation scenarios. This result shows that passengers can be evacuated according to one of the scenarios identified in this study in case of an accident of "Train Stranded on Elevated Guideway".

A Study on the 'Work-Life Balance' of Metro Drivers : Exploration of Precedence and Antecedence (도시철도기관사의'일과 삶의 균형'에 관한 연구 : 선행변인과 후행변인의 탐색)

  • Kim, Jung Gon;Shin, Tack Hyun;Sin, Jun-U;Berdiyev, Alisher
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.65-79
    • /
    • 2015
  • This study intended to investigate exploratorily the precedent factors affecting two types of perceived balances between work and life(family/leisure) and the antecedent ones affected by them, focusing on the metro train drivers. To attain this purpose, literature survey on the precedent factors, work-life balance, and antecedent factors was performed, and the study model was designed based on this survey, and then this model was analyzed empirically using Multiple-Regression. The results on the precedent factors showed that Job Demand, Self-Efficacy, and Age have significant effects on the negative transfer of work. On the other hand, it was shown that Affiliative Culture, Self-Efficacy, and Internal Locus of Control have significant effects on the family centered balance. And the results on the antecedent factors showed that family centered balance has significant effects on Job Satisfaction, Psychological Depression and Fatigue, Safety Behavior, and accident, and the negative transfer of work has significant effects on Physical and Psychological Depression and Fatigue, Emergency Stress, and Safety Behavior.

A Study on Improvement of Seoul Metro Line 9 Focusing on Marketing and Operating (영업 및 운전 중심의 서울 지하철 9호선 개선 방안 연구)

  • Park, Jeong-Soo;Han, Woo-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.482-488
    • /
    • 2008
  • Seoul Metro Line 9 (SML9) will link Gimpo Airport to the Gangnam district opening in May 2009. SML9 has a new model in Korea constructed by metropolitan government and private company and operated by specialized public transportation service provider. SML9 is confronted with tough environment of stagnated public transportation and strong competitor, Olympic city expressway. Consequently SML9 must lead the maximum efficiency by using its material and human resource. Hereupon, I propose renovation plans from 3 viewpoints of operation field of SML9: Rapid-Local combination, close connection with other transportation and direct connecting service into Incheon Air-port Railroad(AREX).

A Numerical Study of Ventilation System Operation for Smoke Control in a Subway Station when a Train under Fire is Approaching (화재열차가 진입하여 정차하는 지하철 역사에서 제연을 위한 환기장치 운전에 대한 수치해석 연구)

  • Lee, Seung-Ho;Hur, Nahm-Keon;Cha, Chul-Hyun;Ryou, Hong-Sun;Kim, Dong-Hyeon;Jang, Yong-Jun
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.136-141
    • /
    • 2009
  • The platform screen door(PSD) is installed in the station of the Seoul Metro 9th line for passengers' safety and comfortable environment of the station. The track way exhaust system(TES) is also operated with PSD to exhaust heat released from train. TES can also be used for the purpose of the heat and smoke control in an emergency case of the carriage fire. When the fire is occurred, operation of TES is switched to the smoke exhaust mode form its normal ventilation mode. In the present study, a subway station of Seoul Metro 9th line is modeled, and a 3-D CFD simulation is performed to investigate effectiveness of designed TES in case of fire. A scenario that a train under fire is arriving the station is simulated for several possible operation modes of the TES using moving mesh technique. As a result, temperature and CO concentration distribution in the station is obtained for each operation modes of TES. The effectiveness of TES operation in case of fire is also discussed.

  • PDF

Study for Application of High Speed R-bar System in Metro Express Railway Tunnel (광역급행철도 터널에 고속 R-bar 적용에 관한 연구)

  • Ahn, Young-Hoon;Song, Jin-Ho;Kim, Si-Gu
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.409-412
    • /
    • 2011
  • Maximum speed of the train could not exceed over 160km/h with R-bar system in the underground type tunnel structure. By the research to overcome this speed limit, maximum speed has reached up to 200~250km/h recently by new R-bar system. It is under discussion to construct Metro Express Line between Gyonggido and Seoul which requires maximum speed 180km/h~230km/h. New R-bar is an optimal system to achieve the speed improvement in this line. This study shows application of the high speed R-bar system in the underground tunnel section.

  • PDF

The Study about Development and Consideration of Urban Railroad Vehicle Propulsion Control Device (도시철도차량 추진제어시스템 고찰 및 개선에 대한 연구)

  • Lee, Mi-Jeong;Lee, Hyeong-Woo;Ha, Jong-Eun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2323-2328
    • /
    • 2011
  • There have been many changes in Subway train types since SeoulMetro opened the Line No.1 in 1974. Propulsion control device has changed many times following the generations of control method from resistance control method which uses large resistor for the traction motor control to chopping control which uses power semiconductors and finally to inverter control. Railroad vehicle propulsion control device refers to devices such as converter/inverter which supply power for subway operation, power conversion equipment like small switching-mode power supply and traction motor. In this paper, we will analyze every part of railroad vehicle propulsion control device of SeoulMetro so we can find problems in the subway operation. And we will present propulsion control device model which makes minimized failures, efficient maintenance possible when replacing railroad vehicle later. By doing this, we hope to ensure stability and improve energy efficiency to the top.

  • PDF

A Study on the Successful Factors in the Application of RIMS Project for the Safe Operation of Rolling Stocks in the Public Transportation (공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용의 성공요인 연구)

  • Lee, Kang-Won;Bhang, Youn-Keun;Son, Young-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.555-560
    • /
    • 2006
  • This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.

The Reduction Case of Occurrence of Abnormal Wearing of Rail in Compound Curve Part (복심곡선 레일이상마모 발생 저감 사례)

  • Kim, Wan-Sool
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1097-1106
    • /
    • 2007
  • Rail provides running tract for train and broadly and widely conveys the weight of the train exerted from the train wheels that the rail directly supports onto the cross tie and roadbed, and supports the cross-sectional pressure exerted by centrifugal force at curvatures. That is, stationary rail provides surface on which dynamic train runs and guarantees cross-sectional resistance to enable the vertical snake motion of the train wheels as well as to maintain lateral force at curvatures. Rail provides running surface on which train wheels can run smoothly, and secures vertical and lateral force. However, it undergoes continuous destructive reactions (wearing and damages) and abrasion of the cladding by the train wheels. It is obvious that wearing will result when two metal parts act against each other. However, occurrence of abnormal wearing such as rapid wearing of the rail side due to complex generation of various mechanisms at the contact surface between the rail and train wheel flange. It is not easy to simply examine the causes of occurrence of abnormal wearing of rail and train wheel flange. Although countless number of academicians and specialists are conducting researches on abnormal wearing of rail and vertical wearing of train wheels, I believe it is too early to argue on pros and cons due to insufficiency of officially verified information on the issue. This review will be focusing on the examples of repairs that reduced the generation of abnormal wearing of rail by reviewing and improving characteristics of wearing and slack, speed of the train and cant as well as status of lubricator by choosing the compound curves present in the section between the $Anguk{\sim}Jongno3-ga$ Stations of the Route No. 3 among the compound curve tracks of the Seoul Metro Routes No. 3 & 4 at which abnormal wearing is generated continuously.

  • PDF

Estimation of Mass Rapid Transit Passenger's Train Choice Using a Mixture Distribution Analysis (통행시간 기반 혼합분포모형 분석을 통한 도시철도 승객의 급행 탑승 여부 추정 연구)

  • Jang, Jinwon;Yoon, Hosang;Park, Dongjoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.5
    • /
    • pp.1-17
    • /
    • 2021
  • Identifying the exact train and the type of train boarded by passengers is practically cumbersome. Previous studies identified the trains boarded by each passenger by matching the Automated Fare Collection (AFC) data and the train schedule diagram. However, this approach has been shown to be inefficient as the exact train boarded by a considerable number of passengers cannot be accurately determined. In this study, we demonstrate that the AFC data - diagram matching technique could not estimate 28% of the train type selected by passengers using the Seoul Metro line no.9. To obtain more accurate results, this paper developed a two-step method for estimating the train type boarded by passengers by applying the AFC data - diagram matching method followed by a mixture distribution analysis. As a result of the analysis, we derived reasonable express train use/non-use passenger classification points based on 298 origin-destination pairs that satisfied the verification criteria of this study.

Prevention of the Malfunction of the ATS Signaling System by Parallel Operation with ATC (철도신호시스템 병행운전(ATS/ATC)에 따른 ATS신호기 오동작개선)

  • Jeong, Rag-Gyo;Kim, Baek-Hyun;Kang, Seok-Won;Park, Geon-Won
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.7
    • /
    • pp.1019-1025
    • /
    • 2015
  • The performance requirements on the safety-based functionality of railway signal systems have been reinforced and the effort for enhancement of the existing system or development of the new system is being accordingly made. In particular, various technical researches on replacement or improvement of the existing ATS(Automatic Train Stop) signaling system are now in progress for better operational efficiency. In this study, the complementary points for improvement or replacement of the currently used system(i.e., ATS) will be derived in terms of operating efficiency in an integrated operating environment with the newly introduced system(e.g., ATC: Automatic Train Control). This study can contribute to derive the need for improvement of the signaling system by checking the interface problems and comparing between different systems through the analysis of real operation cases in the field. Eventually, this analysis can be applied to prevent and estimate the collision accidents can be caused by the failure of the signaling system in advance. In addition, the results can be used to provide a future direction to secure the reliability in the parallel operation by integration based on different railway signaling systems.