• Title/Summary/Keyword: method of unit rate

Search Result 843, Processing Time 0.033 seconds

A Novel Driving Method for Cost Competitive a-Si TFT-LCD

  • Moon, Su-Hwan;Lim, Hong-Youl;Kim, Dae-Kyu;Lee, Min-Kyung;Ko, Kyung-Tai;Lee, Jun-Ho;Yoon, Sung-Hoe;Kim, Byeong-Koo
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2009.10a
    • /
    • pp.470-473
    • /
    • 2009
  • We have developed a novel driving method, Six times Rate Driving(SRD) for the purpose of making cost competitive TFT-LCD. By applying SRD method to an a-Si TFT-LCD, the driving rate was increased six times as it was named but the number of data lines and so its D-Ics were reduced to one sixth of the conventional one which resulted in the cost saving of that much. We also newly designed the gate driver in order to avoid any expansion of the bezel width caused by applying SRD. Our newly developed driving technology, SRD was successfully applied to 7.0-inch WSVGA (1024 ${\times}$ 600) TFT-LCD which can be driven with only one data D-IC and here introduced.

  • PDF

Largest Coding Unit Level Rate Control Algorithm for Hierarchical Video Coding in HEVC

  • Yoon, Yeo-Jin;Kim, Hoon;Baek, Seung-Jin;Ko, Sung-Jea
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.1 no.3
    • /
    • pp.171-181
    • /
    • 2012
  • In the new video coding standard, called high efficiency video coding (HEVC), the coding unit (CU) is adopted as a basic unit of a coded block structure. Therefore, the rate control (RC) methods of H.264/AVC, whose basic unit is a macroblock, cannot be applied directly to HEVC. This paper proposes the largest CU (LCU) level RC method for hierarchical video coding in a HEVC. In the proposed method, the effective bit allocation is performed first based on the hierarchical structure, and the quantization parameters (QP) are then determined using the Cauchy density based rate-quantization (RQ) model. A novel method based on the linear rate model is introduced to estimate the parameters of the Cauchy density based RQ model precisely. The experimental results show that the proposed RC method not only controls the bitrate accurately, but also generates a constant number of bits per second with less degradation of the decoded picture quality than with the fixed QP coding and latest RC method for HEVC.

  • PDF

A Method of Evaluating Profitability and Risk of Multiple Investments Applying Internal Rate of Return

  • Mizumachi, Tadahiro
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.2
    • /
    • pp.121-130
    • /
    • 2010
  • In today's uncertain economic environment, economic risk is inherent in making large investments on manufacturing facilities. It is, therefore, practically meaningful to divide investment over multiple periods, reducing the risk of investment. Then, the cash-flow over the entire planning horizon would comprise positive inflow and negative outflow. In this case, in general, evaluation by internal rate of return (IRR) is not feasible, because multiple IRRs are involved. This paper deals with a problem of evaluating profitability, as well as risk, of investment alternatives made in multiple times of investment over the entire horizon. Typically, an additional investment is required after the initial one, for expanding manufacturing capacity or other reasons. The paper pays attention to a unit cash-flow over two periods, decomposing the total cash-flow into a series of unit cash-flow patterns. It is easy to evaluate profitability of a unit cash-flow by using IRR. The total cash-flow can be decomposed into the series of two types of unit cash-flows: an investment type one (negative-positive) and the borrowing type one (positive-negative). This paper, therefore, proposes a method in which only the borrowing type unit cash-flow is eliminated in the series by converting total cash-flow using capital interest rate. Then, a unique IRR can be obtained and the profitability is evaluated. Thus, the paper extends the method of IRR so that it may help decision making in complicated cash-flow pattern observed in practice.

Determination of Optimal Unit Hydrographs and Infiltration Rate Functions at the site of the Su-Jik Bridge in the HwangGuJichen River (황구지천 수직교 지점에서의 최적 단위도 및 침투율의 결정)

  • Ahn, Taejin;Cho, Byung Doon;Lyu, Heui Jeong
    • Journal of Wetlands Research
    • /
    • v.7 no.3
    • /
    • pp.57-66
    • /
    • 2005
  • This paper is to present the determination of the optimal loss rate parameters and unit hydrographs from the observed single rainfall-runoff event using optimization model. The linear program models has been formulated to derive the optimal unit hydrographs and loss rate parameters for the site of the Su-Jik Bridge in the HwangGuJichen River; one minimizes the summation of the absolute residual between predicted and observed runoff ordinates. In the perturbation stage of parameters the trial and error method has been adopted to determine the loss rate parameters for Kostiakov's, Philip's, Horton's, and Green-Ampt's equation. The unique unit hydrograph ordinates for a given rainfall-runoff event is exclusively obtained with ${\Phi}$ index, but unit hydrograph ordinates depend upon the parameters for each loss rate equations. In this paper the single rainfall-runoff event observed from the sample watershed is considered to test the proposed method. The optimal unit hydrograph obtained by the optimization model has smaller deviations than the ones by the conventional method.

  • PDF

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

Optimization of Shroud Shape and Fan Location for Increasing Exhaust Flow Rate of Air Conditioner Outdoor Unit (실외기 토출 유량 증대를 위한 Shroud 형상 및 휀 위치 최적 설계)

  • Ryu, Ki-Jung;Kim, Yoo-Yil;Lee, Kwan-Soo;Cha, Woo-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.11
    • /
    • pp.599-605
    • /
    • 2009
  • This paper presents a numerical evaluation of the flow rate of air conditioner outdoor unit by investigating the effects of fan location and shroud shape. To determine optimal design parameters, we investigated the exhaust flow rate by changing shroud height, fan height, fan guide height, and fan width. The 3rd order central composite design was performed to select three most important parameters affecting the exhaust flow rate. According to the result of response surface method, the exhaust flow rate of the optimum model increased by 6.25% compared to that of the base model.

A method for feeding flow rate control by measuring weight (무게 측정에 의한 원료 정량 투입 제어 방법)

  • 권오정;황일영;이광순
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.937-940
    • /
    • 1992
  • A cost-saving feeding rate contro method for a batch reaction process is proposed by reconfigurating the flow rate control loop where the feeding rate is estimated by differentiating weight measurement. While the existing control methods require either a flow rate measurement device or a flow rate estimator, the proposed method is devised not to require neither of these facilities by directly controlling the tank weight with a time-varying set point. Experimental evaluation in a pilot-scale unit shows that the proposed method can significantly reduce the actuator hunting of the existing method where the flow rate is estimated by differentiating the weight measurement.

  • PDF

Test Method for Particle Removal Characteristic of Equipment Fan Filter Unit (EFFU) (Equipment Fan Filter Unit (EFFU)의 Particle 제거 성능평가 방법)

  • Lee, Yang-Woo;Ahn, Kang-Ho
    • Journal of the Semiconductor & Display Technology
    • /
    • v.11 no.2
    • /
    • pp.59-62
    • /
    • 2012
  • This test method covers a procedure for measuring particle removal characteristic of equipment fan filter unit(EFFU) installed inside of semiconductor process equipments, FPD manufacturing equipments and so on. Since EFFU is a combination of air filter and the assembly of fan, motor and frame, the integrity of these parts is very important for the performance of EFFU. So a conventional particle removal test method for air filters is not suitable for EFFU particle removal performance. This test method defines an evaluation method for EFFU which is installed inside an enclosed space to remove particles that are generated inside process equipment. The particle removal performance of EFFUs is usually depending on the performance of filter media and air flow rate. To understand a performance of an EFFU, the filter media characteristic, air flow rate and the integrity of EFFU parts should be considered simultaneously. This test method is intended to demonstrate the system performance of an EFFU and successfully evaluated EFFU performance characteristics.

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

Optimization of design parameters on the shroud of air conditioner outdoor unit (실외기 shroud 형상 최적 설계)

  • Ryu, Ki-Jung;Ye, Huee-Youl;Lee, Sang-Bong;Lee, Kwan-Soo;Cha, Woo-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.453-458
    • /
    • 2009
  • This paper presents a numerical evaluation of the flow rate of air conditioner outdoor unit as function of shroud design parameters. To determine the optimal design parameters, we investigated the flow rate by changing bell mouth height, fan height, fan guide height, fan width. The evaluation of the relative priority of the design parameters was performed to choose three important parameters in order to use a response surface method. The flow rate of the optimum model, compared to that of the base model, was increased by about 6.25%.

  • PDF