• Title/Summary/Keyword: measurement site

Search Result 1,437, Processing Time 0.033 seconds

Analysis of Peripheral Surface Settlement during Subway Excavation (지하철 굴착공사에 따른 인접지반의 침하 해석)

  • 문준석;권강오;김홍석;장연수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.621-628
    • /
    • 2000
  • In this study, the influence of groundwater variation and surface settlement adjacent to the excavation site of subway station on $\bigcirc$$\bigcirc$ Gas station and the $\bigcirc$$\bigcirc$ building is analized. Measurement data of surface settlement, horizontal deformation and groundwater level are used to verify the results of Caspe analytical method and FLAC numerical analysis. Variation of groundwater level adjacent to the excavation site is modelled by the 3-D groundwater flow program, MODFLOW. The results of both the analytical method and the numerical method were quite close to the measurement data of surface settlement.

  • PDF

Partial Discharge Detection on Site GIS Using UHF Technique (GIS 부분방전 검출을 위한 UHF 신호측정법 현장 적용)

  • Yoon, Jin-Yeol;Park, Ki-Jun;Goo, Sun-geun;Jo, Sung-Hoon;Han, Sang-Ok
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.1915-1917
    • /
    • 2000
  • Laboratory experiments and on site measurements were conducted to detect partial discharges in GIS(Gas Insulated Switchgear) using the UHF(Ultra High Frequency) technique that has been applied many places in the world. Experimental results were in good agreement with calculation in locating a partial discharge source using mock-up GIS. Defect type and its location were inferred after a measurement on 345 kV GIS that showed some abnormal phenomenon. Precise examination inside the GIS coincided with the results inferred from the measurement. High reliability of UHF technique for site application was confirmed.

  • PDF

Minimum detectable activity of plastic scintillator for in-situ beta measurement system in ground water

  • Choi, Woo Nyun;Lee, UkJae;Bae, Jun Woo;Kim, Hee Reyoung
    • Nuclear Engineering and Technology
    • /
    • v.51 no.4
    • /
    • pp.1169-1175
    • /
    • 2019
  • The minimum detectable activity (MDA) value was derived according to the flow rate of the sample and degree of amplification of the device by sending the sample directly from the collection site to the detection part through a pump. This method can lead to reduction in time and cost compared to the existing measurement method that uses a pre-treatment process. In this study, experiments were conducted on $^3H$ and $^{90}Sr$, which are the major pure beta-emitting radionuclides, by setting the sample flow rate and the amplification gain as factors. The MDA values were derived according to the flow rates, considering that the flow rate can affect the MDA values. There were no change in the MDA under different flow rates of 0, 600, 800, and 1000 mL/min. Therefore, it was confirmed that the flow rate may not be considered when collecting samples for monitoring in actual field. As the degree of amplification of the amplifier increased, the time required to reach the target MDA decreased. When the amplification was quadrupled, the detection efficiency increased by approximately 23.4 times, and the time to reach the MDA decreased to approximately 1/550 times. This method offers the advantage of real-time on-site monitoring.

Pulse Waveform Simulation of Partial Discharges for HV XLPE Cable Joints (초고압 XLPE 케이블 접속함의 부분방전 펄스파형 시뮬레이션)

  • Kim, Jeong-Tae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.1
    • /
    • pp.75-81
    • /
    • 2018
  • In this study, the simulation of partial discharge pulse waveform have been performed for the typical joints such as EBA and PMJ in the HV underground transmission XLPE cable system in order to improve the understanding of partial discharge pulse waveform and the on-site measurement accuracy of partial discharges. FDTD simulation technique was adopted for the simulation and has been shown to be suitable for partial discharge simulation of power cables in terms of pulse propagation characteristics and waveform formation. The simulation results for the EBA showed that the second not-so-large opposite polarity peak appeared after the first negative polarity peak and the measurement sensitivity was the highest near the bottom of the EBA copper box. In the analysis results for PMJ, the magnitude of the second opposite polarity peak was large enough to compare with the first peak, and the measurement sensitivity at the end of the PMJ copper box was the highest. These simulation results show considerable similarity with the on-site measurement, and it would be very useful for the partial discharge measurement of HV XLPE cable systems.

Experimental Study on Temperature Dependence of Nitrate Sensing using an ISE-based On-site Water Monitoring System

  • Jung, Dae-Hyun;Kim, Dong-Wook;Cho, Woo Jae;Kim, Hak-Jin
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2017.04a
    • /
    • pp.122-122
    • /
    • 2017
  • Recently, environmental problems have become an area of growing interests. In-situ monitoring of water quality is fundamental to most environmental applications. The accurate measurement of nitrate concentrations is fundamental to understanding biogeochemistry in aquatic ecosystems. Several studies have reported that one of the most feasible methods to measure nitrate concentration is the use of Ion Selective-electrodes (ISEs). The ISE application to water monitoring has several advantages, such as direct measurement methodology, high sensitivity, wide measurement range, low cost, and portability. However, the ISE methods may yield inconsistent results where there was a difference in temperature between the calibration and measurement solutions, which is associated with the temperature dependence of ionic activity coefficients in solution. In this study, to investigate the potential of using the combination of a temperature sensor and nitrate ISEs for minimizing the effect of temperature on real-time nitrate sensing in natural water, a prototype of on-site water monitoring system was built, mainly consisting of a sensor chamber, an array of 3 ISEs, an waterproof temperature sensor, an automatic sampling system, and an arduino MCU board. The analog signals of ISEs were obtained using the second-order Sallen-key filter for performing voltage following, differential amplification, and low pass filtering. The performance test of the developed water nitrate sensing system was conducted in a monitoring station of drinking water located in Jeongseon, Kangwon. A temperature compensation method based on two-point normalization was proposed, which incorporated the determination of temperature coefficient values using regression equations relating solution temperature and electrode signal determined in our previous studies.

  • PDF

Prediction for Measurement Range of Vibration due to Blasting of Underground Tunneling (발파 진동으로 인한 지표면 진동 계측 범위 산정에 대한 연구)

  • Kong, Suk-Min;Byun, Yoseph;Choi, Sang-Il;Kim, Jeong-Heum;Kim, Chang-Yong;Lee, Seong-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.7-17
    • /
    • 2024
  • Vibrations were measured at the surface of a GTX-A site to assess the impact of blasting on underground tunneling. A numerical analysis was conducted using the same ground and blast conditions as those at the site, accompanied by a comparative analysis of other GTX-A sites. This analysis determined the maximum vibration velocity at regular intervals directly above the blasting point at each site. The results were compared with domestic and international vibration standards to establish the vibration measurement range. The specified vibration measurement locations in domestic regulations—"measuring from the closest part of the structure's foundation to the blasting source, and if conditions make it impossible, measuring from the nearest surface to it"—were evaluated. Furthermore, this study underscores the significance of considering the tunnel drilling depth and soil conditions when selecting a vibration measurement location.

Basic Study on the Measurement of Unit Productivity Data By Image Processing Technology (이미지 프로세싱을 활용한 생산성 정보 측정방안에 관한 연구)

  • Lee, Chan-Kyu;Lee, Seung-Hyun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.281-282
    • /
    • 2012
  • Construction performance and productivity improvement are key focus areas in construction industry for any nation. There have been frequent delays and cost overruns in construction projects and poor productivity is one of the major contributions. For this reasons, there have been many research studies performed on the improvement of construction productivity for several decades. However, measuring productivity on a construction job site is still not an easy work. Because collecting reliable data consistently from the job site requires a lot of personnel efforts causing extra time and cost. This paper provides a basic study on the application of image processing technology for measuring unit productivity. It presented the possibility of unit productivity measurement by image processing technology through case study.

  • PDF

A Study on the Units of Measuring Scale in Hwangnyongsa Temple Planning (황룡사 가람계획 척도 연구)

  • Kim, Sookyung
    • Journal of architectural history
    • /
    • v.25 no.4
    • /
    • pp.65-73
    • /
    • 2016
  • This paper aimed to identify the units of measuring scale in Hwangnyongsa temple planning with the published excavation survey reports. Hwangyongsa temple site was planned under Silla Capital's urban planning in 6~7C, its full size was $800{\times}800$, and main temple was $400{\times}515$ of Goguryeo's system of measurement. Main hall was located in the center of Hwangnyongsa temple site, and its location could be seen that there was the arrangement of main temple divided into 3 : 2. Building plan measuring units proved to be 351~356mm and 294~ 296mm by analyzing measured data of remains. Lecture hall and Wooden pagoda were rebuilt by using the ancestors' units of measuring scale again and Bell hall was not planned by Tang's system of measurement in middle of 8C. In this respect, it would be important to have a deliberate attitude and lay down stereotypes on research of the units of measuring scale in ancient architecture.

Performance Monitoring and Load Analysis of Wind Turbine (풍력발전기의 성능 모니터링 및 하중분석)

  • Bae, Jae-Sung;Kim, Sung-One;Youn, Joung-Eun;Kyung, Nam-Ho
    • 유체기계공업학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.385-389
    • /
    • 2004
  • Test facilities for the wind turbine performance monitoring and mechanical load measurements are installed in Vestas 100 kW wind turbine in Wollyong test site, Jeju island. The monitoring system consists of Garrad-Hassan T-MON system, telemetry system for blade load measurement, various sensors such as anemometer, wind vane, strain gauge, power meter, and etc. The experimental procedure for the measurement of wind turbine loads, such as edgewise(lead-lag) bending moment, flapwise bending moment, and tower base bending moment, has been established. Strain gauges are on-site calibrated against load cell prior to monitoring the wind turbine loads. Using the established monitoring system, the wind turbine is remotely monitored. From the measured load data, the load analysis has been performed to obtain the load power spectral density and the fatigue load spectra of the wind turbine.

  • PDF

Antenna Factor Calibration by Standard Antenna Method at Open Area Test Site (야외 시험장에서 표준안테나법에 의한 안테나인자 교정)

  • 신진국;김정환;박정일
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.24 no.8B
    • /
    • pp.1456-1463
    • /
    • 1999
  • This paper describes the measurement system of antenna factor using standard antenna method in OATS(Open Area Test Site) of KRISS(Korea Research Institute of Standards and Science) and methods for reducing an environmental noise affecting antenna factor. The range of measurement frequency is 30 - 1000 MHz, all control and data acquisition were done by computer automatically. Measurement results of antenna factors are presented, total uncertainty of antenna factor is $\pm$1 dB.

  • PDF