• Title/Summary/Keyword: measurement site

Search Result 1,426, Processing Time 0.034 seconds

Real Time Monitoring and Simulation System (RTMASS) for Tak Flux Measurement Site, Thailand (태국 Tak 플럭스 관측소의 실시간 자료 감시 및 모사 시스템)

  • Wonsik Kim;Hyungjun Kim;Joon Kim;Yasushi Agata;Shin Miyazaki;Taikan Oki
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.5 no.2
    • /
    • pp.116-127
    • /
    • 2003
  • The Tak flux measurement (TFM) site, one of the sites of Korean Flux Network (KoFlux) which is an infrastructure of AsiaFlux, is constructed at a northwest of Thailand. The eddy covariance technique is used for measuring energy, water and carbon dioxide ($CO_2$) fluxes, and a real time monitoring and simulation system (RTMASS) developed for data acquisition and processing. The RTMASS is the core structure of the KoFlux-data information system (KoFlux-DIS) and consisted of a remote and a local system. Data acquisition and transmission, and data storage, processing and publishing are functions of those systems, respectively. As primary results about the characteristics of mean flow and turbulence analysis, TFM is a proper site to measure and analyze the various fluxes and those budgets on tropical deciduous forest.

A Study Examining the Measurement of Construction Working Environment and the Target Analysis of Special Health Check for Site Workers - Based on the Analysis of Harmful Factors at Work Site - (건축공사의 공종별 유해요인 분석에 따른 작업환경측정 및 특수건강 진단 대상 분석에 관한 연구)

  • Son, Seo-Hyeong
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.386-394
    • /
    • 2022
  • Purpose: This thesis is to measure construction working environment and to improve health protection of site workers, who are required to take special health check, by analyzing harmful factors that are occurred by each site operation. Method: This thesis explicates the analysis of harmful factors per the operation at construction site, the target of working environment measurement with examined harmful factors, and the variables of special health check. Result: This thesis figures out the target of working environment measurement and the variables of special health check through the analysis of harmful factors per the operation from 12 construction projects. Conclusion: This This thesis is expected to be an instrument for preventing construction site workers from occupational disease, by regular execution of measuring working environment via harmful factors of each operation as well as of special health check.

A Case Study on the Feed-Back Analysis and the Reinforcement Plan using the Measurement Data of Excavation Site close to the Existing Underground Box (기존 지하 Box 근접 굴착공사 현장의 계측결과를 이용한 역해석 및 보강방안의 적용 사례)

  • Lee, Jung-Hee;Noh, Won-Seok;Jeong, Soon-Ig;Kim, Wan-Jong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.445-456
    • /
    • 2010
  • Massive underground excavation can be carried out recently due to the technical development of the excavation for retaining wall. Feed-back analysis using field measurement results is recommended to secure the stability of the construction because calculated values at stages of the design and the construction are uncertain. Reinforcement plan should be established based on the result of it. This study deals with the underground excavation site, which is under construction and is close to structure(subway) at downtown area. The result of feed-back analysis on the measurement data of displacement at multi-soil layers was reflected to make a plan for safe construction. This case study can be useful information for contingency plan on abnormal displacement which can be occurred at similar underground excavation.

  • PDF

Estimation of Ground Response Characteristics by Microtremor (미세진동 측정을 통한 지반응답특성 평가)

  • Joh sung-ho;Lee il-wha;Ko hak-song
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.718-721
    • /
    • 2005
  • The purpose of the study is to evaluate the usage of microtremor in estimation of subsurface structure and ground response to ground motion. Ground motion amplification based on site condition of an area is an important parameter for dynamic design. Microtremor cover the characteristics in a low frequency range, while forced vibrations cover them in a high-frequency range. Microtremor consider ground characteristics and offer transfer function in area. To determine the dominant frequency, the passive microtremor measurement is performed and to determine the transfer function of test site, active microtremor measurement is performed. Microtremor measurement in the site is compared with theoretical transfer function calculated from the known structures.

  • PDF

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

Dispute Mediation Cases and Suggestions for Calculating Compensation for Dust Damage (먼지 피해의 환경분쟁조정 사례 분석과 배상액 산정안 제언)

  • Jeong-Ho Park
    • Journal of Environmental Science International
    • /
    • v.32 no.10
    • /
    • pp.693-701
    • /
    • 2023
  • In this study, we analyzed 82 dust damage dispute mediation cases over the past 5 years and evaluated cases where the probability of damage was verified through dust concentration measurement, modeling prediction, and chemical composition analysis. The cause of dust damage was a construction site, which accounted for most of the damage (97%), and was closely related to the distance from the construction site, total floor area of the construction site, and construction duration. Compensation was decided in only 33% of dust damage cases, and in only 6% (five cases) were damages determined using scientific techniques such as dust measurement, and forecasting. The main criteria for determining compensation were whether administrative measures were taken and evidence of damage in the form of videos and photos. In the future, measuring or model for the amount of dust damage is necessary to determine whether the limit has been exceeded and to revise the standard for calculating compensation through various lines of evidence of dust damage.

Optimal Design of Flow Measurement System Using Turbine Flowmeter (터빈유량계를 이용한 유량 측정 시스템의 최적 설계)

  • Kim, Hong-Tark;Kim, Boo-Il
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.13 no.1
    • /
    • pp.77-84
    • /
    • 2018
  • The turbine flowmeter is selected for high precision and reproducibility at the time of flow rate measurement but causes various uncertainty factors of measurement in the difference between the standard environmental condition at calibration and the environmental condition at the site. Also, a reliable interpolation method is required for use in sections other than calibrated measurement values. Therefore, in this paper, in order to improve the reliability of the flow rate measurement, we designed and manufactured a device that accurately measures the output signal of the turbine flowmeter, interpolates the value of the calibrated result value, and corrects the temperature change in real time We confirmed the reliability of the measurement at the site to carry out the performance verification.

A Comparative Study of Blood Pressure According to Cuff Size and Measurement Site (커프크기와 측정부위에 따른 혈압측정치 비교 연구)

  • Song, Mi-Ryeong;Kim, Eun-Kyung
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.16 no.1
    • /
    • pp.6-13
    • /
    • 2009
  • Purpose: The purpose of this study was to identify differences in blood pressure according to cuff size and measurement sites of the participants. Method: The participants consisted of 50 women and 50 men whose upper arm circumference was $26\sim30cm$. They had no chronic illness and gave consent to participate. Blood pressure of the wrist was measured in the sitting position, the upper arm with a standard cuff, large and small cuffs were used for measurement in supine position and the thigh in prone position. The data were analyzed with paired t-test using SPSS 12.0 program. Result: The data for the upper arm showed a difference in systolic and diastolic blood pressure depending on the site of measurement. There was a significant difference between measurements with a standard cuff and measurements with large and small cuffs. The systolic blood pressure of the wrist and the thigh were significantly lower than that of the upper arm. Conclusion: These results suggest that the selection of an appropriate cuff is an essential element in ensuring accuracy when measuring blood pressure and differences in systolic blood pressure for the upper arm, wrist and thigh indicate the need to record the measuring site when measuring blood pressure.

  • PDF

Derivation of Consideration Factors for Fine Dust Measurement through GIS Mapping (단지조성공사의 미세먼지 측정 및 GIS Mapping을 통한 미세먼지 측정 고려요소 도출)

  • Kim, Young Hyun;Han, Jae Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.163-164
    • /
    • 2020
  • When measuring fine dust at a large-scale site such as complex construction, the change in the value of fine dust measurement is large due to the influence of the time, location, wind speed, wind direction, and humidity. This study aims to find out the results of measuring fine dust in an actual construction site and inferring the changes.

  • PDF

Diagnosis of power cable system based on the HFPD detection at on-site (HFPD 검출법을 이용한 지중 케이블 실선로 진단)

  • Lee, J.S.;Kim, C.S.;Lee, D.G.;Kong, C.H.;Seok, K.H.;Lee, K.W.
    • Proceedings of the KIEE Conference
    • /
    • 2004.05b
    • /
    • pp.97-100
    • /
    • 2004
  • HFPD(High Frequency Partial Discharge) measurement has been widely performed to diagnosis of cable system in the world although Korea just begin. The efficiency of measurement has been reported and proved by many researchers who are engaged in the diagnosis of high power apparatus. LG Cable has investigated the technology of diagnosis for cable system by means of PD measurement for 10 years. In this paper, PD measurement with portable device was performed to evaluate the quality of the 154kV transmission line and the 22.9kV XLPE cable line. Test results are shown that the HFPD detection technology is very attractive for the diagnosis of power cable system by high detection sensitivity at on-site.

  • PDF