• Title/Summary/Keyword: maximum plastic moment

Search Result 66, Processing Time 0.026 seconds

COMPARATIVE STUDY ON THE FRACTURE STRENGTH OF METAL-CERAMIC VERSUS COMPOSITE RESIN-VENEERED METAL CROWNS IN CEMENT-RETAINED IMPLANT-SUPPORTED CROWNS UNDER VERTICAL COMPRESSIVE LOAD

  • Pae, Ahran;Jeon, Kyung-A;Kim, Myung-Rae;Kim, Sung-Hun
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.45 no.3
    • /
    • pp.295-302
    • /
    • 2007
  • Statement of problem. Fracture of the tooth-colored superstructure material is one of the main prosthetic complications in implant-supported prostheses. Purpose. The purpose of this in vitro study was to compare the fracture strength between the cement-retained implant-supported metal-ceramic crowns and the indirect composite resinveneered metal crowns under the vertical compressive load. Material and methods. Standard implants of external type (AVANA IFR 415 Pre-mount; Osstem Co., Busan, Korea) were embedded in stainless steel blocks perpendicular to their long axis. Customized abutments were fabricated using plastic UCLA abutments (Esthetic plastic cylinder; Osstem Co., Busan, Korea). Thirty standardized copings were cast with non-precious metal (Rexillium III, Pentron, Walling ford, Conn., USA). Copings were divided into two groups of 15 specimens each (n = 15). For Group I specimens, metal-ceramic crowns were fabricated. For Group II specimens, composite resin-veneered (Sinfony, 3M-ESPE, St. Paul, MN, USA) metal crowns (Sinfony-veneered crowns) were fabricated according to manufacturer's instructions. All crowns were temporary cemented and vertically loaded with an Instron universal testing machine (Instron 3366, Instron Corp., Norwood, MA, USA). The maximum load value (N) at the moment of complete failure was recorded and all data were statistically analyzed by independent sample t-test at the significance level of 0.05. The modes of failure were also investigated with visual analysis. Results. The fracture strength of Sinfony-veneered crowns ($2292.7{\pm}576.0N$) was significantly greater than that of metal-ceramic crowns ($1150.6{\pm}268.2N$) (P < 0.05). With regard to the failure mode, Sinfony-veneered crowns exhibited adhesive failure, while metal-ceramic crowns tended to fracture in a manner that resulted in combined failure. Conclusion. Sinfony-veneered crowns demonstrated a significantly higher fracture strength than that of metal-ceramic crowns in cement-retained implant-supported prostheses.

Collapse Prevention Method of Long-span Plastic Greenhouse for Heavy Snow (장스팬 비닐하우스의 폭설에 의한 붕괴방지법 연구)

  • Kim, Bo-Kyung;Lee, Swoo-Heon;Kim, Jin-Wook;Shin, Kyung-Jae
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.1
    • /
    • pp.67-74
    • /
    • 2010
  • The cases of collapse of greenhouses in rural areas have been increasing due to the unexpected heavy snow load. Studies on how to prevent the collapse of greenhouses are rare, however, and the damages are repeated annually. This studysuggests two reinforcing methods: the use of ahigh-strength tapered module, and the addition of a pre-tension tie. The high-strength tapered section is installed where the bending moment is maximum. The design of a plastic greenhouse is controlled by its strength rather than its deflection. The shape of a greenhouse resembles that of an arch system, but its actual structural behavior is the frame behavior, because it is non-continually composed of a curved element (a beam) and vertical elements (columns). This system is too weak and slender to resist a vertical load, because an external load is resisted by the moment rather than by axial force. In this study, a new method, the installation of a temporary tie at the junction of the arch and the column only during snow accumulation, is proposed. The tie changes the action of the greenhouse frame to an arch action. The arch action is more effective when the pre-tension force is applied in the tie, which results in a very strong temporary structural system during snowfall. As a result of using this high-strength tapered section, the combined strength ratio of what? decreased from 10% to 30%. In the case of the additional reinforcement with a tie, it was reduced by half.

Evaluation of Load-Carrying Capacity Loss due to Corrosion in Thin-Walled Section Steel Members (판폭두께비가 큰 휨부재의 부식발생에 따른 구조성능평가에 관한 연구)

  • Chung, Kyung Soo;Park, Man Woo
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.6
    • /
    • pp.619-626
    • /
    • 2009
  • The use of thin-walled flexural members has proven to be a practical way to achieve the lowest cost in the construction of prefabricated long-span, low-rise building frames in steel. On the other hand, most of these structures are subjected to corrosion due to environmental exposure, which can reduce their carrying capacity. Corrosion damage is a serious problem for these structures as it causes thickness loss. That is, the class of a section (plastic, compact, non-compact, or slender) may change from one to another due to the loss of thickness of the compression flange and web due to corrosion. In this study, the effects of corrosion on thin-walled members in long-span steel frames were evaluated with regard to the moment-rotation curve, initial stiffness, maximum load capacity, stiffness in the post-maximum capacity, and energy absorption.

Development of Automatic Loading Equipment of Seedling Tray for Automatic Process of Raising Seedlings in Plant Factory (식물공장 육묘공정 자동화를 위한 육묘트레이 자동적재장치 개발)

  • Park, Sang-Min;Min, Young-Bong;Lee, Gong-In;Kim, Dong-Ouk;Kang, Dong-Hyun;Moon, Sung-Dong
    • Journal of agriculture & life science
    • /
    • v.45 no.5
    • /
    • pp.105-113
    • /
    • 2011
  • This study was carried out to develop an automatic loading equipment that can load seedling trays on loading position of the seedling bed driving on enclosed-type rail installed for interconnecting each process of raising seedlings in plant factory. The experiment of transferring the seedling tray by monorail pusher was carried out to figure out the required transfer force and problems during push type device of transporting the plastic seedling trays, that has completed its sowing process, which are installed onto the board of different materials. From the results of this experiment, the loading equipment which can exactly load three of the seedling trays orderly on the loading position of the seedling bed was designed and made. When three sowed trays on every board are transferred by pusher with the speed is at 30 cm/s, the maximum peak transfer force with maximum overshooting at initial transient state and the maximum transfer force at stead state are were respectively 32.8 N, 29.4 N on rubber board, 29.7 N, 22.5 N on a wooden board, 26.9 N, 19.6 N on a acrylic board, and 27.6 N, 19.1 N on an iron board. Changes in the transfer force occurred its maximum at the moment when the pusher collided with the tray, after the collision gradually decreased until it became stable. When two or three trays placed it in order of widthwise are transferred, it is occurred the overlapping of the tray's external bracket. The developed automatic loading equipment with PLC controller did not make any operation error through 100 times of tests, its maximum seedling tray loading speed was 2 sec/tray and its maximum error of transferred location of the tray was 0.5 cm.

Cyclic Seismic Testing of Cruciform Concrete-Filled U-Shape Steel Beam-to-H Column Composite Connections (콘크리트채움 U형합성보-H형강기둥 십자형 합성접합부의 내진성능)

  • Park, Chang-Hee;Lee, Cheol-Ho;Park, Hong-Gun;Hwang, Hyeon-Jong;Lee, Chang-Nam;Kim, Hyoung-Seop;Kim, Sung-Bae
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.4
    • /
    • pp.503-514
    • /
    • 2011
  • In this research, the seismic connection details for two concrete-filled U-shape steel beam-to-H columns were proposed and cyclically tested under a full-scale cruciform configuration. The key connecting components included the U-shape steel section (450 and 550 mm deep for specimens A and B, respectively), a concrete floor slab with a ribbed deck (165 mm deep for both specimens), welded couplers and rebars for negative moment transfer, and shear studs for full composite action and strengthening plates. Considering the unique constructional nature of the proposed connection, the critical limit states, such as the weld fracture, anchorage failure of the welded coupler, local buckling, concrete crushing, and rebar buckling, were carefully addressed in the specimen design. The test results showed that the connection details and design methods proposed in this study can well control the critical limit states mentioned above. Especially, the proposed connection according to the strengthening strategy successfully pushed the plastic hinge to the tip of the strengthened zone, as intended in the design, and was very effective in protecting the more vulnerable beam-to-column welded joint. The maximum story drift capacities of 6.0 and 6.8% radians were achieved in specimens A and B, respectively, thus far exceeding the minimumlimit of 4% radians required of special moment frames. Low-cycle fatigue fracture across the beam bottom flange at a 6% drift level was the final failure mode of specimen A. Specimen B failed through the fracture of the top splice plate of the bolted splice at a very high drift ratio of 8.0% radian.

Experimental Study on Two-Seam Cold Formed Square CFT Column to Beam Connections with Asymmetric Diaphragms (상하 이형 다이아프램으로 보강된 2심 냉간성형 각형 CFT 기둥-보 접합부의 실험적 연구)

  • Oh, Heon Keun;Kim, Sun Hee;Choi, Sung Mo
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.1
    • /
    • pp.35-45
    • /
    • 2013
  • The concrete-filled tube column has the excellent structural performance. But it is difficult to connect with column and beam because of closed section. It suggests that pipe should be produced by welding two sides together where two shapes are joined after a channel is pre-welded onto the three sides in order to form an internal diaphragm. The upper diaphragm of the connection used the horizontal plate and the lower diaphragm used the Vertical plate. This research performed 6 monotonic tension experiments describing the connection upside and downside in order to evaluate the structural capability of the offered connection. And the cyclic loading experiment was performed about 2 T-Type column to beam connections. As to the experimental result edge cutting geometry, there was no big effect. An increase in the number of holes of the plate ultimate strength was increased by 5% and The thickness of the plate increases, the maximum strength was increased by 4%. T-Type connections until it reaches the plastic moment showed a stable behavior.