• Title/Summary/Keyword: management method

검색결과 22,030건 처리시간 0.047초

Plan of Construction Management for Reinforcement Method of Slope (사면보강 공사시 관리 방안)

  • 박종호;정희석;이재덕;홍익표
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.44-51
    • /
    • 2002
  • The construction road and addition work are increasing now. Therefore, slope stability is important in construction slope on the fault and fractured zone. Rock bolt method, soil nailing method and anchor method are applied to reinforcement method of slope. This paper is the study for construction management on reinforcement method of slope.

  • PDF

A study on the success factors for six sigma in Public Corporations (공기업에서의 식스시그마 성공요인에 관한 연구)

  • Cho, In-Hee;Yoon, Seong-Pil;Jung, Kyung-Hee
    • Journal of the Korea Safety Management & Science
    • /
    • 제10권3호
    • /
    • pp.183-191
    • /
    • 2008
  • Many companies desperately effort to find out more effective management method to survive in keen competition. Jack welch of past GE's CEO had said that an excellent result of today's GE management is thanks to Six sigma work. Many korean companies are introduced Six sigma method in their management since late 1993. Six sigma uses a set of strategies, statistics and methods to improve the processes we use to do everything from designing to manufacturing a product from marketing products and services to providing business information to our internal and external customers. The purpose of this study is to overcome these problems and to help make an important decision in establishing introduction strategy by abstracting the reasons and success factors and result indices which are important sources for introducing Six sigma management.

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

AN INTRODUCTION OF NEW SCHEDULING SOFTWARE "BEELINER" BASED ON THE BEELINE DIAGRAMMING METHOD (BDM)

  • Seon-Gyoo Kim
    • International conference on construction engineering and project management
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.391-396
    • /
    • 2013
  • As the construction environment has been changing all the times, the techniques for managing the construction projects have been improved accordingly. The schedule management technique, one of the construction management tools, has been evolved as well in order to be adaptable to new construction environment. Most of newly proposed scheduling techniques have been based on the Critical Path Method (CPM) that was proposed in 1956. The CPM is classified into two categories, Arrow Diagramming Method (ADM) and Precedence Diagramming Method (PDM). ADM is so good in the visual format but it cannot express the overlapping relationships between two consecutive activities. On the other hand, PDM can express the overlapping relationships but it is unsatisfactory in the visual format. Recently, as the construction environment becomes more complex and the role of schedule management becomes more and more important, the overlapping expression becomes one of critical factors for scheduling as well. Most of construction project participants prefer more comfortable visual format, however, the scheduling software based on the PDM cannot satisfy their basic requirement. Beeliner, new scheduling software based on the Beeline Diagramming Method (BDM) that was proposed in 2010, was developed in 2012, it can express more flexible overlapping relationships and has superior visual format as well. This paper presents major features and applications of Beeliner, and makes construction professionals understand new scheduling concept and its applications.

  • PDF

RoHS management and product reliability ensure method for the environmental preservation (환경보호를 위한 RoHS 관리와 제품신뢰성 확보 방안)

  • Lee, Jong-Beom;Cho, Jai-Rip
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 한국품질경영학회 2007년도 춘계학술대회
    • /
    • pp.362-369
    • /
    • 2007
  • This study set the hypothesis to develop the method that was analysis and application of a reliability evaluation method of environmental material for the Computer, Color TV, Monitor, Microwave oven, Electric Refrigerator, Automobile parts, other goods. RoHS management and product reliability ensure method for the conservation of environment. Especially, this study emphasis on regulate export of the EU and North America that it's a environmental material problem. Therefore, this study emphasis on the application of a reliability ensure method of environmental material and the use of other parameter by environmental reliability test data. The result of this study is as follows. 1) There is relationship between regulate material and technical protecting system. 2) Characteristics of hazard material is operating a healthcare damage factor as well as regulate environmental factors.

  • PDF

A Case Study on the Analysis Method of the Accounting Information with Spreadsheet Program (스프레드시트를 활용한 회계정보 분석 사례연구)

  • Park Yong-Soo
    • Management & Information Systems Review
    • /
    • 제6권
    • /
    • pp.63-88
    • /
    • 2001
  • This paper presents a case study regarding a simple accounting information analysis method through the practical design using spreadsheet tool-Excel, which can offer to the management with more useful and practical information for the management decision-making. In this study, spreadsheet program is used to constitute case of the accounting information analysis method. Spreadsheet tool-Excel is easy to analyze the accounting information. And it can constitute a necessary program through function menu. In conclusion, the spreadsheet program should be used for quantitative analysis and evaluation on the accounting information. And it should be used to perform management activities. The results of this study may be summarized as follows: First, it is possible to constitute useful and practical case in the accounting information analysis method with spreadsheet program. Second, this study proposes directions for the accounting information analysis method with spreadsheet program.

  • PDF

Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index) (한국형 PDRI(Project Definition Rating Index)기법 개발 방향)

  • Hong, Sim-Hee;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

Development of Construction Process Safety Information Management System for Safety Accident Prevention (안전사고 예방을 위한 건설업 공정 안전 정보 관리 시스템 개발)

  • Jun Hyun Jong;Yang Kwang Mo;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • 제7권1호
    • /
    • pp.11-23
    • /
    • 2005
  • It is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.