• Title/Summary/Keyword: making object

Search Result 643, Processing Time 0.036 seconds

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

A Method for Improving Object Recognition Using Pattern Recognition Filtering (패턴인식 필터링을 적용한 물체인식 성능 향상 기법)

  • Park, JinLyul;Lee, SeungGi
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.53 no.6
    • /
    • pp.122-129
    • /
    • 2016
  • There have been a lot of researches on object recognition in computer vision. The SURF(Speeded Up Robust Features) algorithm based on feature detection is faster and more accurate than others. However, this algorithm has a shortcoming of making an error due to feature point mismatching when extracting feature points. In order to increase a success rate of object recognition, we have created an object recognition system based on SURF and RANSAC(Random Sample Consensus) algorithm and proposed the pattern recognition filtering. We have also presented experiment results relating to enhanced the success rate of object recognition.

A Study on the Non-everydayness of Interior Object - Focused on Nigel Coates' Early Commercial Interior Design - (실내디자인에서 Object의 비일상성 연구 - Nigel Coates의 초기 상업공간작품을 중심으로 -)

  • Suh, Jeong-Yeon
    • Journal of the Korea Furniture Society
    • /
    • v.23 no.2
    • /
    • pp.185-194
    • /
    • 2012
  • Contemporary society maintains mass-product system that keeps endless cycle of making and consuming. In this vein, everyday life becomes to be under the control of function and efficiency. On the contrary, the people are getting to have a desire of escaping from this everydayness, that is, the desire for non-everydayness. British architect, Nigel Coates understood the potentiality of contemporary metropolis which produce new experiences through their heterogeneities. During 1980s, Japanese economic bubble provided rich nourishment to the desire for non-everydayness based on consumers' tastes. Nigel Coates snatched this phenomena and designed commercial spaces aligned to the non-everydayness. He shows very eloquent version of escaping sense. We can find the exquisite quality of non-everydayness through design vocabulary of object's form and arrangement. In the viewpoint of object form, Coates adopted classical statues of Greek, that is antique, and modern gadgets such as airplane wings and seats. Also, we can find abundant gestures of curvilineal contours throughout the objects he designed. As for the objects' arrangement, he introduced repetition and curved composition that can stimulate human interaction with interior scape.

  • PDF

Development of an efficient algorithm for the minimum distance calculation between general polyhedra (일반적인 다면체 사이의 최소거리 계산을 위한 효율적인 알고리즘의 계산)

  • 임준근;오재윤;김기호;김승호
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.1876-1879
    • /
    • 1997
  • This paper developes an efficient algorithm for the minimum distance calculation between general polyhedra(convex and/or concave). The polyhedron approximates and object using flat polygons which composed of more than three veritices. The algorithm developed in this paper basically computes minimun distance betwen two convex polygons and finds a set of polygons whcih makes a global minimum distance. The advantage of the algorithm is that the global minimum distance can be computed in any cases. But the big disadvantage is that minimum distance computing time is repidly increased with the number of polygons which used to approximate an object. This paper developes a method to eliminate unnecessary sets of polygons, and an efficinet algorithm to compute a minimum distance between two polygons in order to compensate the inherent disadvantage of the algorithm. It takes only a few times iteration to find minimum distance for msot polygons. The correctness of the algortihm are visually tested with a line which connects two points making a global minimum distance of simple convex object(box) and concave object(pipe). The algorithm can find minimum distance between two convex objects made of about 200 polygons respectively less than a second computing time.

  • PDF

조선 중일정계획시스템을 위한 공정계획 객체 설계에 관한연구

  • 최해주;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.290-293
    • /
    • 2001
  • The mid-schedule planning of the ship is making a schedule about the process from cutting to erection. The ship consists of lots of blocks. This block has different process because of the shape of the block varies in accordance with the ship-type and the part position of the ship. The type and order of each block process initially must be generated for the mid-schedule planning. In this paper, the process planning, described as above is preparing the basic information before scheduler make a plan with the prepared manhour. The scheduling is done with this process planning which includes the information of the process order. This paper shows the research about three methods to design the process planning. First, investigate the expression method about information of the process planning for the mid-schedule planning in real workplace. Second, design the object of the process planning on the basis of investigating the expression method. Finally, develop the prototype of object on the basis of this designed process planning and then find the practical use in the mid-schedule planning. The object, which is developed in this paper, contains the main algorithm. In case of developing The Mid-Schedule Planning System, this object is expected to be utilized very easily as consisting another object.

  • PDF

A Framework Development for BIM-based Object-Oriented Physical Modeling for Building Thermal Simulation (객체지향 물리적 모델링 기법을 활용한 BIM기반 통합 건물에너지 성능분석 모델 구축 및 활용을 위한 프레임워크 개발 - 건물 열부하 시뮬레이션 중심으로 -)

  • Jeong, WoonSeong
    • KIEAE Journal
    • /
    • v.15 no.5
    • /
    • pp.95-105
    • /
    • 2015
  • Purpose: This paper presents a framework development for BIM (Building Information Modeling)-based OOPM (Object-Oriented Physical Modeling) for Building Thermal Simulation. The framework facilitates decision-making in the design process by integrating two object-oriented modeling approaches (BIM and OOPM) and efficiently providing object-based thermal simulation results into the BIM environment. Method: The framework consists of a system interface between BIM and OOPM-based building energy modeling (BEM) and the visualization of simulation results for building designers. The interface enables a BIM models to be translated into OOPM-based BEM automatically and the thermal simulation from the created BEM model immediately. The visualization module enables the simulation results to be presented in BIM for building designers to comprehend the relationships between design decisions and the building performances. For the framework implementation, we utilized the Modelica Buildings Library developed by the Lawrence Berkeley National Laboratory as a thermal simulation solver. We also conducted an experiment to validate the framework simulation results and demonstrate our framework. Result: This paper demonstrates a new methodology to integrate BIM and OOPM-based BEM for building thermal simulation, which enables an automatic translation BIM into OOPM-based BEM with high efficiency and accuracy.

A Study on the Weight Lightening Algorithm of 3-Dimensional Large Object based on Spatial Data LOD (공간데이터 LOD 기반 3차원 대용량 객체의 경량화 알고리즘 연구)

  • Na, Joon Yeop;Hong, Chang Hee
    • Spatial Information Research
    • /
    • v.21 no.6
    • /
    • pp.1-9
    • /
    • 2013
  • Recently, Construction information is being changed from CAD to BIM, and GIS is extending from outdoor to indoor information. In these circumstances, the needs of continuous use of construction information linked with GIS are growing constantly in stages of maintenance, operation and service as well as planning, design and construction. To this end, it is essential element to represent 3-dimensional large object efficiently in establishing BIM-GIS interoperability platform by combination of construction and spatial information. In this study, we design spatial data LOD for making spatial object and texture by level, and develop weight lightening algorithm of large spatial object.

The Conservation of a Spanish Gourd-Style Jar (Donated Object by Sir Ganeko) (金子量重(가네코 카즈시게) 기증(寄贈) 박형(珀形) 호(壺)의 복원(復元) - 경질토기(硬質土器)를 중심(中心)으로 -)

  • Hwang, Hyun-sung;Lee, Hae-soon;Yi, Yong-hee
    • Conservation Science in Museum
    • /
    • v.3
    • /
    • pp.15-19
    • /
    • 2001
  • This article examines the conservation process of a donated Gourd-style jar (Object No. Geumja No.124), which was broken into several fragments (more than 60) in the past. After assessing the condition of the object, each of the fragments were re-attached, and missing areas were gap-filled and re-touched. The authors discuss considerations, which were taken into account during the decision making process. These include the integrity of the object and the section of treatment materials, such as the reversibility of adhesives and filling materials. After its conservation, the authors believe that the object is in a better condition and ready for display in the future.

Robust 3D Object Detection through Distance based Adaptive Thresholding (거리 기반 적응형 임계값을 활용한 강건한 3차원 물체 탐지)

  • Eunho Lee;Minwoo Jung;Jongho Kim;Kyongsu Yi;Ayoung Kim
    • The Journal of Korea Robotics Society
    • /
    • v.19 no.1
    • /
    • pp.106-116
    • /
    • 2024
  • Ensuring robust 3D object detection is a core challenge for autonomous driving systems operating in urban environments. To tackle this issue, various 3D representation, including point cloud, voxels, and pillars, have been widely adopted, making use of LiDAR, Camera, and Radar sensors. These representations improved 3D object detection performance, but real-world urban scenarios with unexpected situations can still lead to numerous false positives, posing a challenge for robust 3D models. This paper presents a post-processing algorithm that dynamically adjusts object detection thresholds based on the distance from the ego-vehicle. While conventional perception algorithms typically employ a single threshold in post-processing, 3D models perform well in detecting nearby objects but may exhibit suboptimal performance for distant ones. The proposed algorithm tackles this issue by employing adaptive thresholds based on the distance from the ego-vehicle, minimizing false negatives and reducing false positives in the 3D model. The results show performance enhancements in the 3D model across a range of scenarios, encompassing not only typical urban road conditions but also scenarios involving adverse weather conditions.

A Research on how to turn Object oriented Database of civil materials to practical use (객체지향 Data Base를 이용한 토목자재 정보의 이용방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Kim, Do-Keun;Jo, Chan-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.708-711
    • /
    • 2008
  • This study is intended to build research for ways to utilize material information in the design and working business for public works. The contents and results of this study can be classified into object-oriented DB application to bridge construction and object-oriented DB utilization of civil material information. First, application of object-oriented DB to bridge construction 1) constructs the work unit of classified work table as an object(Each object constructs material information on the statement of quantity calculation as data), 2) constructs object-oriented DB for superstructure and substructure of PSC Beam bridge, 3) leads to the research for ways to utilize materials by developing 3D bridge prototype with REVIT structure. Secondly, ways to utilize object-oriented DB for civil material information identified the possibility for utilizing it in making 2D drawings for design work, preparing materials list, analyzing structure for working businesses, selecting and purchasing materials, managing process and maintaining. It is suggested that the results of this study should be applied to all bridge constructions through test-bed and additional studies so as to secure the credibility of the results of this study.

  • PDF