• Title/Summary/Keyword: maintenance system

Search Result 6,396, Processing Time 0.037 seconds

A Study on the Effectiveness of the Depot Maintenance: Based on the Maintenance Data of K-1 Main Battle Tank Since 2010 (창정비의 실효성에 대한 고찰: K-1 전차의 2010년 이후 정비자료를 바탕으로)

  • Kim, Heongil;Park, Jaehun;Sung, Si-Il
    • Journal of Applied Reliability
    • /
    • v.17 no.3
    • /
    • pp.256-263
    • /
    • 2017
  • Purpose: This article provides the efficiency test results of conducting depot maintenance. Method: ANOVA (analysis of variance) and ANCOVA (analysis of covariance) tests are conducted using data obtained from Defense Logistics Integrated Information System (DELIIS). Results: The result shows that although the effect of the depot maintenance is significant, some parts do not follow the overall effect of the depot maintenance. In order to solve the problem we provide some suggestions to be improved. Conclusion: For improving the combat readiness condition of K-1 main battle tank, the maintenance policies and regulation must be revised for the parts of the weakness. In addition, the collection way of the operation and maintenance data must be redesigned.

Reliability Analysis for Decoy using Maintenance Data (정비 데이터를 이용한 기만체계 신뢰도 분석)

  • Gwak, Hye-Rim;Hong, Seok-Jin;Jang, Min-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.82-88
    • /
    • 2018
  • The decoy defensive weapon system is a one-shot system. Reliability is maintained through periodic inspection and high reliability is required to confirm whether or not the functioning is normal after launch. The maintenance cycle of a decoy was set up without target reliability and reliability prediction during the development period. However, the number of operations in the military has been increasing, necessitating the optimization of the maintenance cycle. Reliability is analyzed using the maintenance data of a decoy operated for several decades and the optimal maintenance cycle is suggested. In chapter 2, data collection and classification methods are presented and analysis methodology is briefly introduced. In chapter 3, the data distribution analysis and fitness verification confirmed that applying the Weibull distribution is the most suitable for the maintenance data of the decoy. In chapter 4, we present the analysis result of percentile, survival probability and MTBF and the optimal maintenance cycle was derived from the reliability analysis. Finally, we suggest the application methods for this paper in the future.

Development of PEID for Acquiring Maintenance Information during Product Lifecycle of Marine Vessels (선박해양구조물의 제품수명주기 내 유지보수 정보 획득을 위한 PEID에 관한 연구)

  • Jeon, Jeong-Ik;Lee, Jang-Hyun;Son, Gum-Jun
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.5
    • /
    • pp.63-72
    • /
    • 2012
  • The product lifecycle of a marine vessel can be classified into the design-production, operation-maintenance, and disposal phases. During the operation and maintenance phase, status data should be gathered from the major machinery and instruments installed on the marine vessel in order to perform efficient maintenance work. Although a PLM (product lifecycle management) system can manage the product information during the design and assembly stage, a PLM based on asset management technology is more appropriate for product information management during the operation stage. Product embedded information devices (PEIDs) are suggested for gathering real-time maintenance information during the operation and maintenance lifecycle. A PEID allows PLM to provide the capability of offering active information exchange between the lifecycle management system and equipment. This study designed a PEID to effectively obtain information and interact with a PLM system. It consists of sensors, wireless communication, and a micro-processor, which allow it to accumulate status data on the PLM system. The embedded information device and PLM enable the seamless information flow, tracking, and updating of MRO (maintenance repair and overhaul) information for a product throughout the middle of the product lifecycle.

Live line maintenance technique trend of UHV T/L (초고압 송전선로의 활선공법 기술 동향)

  • Lee, Dong-Il;Choi, In-Hyuk;Jung, Yoon-Hwan
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.260-264
    • /
    • 2005
  • This paper gives a basic information of live line maintenance technique of UHV T/L and introduce a technical background and trends of domestic and abroad. The importance of live line maintenance technology getting increased because the change of power system environment and maintenance conditions in korea. this paper explain the present state of the development of live line maintenance technique in korea and show a difference with advanced countries.

  • PDF

KTX Trainset Maintenance Routing and Allocation System for Korea High-Speed Rail (한국고속철도를 위한 차량운용 및 할당시스템)

  • Hong Soon-Hum;Kim Seongho
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.5
    • /
    • pp.391-397
    • /
    • 2005
  • In this paper we present a model for the maintenance routing construction and the trainset allocation (maintenance routing problem). The model solves the maintenance routing problem using column generation algorithm which was used to combine constraint programming and linear programming. Ilog-cplex was used to solve the linear programming model and Ilog-solver was used to solve the constraint programming model. The computational experience is also provided.

Study on the maintenance period allocation method for railway signal equipment (철도신호설비 유지보수주기 할당에 관한 연구)

  • Lee, Kang-Mi;Shin, Duck-O;Lee, Jae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.647-652
    • /
    • 2008
  • Railway signal system has been more complex, larger and required high reliability. So, maintenance by experience must be changed to optimize maintenance program or introduced systematic method for estabilish new maintenance program. In this paper, we introduced the maintenance period decision method which are Age based method and Block replacement method based on the failure distribution for the equipment. So, we allocated optimum maintenacne period for the railway signal equipment using block replacement method.

  • PDF

The Cost and Adjustment Factors Estimation Method from the Perspective of Provider for Information System Maintenance Cost (공급자 관점의 정보시스템 유지보수 비용항목과 조정계수 산정방안)

  • Lee, ByoungChol;Rhew, SungYul
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.2 no.11
    • /
    • pp.757-764
    • /
    • 2013
  • The estimation of maintenance cost of information system so far has been conducted centered on the ordering body, so the problem of provider's having to cover the cost due to small cost compared to the amount of work is not solved. This study is a base study for estimating the maintenance cost of information system centered on provider, and it deduces cost items of maintenance and suggests adjustment factors for adjusting the gap between the ordering body and provider regarding the maintenance cost. In order to deduce the cost items of maintenance, this study adds the activities of the provider for maintenance to the base study of cost factors regarding the existing maintenance activity, divides, and classifies them into the fixed cost and variable cost. In order to adjust the gap between the ordering body and provider regarding the maintenance cost, this study found the adjustment factors such as the code, utility, and components created by the automatic tool that was not included when estimating the maintenance cost centered on the ordering body. After examining and analyzing K Company's data of maintenance performance for three years, it confirmed that the gap regarding the adjustment factors was about 13% in case of K Company.

A Study on the System Improvement Plan for an Efficient Market Maintenance Project (시장정비사업의 효율적 실시를 위한 제도개선방안 연구)

  • Kim, Seung-Hee;Kim, Young-Ki
    • Journal of Distribution Science
    • /
    • v.11 no.4
    • /
    • pp.23-35
    • /
    • 2013
  • Purpose - This paper attempts to identify the problems and limitations of a market maintenance project conducted according to the 「Special Act for the Development of Traditional Markets and Shopping Street」 and to present a revised direction for the special law and lay the groundwork for market maintenance projects to be promoted smoothly. Research design, data, and methodology - The revised direction for the legislation and the proposal were written based on an investigation of the problems and the legal system, and proposed measures for market maintenance operation and system improvements to derive the improvements needed for market maintenance projects. Results - A market maintenance project has been conducted as a means to reinvigorate traditional markets that are economically depressed, and to revive the local economy. It was largely conducted in the form of reconstruction and redevelopment and represents the interests of landowners and merchants. Thus, it is most likely to contribute to the gradual disappearance of traditional markets. First, as part of a market maintenance project, many companies are building multipurpose buildings or high-rise residential buildings to increase profits. In these high-rise buildings, they can raise rents, which may not be affordable for some existing small businesses. To solve such problems, the large-scale store registration requirement needs to be relaxed or abolished once the market maintenance project is completed. If the large-scale store registration requirement is to be abolished, the term 'large retail store' should be changed in the 「Special Act for the Development of Traditional Markets and Shopping Street」. After registration, the Small and Medium Business Administration should train merchants, offer consultations, and support events, to the extent that the existing traditional market management modernization project permits, and further continue to manage and support its ongoing activities. However, unless large-scale store registration is abolished, adding an exception clause in the special law to relax large-scale store registration criteria, and permitting changes to building use is another option. At the end of a market maintenance project, empty stores should be purchased by the Small and Medium Business Administration, and local government, etc., at the actual construction cost, to utilize them as public rental shopping areas, which in turn may be re-utilized as a temporary market for another market maintenance project. The second problem in market maintenance projects is merchant-protection. Currently, the special law prescribes that a temporary market be created for merchants to conduct business during the rental period of a market maintenance project. Conclusions - In reality, a market maintenance project is conducted usually in big metropolitan cities with 500,000 residents or more. The main building type created under these projects is a multipurpose building. For this reason, it is very difficult to secure a location for a temporary market in the surrounding area of such a project. To solve this problem, this study suggests 'public rental shopping areas' as mentioned above.

  • PDF

Determination of Corrective Maintenance Priorities Using Joint Reliability Importance (결합 중요도를 이용한 사후보수 우선순위 결정)

  • Koo, Hoon Young;Kim, Young Bok;Hong, Jung Sik;Lie, Chang Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.1
    • /
    • pp.61-69
    • /
    • 2007
  • In a large complex system, maintenance priorities for the failed components are important to maintain the sys-tern reliability at required level. Commonly used methods of determining maintenance priorities are based onranking the failed components by using reliability importance measures such as Birnbaum reliability importance,risk achievement worth and F-V importance, etc. In the preceding works, maintenance priorities for the failedcomponents are determined by using such existing measures, In this study, a new method of determining main-tenance priorities, which utilizes the joint reliability importance is proposed. By investigating the sign of thejoint reliability importance, maintenance priorities obtained by the existing methods are adjusted to yield new re-vised priorities. The revised maintenance priorities are shown to be more effective than the existing ones fromthe standpoint of the speed of system recovery, Effectiveness of the proposed method is illustrated by numericalexamples.

Research of the Turnout Maintenance Training System using Mixed Reality (혼합현실을 이용한 분기기 유지보수 교육시스템 연구)

  • Song, Yong-Soo;Kim, Yong-Kyu;Shin, Duck-Ho;Chang, Sang-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1511-1516
    • /
    • 2011
  • The maintenance of the turnout is composed of signal field and track field on business, the electrical and mechanical field on system. adjustment and maintenance carry forward through coordination with these fields. In the case of turnout equipment used in a first phase of Seoul-Busan high-speed train, it is treated by classifying as mechanical adjustments and electrical adjustments. Mechanical adjustment is conducted with focus on fine adjustment to meet maintenance standards limits(1mm or less) about interval of basic rail and tongue rail about each part of track transition equipment. This refers to mechanical adjustments performed mainly with physical changes and movement characteristics between basic rail and tongue rail by considering the overall environment surrounding track side of section installed track transition equipment. However, these series of maintenance are conducted in state that high-speed train is not in the process from 1 am to 4 am at night, but common workers for maintenance are not familiar with the operation and checking about various situation, and the workers are even insufficient. Maintenance training using mixed reality is conducted in the place of business, we tried to overcome several problems of safety and time reduction through this training.

  • PDF