1 |
D. K. Kim, W. S. Kang, S. J. Kang, "A Study on the Storage Reliability Determination Model for One-shot System", Journal of the Korean Operations Research and Management Science Society, Vol.38, No.1, pp.1-13, 2013. DOI: https://dx.doi.org/10.7737/JKORMS.2013.38.1.001
DOI
|
2 |
H. G. Kim, S. M. Kwon, K. H. Cho, S. I. Sung, "Development of Quality Improvement Process based on the Maintenance Data of Weapon Systems", Journal of the Korean Society for Quality Management, Vol.43, No.4, pp.499-510, 2015. DOI: https://dx.doi.org/10.7469/JKSQM.2015.43.4.499
DOI
|
3 |
S. J. Hong, S. H. Jung, "A Study of Reliability of Guided Missile(OO) using Probit Analysis", Journal of the Korean Society for Quality Management, Vol.44, No.3, pp.553-564, 2016. DOI: https://dx.doi.org/10.7469/JKSQM.2016.44.3.553
DOI
|
4 |
Nelson, Wayne, Applied Life Data Analysis, Wiley, 1982.
|
5 |
Nelson, Wayne, "Accelerated Testing: Statistical Models, Test Plans, and Data Analysis", John Wiley & Sons, 2009.
|
6 |
D. S. Bea, Y. L. Jeon, Reliability Analysis, Arche, 1999.
|
7 |
S. K. Seo, Minitab Reliability Analysis, Eretec, 2015.
|
8 |
M. K. Jang, J. S. Choi, J. E. Kim, "A Study on ESS Optimization Management for Improving Reliability and Quality of Electronic Equipments", Journal of Advanced Engineering and Technology, Vol.10, No.3, pp.291-295, 2017.
|
9 |
Y. H. Lim, "A Study on Core Technology Analysis of the Decoy System", Proceedings of Symposium of the Korean Institute of communications and Information Sciences, pp.543-544, 2012.
|
10 |
B. S. Kim, K. S. Lee, D. S. Kim and K. S. Moon, "Certified Missile Rounds Concepts Using Modeling and Simulation", Journal of the Korea Society for Simulation, Vol.18, No.4, pp.95-105, 2009.
|
11 |
J. M. Lee, K. S. Kwon and H. P. Lee, "The Study on Estimating Preventive Maintenance period and Life cycle of Missile system", Proceedings of Korean Institute of Industrial Engineer, pp.1172-1176, 2011.
|