• Title/Summary/Keyword: maintenance scheduling

Search Result 158, Processing Time 0.026 seconds

Generator Maintenance Scheduling of System Operator in Competitive Electricity Markets (경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구)

  • 한석만;신영균;정구형;김강원;김발호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.8
    • /
    • pp.477-483
    • /
    • 2004
  • In competitive electricity markets, maintenance schedule is submitted by generation companies (GENCOs) and transmission companies (TRANSCOs), and coordinated by Independent System Operator (ISO) with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule. In this paper, it is focused on modeling a coordination algorithm by ISO for the maintenance schedule based on the Simulated Annealing algorithm. The proposed model employs the minimum information such as generator capacity, forced outage rate and generator maintenance schedules. The objective function of this model represents minimization of adjustment on schedules submitted by GENCOs.

Maintenance Scheduling Using PSO Algorithm for Power Plants (PSO알고리즘을 이용한 전력계통의 발전기 예방정비계획 수립)

  • Park, Young-Soo;Jeong, Hee-Myung;Park, Jong-Kook;Kim, Jin-Ho;Park, June-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.11b
    • /
    • pp.237-239
    • /
    • 2007
  • This paper focuses on maintenance scheduling using PSO algorithm for power plants from an economic (operating cost) and reliable(variance of operating reserve margin) point of view. We also apply regional reserve margin and transfer capability to maintenance scheduling problem. The proposed method has been applied to IEEE-RTS(1996) with 32-generators and a real -world large scale power system with 291 generators.

  • PDF

Maintenance Scheduling of Generation System by Fuzzy Set Theory (퍼지집합이론을 이용한 발전기보수유지계획수립)

  • Park, Jeong-Je;Choi, Jae-Seok;Baek, Ung-Ki;Cha, Jun-Min
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.127_128
    • /
    • 2009
  • A new technique using a search method which is based on fuzzy multi-criteria function is proposed for GMS(generator maintenance scheduling) in order to consider multi-objective function. Not only minimization of probabilistic production cost but also maximization of system reliability level are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model in Korea in 2010.

  • PDF

Generating unit Maintenance Scheduling based on PSO Algorithm (PSO알고리즘에 기초한 발전기 보수정지)

  • Park, Young-Soo;Kim, Jin-Ho;Park, June-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.222-224
    • /
    • 2006
  • This paper addresses a particle swarm optimization-based approach for solving a generating unit maintenance scheduling problem(GMS) with some constraints. We focus on the power system reliability such as reserve ratio better than cost function as the objective function of GMS problem. It is shown that particle swarm optimization-based method is effective in obtaining feasible schedules such as GMS problem related to power system planning and operation. In this paper, we find the optimal solution of the GMS problem within a specific time horizon using particle swarm optimization algorithm. Simple case study with 16-generators system is applicable to the GMS problem. From the result, we can conclude that PSO is enough to look for the optimal solution properly in the generating unit maintenance scheduling problem.

  • PDF

A Study on the Flexible Generator Maintenance Scheduling using Fuzzy Theory (퍼지이론을 이용한 유연한 발전기보수유지계획 수립에 관한 연구)

  • Kim, Hong-Sik;Moon, Seung-Pil;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1104-1107
    • /
    • 1999
  • A new technique using search method based on fuzzy multi-criteria function is proposed fur flexible generator maintenance scheduling. Minimization of probabilistic production cost, maximization of system reliability level and air pollution are considered fur fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by the simulation results of the real size model system of KEPCO-1997 SYSTEM.

  • PDF

Analysis on a Combined Model of Competitive Bidding and Strategic Maintenance Scheduling of Generating Units (발전력의 경쟁적 입찰전략과 전략적 보수계획에 대한 결합모형 연구)

  • Lee, Kwang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.9
    • /
    • pp.392-398
    • /
    • 2006
  • Maintenance scheduling of generating units (MSU) has strategic dimension in an oligopolistic market. Strategic MSU of gencos can affect a market power through capacity withdrawal which is related to bidding strategy in an generation wholesale market. This paper presents a combined framework that models the interrelation between competitive bidding and strategic MSU. The combined game model is represented as some sub-optimization problems of a market operator (MO) and gencos, that should be solved through bi-level optimization scheme. The gradient method with dual variables is also adopted to calculate a Nash Equilibrium (NE) by an iterative update technique in this paper. Illustrative numerical example shows that NE of a supply function equilibrium is obtained properly by using proposed solution technique. The MSU made by MO is compared with that by each genco and that under perfect competition market.

A Study on Generator Maintenance Scheduling using Genetic Algo (유전알고리즘을 이용한 발전기 예방정비계획 수립에 관한 연구)

  • Park, Si-Woo;Song, Kyung-Bin;Nam, Jae-Hyun;Jeon, Dong-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.781-783
    • /
    • 1997
  • Genetic Algorithm is a kind of an evolution programming based on natural evolution principle. It applied to probabilistic searching, machine learning and optimization, and many good results were reported. Generator maintenance scheduling is an optimization Problem with constraints. This paper applied a genetic algorithm to generator maintenance scheduling problem and tested on sample systems. The results are compared with heuristic method and branch-and-bound method.

  • PDF

Maintenance Scheduling with Considering Load Forecast Uncertainty (수요예측의 불확실성을 고려한 발전기의 정기 보수계획수립)

  • Song, K.Y.;Cha, J.M.;Oh, K.H.;Jung, M.H.;Kim, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.562-564
    • /
    • 1995
  • This paper proposes a new algorithm for maintenance scheduling with considering load forecast uncertainty. The proposed algorithm is based on the equivalent load of effective load carrying capability(ELCC) of generators. The uncertainty of forecasted load is considered as a normal distribution probability density function. For maintenance scheduling, reserve levelization method and risk levelization method are used in this study. To test the algorithm, we applied the proposed method to IEEE reliability test system(IEEE RTS). As a result, we verified the validity of the proposed method.

  • PDF

Optimal Operational Schemes of Mailing Center based on Simulation (Simulation 기반 우편집중국 최적운영 방안)

  • Nam, Yoon-Seok;Lee, Hong-Chul
    • IE interfaces
    • /
    • v.13 no.4
    • /
    • pp.680-687
    • /
    • 2000
  • The objectives of this research are to establish the operation scheduling and the preventive maintenance system in order to optimize the operation of mailing center. For the optimal operation scheduling of mailing process, the existing workflow of mailing process and that of required time are investigated prior to simulation modeling. The simulation experiments are conducted to increase the nextday delivery rate. The best alternative whose nextday delivery rate up to 100% is selected based the AHP(Analytic Hierarchy Process) method. The optimal work scheduling of all mailing centers are also presented. In addition, the CMMS(Computerized Maintenance Management System) for preventive maintenance is introduced for efficient operation of highly automated facilities of mailing center.

  • PDF

Establishment of Generator Maintenance Scheduling Considering Minimization of CO2 Emissions (CO2배출 최소화를 고려한 발전기보수유지계획의 수립)

  • Oh, Tae-Gon;Baek, Ung-Ki;Choi, Jae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.4
    • /
    • pp.705-710
    • /
    • 2011
  • This paper proposes establishment of generator maintenance scheduling(GMS) considering minimization of $CO_2$ emissions. The objective function model to minimize $CO_2$ emissions is used in this paper. In this paper, and also, GMS is established due to freedom of GMS of generators owned by a designated generation company. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model in Korea in 2010.