• Title/Summary/Keyword: maintenance of fire doors

Search Result 5, Processing Time 0.027 seconds

A Study on the Application of Quality Management to Fire Door Construction (방화문 시공시 현장품질관리지침 적용에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.90-91
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. Accordingly, on-site quality management and maintenance guideline for fire doors were presented. In this paper, we tried to explain the requirements for the construction of fire doors during the on-site quality management and maintenance guideline for fire doors presented in the study.

  • PDF

A Field Survey to Derive Defect Rate According to the Years of Use of Fire Doors in Apartment House (공동주택 방화문의 사용연수에 따른 불량률 도출을 위한 현장조사)

  • Kim, Yun-Seong;Kwon, Yeong-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.97-98
    • /
    • 2022
  • The purpose of this study is to find out the failure conditions of fire doors in the process of use and prepare maintenance measures against them and find out the failure conditions and failure rates of fire doors according to the period of use of buildings. According to a survey of the failure rate and failure factor of fire doors, the failure rate of fire doors under 5 years was 3.7%, 13.4% of fire doors under 5 years and 10 years, and 14.8% of fire doors under 15 years and 27.6% of fire doors over 20 years. In particular, 15 years later, the failure rate of fire doors exceeded 20%. The main defects were found to be natural aging, holes, opening and closing failures, gaps, and failure and wear of accessories such as gaskets and door closers.

  • PDF

A Study on the Proposal of Durability and Service Life of Fire Door in apartment house (공동주택 방화문의 내구성능 및 내용연수 제안에 관한 연구)

  • Kwon, Yeong-Jin;Kim, Yun-Seong;Jin, Seung-Hyeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.49-50
    • /
    • 2022
  • There are continuous cases of fire expansion due to fire door problems around the world, including the 2010 Shanghai Apartment Fire, the 2017 Grenfell Tower Fire in England, and the 2020 Ul-san Residential and Commercial Complex Fire. In order to prevent such fire damage, the country has strengthened the performance standards of fire doors, and recently, efforts have been made to ensure the best performance of fire doors by introducing a quality recognition system. Securing the performance of fire doors is a very important aspect. However, there is a concern that old fire doors may not function normally in the event of fire due to natural deterioration, corrosion, and damage during the use process, but countermeasures are insufficient. Therefore, from a management perspective, it is very important to maintain fire doors and secure an appropriate replacement time. Therefore, the purpose of this study is to determine whether the fire door has durability to prevent fire spread in the process of use through operation probability analysis and expert surveys, and to propose an appropriate useful life of the fire door.

  • PDF

Study on Implementation Scheme for Integrated PSD Control System of Seoul Metro (서울메트로 PSD 통합관제시스템 구축방안에 대한 연구)

  • Kim, Yong-Hyeop;Hyun, Yong-Sub;Ryoo, Ho-Joong;Kim, Jin-Su
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1551-1559
    • /
    • 2007
  • Seoul Metro has been constructing the screen doors on the platforms to provide safe and comfort environments. The screen doors of each station are configured so that they can be operated in automatic mode in connection with ATC/ATO through the integrated control panel in the station control room and in manual mode through the control panel of the station control room and crew control panel. These systems have been implemented with different data communication protocols between systems, HMI configuration, and so on due to ordering processes, implementation time and diverse suppliers, and manufactured to be operated within single station. Seoul Metro has been planning to implement the integrated control system to secure seamless train operation and safety and to have a fast response system against emergency situations such as PSD failure and fire, by implementing the system that is able to collectively manage, monitor and control the operation status and equipment conditions of PSD on to the integrated control center. This paper has studied a scheme to reduce the budget for the future facility constructions by standardizing the data format for data communication with the integrated station control panel and using the open standard protocols, in order to secure consistency of operation, system expansion and maintenance with unified and standardized control items.

  • PDF

Analysis of Causes of and Solutions to the Stack Effect by Vertical Zoning of High-rise Buildings (초고층 건축물 수직조닝별 연돌효과의 원인 및 해결 방안 분석)

  • Shin, Sang Wook;Ryu, Jong Woo;Jeong, Hee Woong;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.483-493
    • /
    • 2021
  • Urban overcrowding has created an explosive supply and demand for high-rise buildings. High-rise buildings are contributing to enhancing the image of the city by serving as focal points, but due to the stack effect, malfunction of elevator doors, difficulties in opening and closing the doors and windows of the outer wall, smoke and odors spreading to the upper floors, noise, energy loss, fire and pollutants have been causing various unexpected problems such as rapid spread of fire. This study classified high-rise buildings according to their vertical zoning, analyzed the causes of and solutions to the stack effect, and derived design and construction methods. Through the initial plan to block the outside air and securing airtightness through precise construction, we sought ways to secure the airtightness inside and outside the building by actively blocking the airflow from the lower floors. In addition, the facility solution can be a measure to reduce the specific phenomena caused by the stack effect, but it should only be applied to the minimum extent because the potential for secondary damage is high. This study emphasized the need for systematic stack effect management by suggesting design and construction measures for each vertical zoning of the causes and countermeasures of the stack effect. It is expected that this study will be helpful not only for design and construction, but also for building maintenance.