Journal of the Korean Society for Aviation and Aeronautics
/
v.22
no.1
/
pp.124-129
/
2014
The organization's safety culture is strongly tied to the success of its safety learning programme. All personnel must understand the concept and necessity of Safety Management System. In order to settle the culture which they are willing to share the responsibility of safety, it is essential for service provider as the airline company to develop the technique and knowledge which intenses the organization's safety and to perform safety learning programme to be applied. This study has looked into the preceding studies about the learning culture and surveyed how the airmen have acquired the safety lessons learned thru their safety promotion within aviation maintenance organization. Accordingly, it intends to contribute safety promotion by suggestion of the effective and positive learning culture thru the establishment of strategy and the safety learning programme suitable to the organization.
Journal of Korean Society of Industrial and Systems Engineering
/
v.46
no.3
/
pp.148-160
/
2023
The air transport industry is experiencing unprecedented fluctuations in aviation demand through the Covid-19 pandemic, and is more focused than ever on maintaining and generating business profitability. During the pandemic, demand for air cargo has soared, and the conversion business from passenger aircrafts to freighters(P2F) is drawing attention as a new business in the aviation maintenance industry. This study derives important factors to be considered in order to successfully carry out the P2F project through a wide range of cases and related literature, and analyzes the relative importance of each factor using the analytic hierarchy process. Through a survey of 33 aviation maintenance experts with more than 20 years of field experience, the importance of main factors and their sub factors was determined and implications were drawn. As a primary result, in order to succeed in the P2F project, the main factors were identified in the order of skill, finance, and location. The most important sub factors for each main factors were identified in order of securing airframe modification skill, securing infrastructure construction cost, and creating P2F business complex and district. The quantified success factors suggested the critical direction for the successful development of Korea's P2F business, and presented viable and specific business strategies and implementation plans for each factors.
Journal of the Korean Society for Aviation and Aeronautics
/
v.25
no.3
/
pp.123-134
/
2017
In order to advance into the MRO industry, the Aviation maintenance organization with suitable for the standards for personnel, facilities and operations should be first approved by FAA and EASA. The purpose of study is designed to arrange the standards required for personnel, facility, operation rule for approval of Repair Station maintenance organizations certified by FAA PART 145 of the US Federal Aviation Regulation. Also to consider the following differences through the comparative analysis with domestic AMO certification of the information in the Management, Maintenance Process, and Quality System for approval of maintenance organization authorized, the additional EASA PART 145. As a comparative analysis on maintenance organization certification in the country between FAA and EASA, this study could show us that domestic maintenance organization, certified manual contents are used by applying just many of the FAA system. And we could know that as part of the EASA maintenance organization certification process, airmen personnel were relatively systematically segmented and controlled. For domestic maintenance organization certification, operational as policy implications we would like to present policy implications such as the implication of rating system of Aviation Mechanic License like EASA, the financial support of the training center to resolve the shortage of the FAA or EASA license holders, operational organization as "CAMO" for systematic aviation mechanic certified system should be required, continued construction of hangar or MRO for airworthiness repair under Governmental support, and varied application of DER system from FAA accordingly.
Korean journal of aerospace and environmental medicine
/
v.30
no.3
/
pp.91-94
/
2020
The coronavirus infectious disease-19 (COVID-19) pandemic has had a profound impact on the aviation industry. In order to overcome this crisis, airlines have made their efforts in various fields. Therefore, we tried to summarize these efforts of airlines. It is also essential to keep aircraft that have been in landing for a long time in optimal condition. In this paper, we tried to find out about efforts to maintain landing aircraft and maintenance of personnel. Through such constant care, airlines will be able to quickly respond to increasing aviation demand when the infectious disease situation is stabilized in the future. Finally, airlines and passengers must make several efforts to ensure that passengers are free from COVID-19 while traveling by air. These include general precautions to prevent infection, separation of airline personnel and passengers, changes in seat assignments and in-flight services, periodic aircraft disinfection, and prevention of in-flight infections.
KASS (korea augmentation satellite system) is an SBAS (satellite based augmentation system) that must ensure the performance of aviation service in accordance with the International Civil Aviation Organization's SARPs (standards and recommended practices) Annex 10 - Aeronautical Telecommunications. In order to guarantee the target service performance, the operating system must be operated, maintained and managed stably, and a maintenance system must be established for this purpose. From the maintenance point of view, the KASS subsystems were developed to consist of replacement units, and the maintenance organization and procedures to manage those subsystems and units were defined. In addition, the maintenance task for each the replacement unit was developed to ensure the availability performance required for the successful KASS operation, and the developed tasks were verified to sufficiently cover the activities to maintain the previously defined replacement units. The maintenance tasks developed through this study will be continuously verified in the actual operation preparation process prior to the full-scale provision of aviation services in the end of 2023, and will be updated accordingly.
Journal of the Korean Society for Aviation and Aeronautics
/
v.22
no.4
/
pp.8-14
/
2014
The purpose of this research was to develop evaluation conformity to operate courses based on CIPP evaluation model dedicated to approval of training organizations. In order to achieve the goal, the researchers scrutinized related documents and precedent studies, initiated the draft for evaluation conformity to operate courses and secured validity for evaluation conformity initiated through Delphi Method survey. To secure validity for evaluation conformity, the researchers conducted two Delphi Method surveys of an expert panel of 22 professionals from relevant fields including officials from the Ministry of Land, Infrastructure and Transport, researchers from Korea Transportation Safety Authority, instructors from approved training organizations and officials from industries. Through the surveys, the researchers determined 4 evaluation areas, 13 evaluation items and 52 evaluation indexes as the evaluation conformity to operate courses for aircraft maintenance mechanics. On top of that, the researchers established evaluation system in the courses for aviation professionals (aircraft maintenance mechanics), and suggested a follow-up studies regarding managing the quality of education.
Recently railway operators are doing a lot of researches and studies in order to apply reliability technologies to their maintenance tasks. The maintenance in the aviation and the munitions industry has been developed enough to be benchmarked with the high quality reliability technologies; however, railway industry is still situated in a rudimentary stage with insufficient & limited data. 5678 Seoul Metropolitan Rapid Transit Corporation, which has 17 year experience of the EMU maintenance and system development, has made a constant effort for appling RCM (Reliability Centered Maintenance) to the maintenance for a few years. In this connection, the case study is to be introduced. This paper is based on 'RCM Gateway to World Class Maintenance' by Anthony M. Smith". The reliability technology are applied to the specific EMU and its system by 7 stages; accordingly, applying SMRT's maintenance experience, a unique standard for FMEA(failure mode effect analysis) & LTA(logical tree analysis) is established. Moreover, for reasonable and effective preventive maintenance tasks, the case considering an analysis of failure effects is selected in the final step 7. SMRT will develop reliability technologies through the application of the results to all the EMU systems.
The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review
Age replacement policy is a commonly policy in maintenance management of spare part. It means that a spare part is always replaced at failure or fixed time after its installation, whichever occurs first. An optimal age replacement policy of spare parts concerns with finding the optimal replacement time determined by minimizing the expected cost per unit time. The age of the part was generally assumed to be a random variable in the past literatures, but in many situations, there are few or even no observed data to estimate the probability distribution of part's lifetime. In order to solve this phenomenon, a new uncertain age replacement policy has been proposed recently, in which the age of the part was assumed to be an uncertain variable. This paper discusses the optimal age replacement policies by dealing with the parts' lifetimes as different distributed uncertain variables. Several results on the optimal age replacement time are provided when the lifetimes are described by the uncertain linear, zigzag and lognormal distributions.
Journal of the Korean Society for Aviation and Aeronautics
/
v.22
no.2
/
pp.34-39
/
2014
Airworthiness authorities specify the technical standards of airworthiness that propose minimum requirement of the commercial transport category and apply the rules in the certification process to ensure the safety of the aircraft. The Federal Aviation Administration and other national airworthiness authorities define the fatal accident risk levels for the safety assessment of the aircraft system and establish standard procedures to apply both qualitative and quantitative analysis techniques. However, an accident or incident may occur by the combination of various factors, although the aircraft is designed in accordance with the strict standards and approval by the Airworthiness Authorities. There are some key factors, such as human error, unpredictable complex system failures, degradation of the components reliability, improper maintenance task and intervals. Risk can be reduced by reflecting aircraft operational experience with similar types of aircraft in the process of aircraft development and safety assessment. Result of the root cause analysis for the Airbus A300-600 incident in which the aircraft engine reverser was deployed in the air have been introduced to reflect the design of system and related components. Also, this paper suggests to create a big-database in order to provide a feed-back to the FAR Part 25 transport category design and safety assessment of the operational experience.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.