• 제목/요약/키워드: maintenance method

검색결과 4,435건 처리시간 0.031초

건설공사 비탈면 유지관리를 위한 보강공법별 점검항목에 관한 연구 (A Study on the inspection item classified by reinforcement method for the construction slope maintenance)

  • 김용수;장범수;신관영
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.759-764
    • /
    • 2005
  • With the tunnel to case of the construction slope it executes the periodic maintenance due to an objectivity standard. But, the standard connected with construction slope is not integrated with the important public paper organic enemy and it is duplicated and the standards which conflict are being scattered. Also, it is referred to some specifications simply and the feature which is diffuse appears. Therefore, there is a necessity which it investigates the problem point of the maintenance civil official and it improves rationally and it takes a triangular position a confusedly be standard system. In this research which it sees accomplished the fundamental research against the inspection item classified by reinforcement method for the construction slope maintenance.

  • PDF

방음벽의 유피관리 실태 및 개선방안에 관한 연구 (Actual Status and Improvement Method of Maintenance Management for Noise Barrier)

  • 김흥식;허영
    • 한국소음진동공학회논문집
    • /
    • 제13권7호
    • /
    • pp.570-576
    • /
    • 2003
  • Noise harriet Is used for noise reduction method of traffic noise. The length and the total cost of that are increased In this national area. But. a maintenance management of noise barrier is not systematic. and the guideline of that is not prepared for maintenance manual. The situations of existed installation and management of noise barriers Installed at 3.619 positions were investigated by questionnarie and direct field survey. And comparisons with foreign management guideline of noise harrier were carried out. The results show that the improvement methods of maintenance management system such as practical checklist and required Items for management of noise barrier were suggested.

퍼지 집합이론과 유전알고리즘을 이용한 일간 발전기 보수유지계획의 수립 (A Daily Scheduling of Generator Maintenance using Fuzzy Set Theory combined with Genetic Algorithm)

  • 오태곤;최재석;백웅기
    • 전기학회논문지
    • /
    • 제60권7호
    • /
    • pp.1314-1323
    • /
    • 2011
  • The maintenance of generating units is implicitly related with power system reliability and has a tremendous bearing on the operation of the power system. A technique using a fuzzy search method which is based on fuzzy multi-criteria function has been proposed for GMS (generator maintenance scheduling) in order to consider multi-objective function. In this study, a new technique using combined fuzzy set theory and genetic algorithm(GA) is proposed for generator maintenance scheduling. The genetic algorithm(GA) is expected to make up for that fuzzy search method might search the local solution. The effectiveness of the proposed approach is demonstrated by the simulation results on a practical size test systems.

An Introductory Study on Imperfect Maintenance Effect in Rolling Stocks

  • Kim, Jong-Woon;Han, Seok-Yun;Chung, Jong-Duk
    • International Journal of Railway
    • /
    • 제1권2호
    • /
    • pp.59-63
    • /
    • 2008
  • The maintenance effect is a peculiar factor applied to repairable systems such as rolling stocks. Conventional statistical analysis for failure times takes into account one of the two following extreme assumptions, namely, the state of the system after maintenance is either as "good as new" (GAN, perfect maintenance model) or as "bad as old" (BAO, minimal maintenance model). Most of the papers concerning the stochastic behavior of railroad systems assume two types of maintenance: perfect and minimal maintenance. However, Lee, Kim & Lee (2008) analyzed the failure data of a door system in Metro EMU and the effect of preventive maintenance was imperfect. It is seen that the imperfect maintenance is of great significance in practice. This article describes how to deal with the maintenance effect in reliability studies of rolling stocks. Maintenance policies under imperfect maintenance are described and the method is proposed to evaluate their performance.

  • PDF

창정비 요소개발 비용산정 방안에 대한 연구 (A Study On The Cost Estimation Of The Depot Maintenance Elements Development Project)

  • 김증기;최광묵;서혁
    • 한국국방경영분석학회지
    • /
    • 제31권2호
    • /
    • pp.45-59
    • /
    • 2005
  • As more advanced and complicated equipments are introduced, effective operation and maintenance, along with acquisition of the equipments, commands more significance lately. In order to perform effective depot maintenance, the Republic of Korea Army is continually developing the concept, cycle and method for operating the depot maintenance. Not only the high-cost testing and maintenance equipments but the highly developed maintenance technologies are required for the depot maintenance of the latest weapon system. In order to have the depot maintenance capability, this paper provides the standard and procedure for estimating the development cost of the depot maintenance elements to be utilized in the depot maintenance elements development project.

델파이 기법과 CMMI를 활용한 군 정비창 기술수준 진단체계 연구사례 (Research Case of Military Maintenance Depot Technology Level Diagnosis System Using Delphi Technique and CMMI)

  • 조지훈
    • 품질경영학회지
    • /
    • 제52권2호
    • /
    • pp.357-376
    • /
    • 2024
  • Purpose: The purpose of this study is to design an objective and comparable diagnostic system for diagnosing the technology level of military maintenance depots and verify its actual applicability. Methods: Literature Review, Capability Maturity Model Integration, Analytic Hierarchy Process. Results: Military maintenance depot maintenance quality level diagnosis items, Maintenance quality level by maintenance technology area, Guidelines for diagnosing maintenance quality level, Quality level comparison results by area and implications for improvement. Conclusion: In order to systematically evaluate the maintenance quality of military maintenance depots, this study was conducted with the goal of designing an overall maintenance quality diagnosis system, including diagnosis areas, diagnosis items, and a diagnosis score award system, by improving the existing evaluation method. In addition, the newly developed maintenance quality diagnosis system was applied to actual evaluation activities and the results were returned to members, confirming the usefulness of the developed maintenance quality diagnosis system in the field.

Application of Particle Swarm Optimization to the Reliability Centered Maintenance Method for Transmission Systems

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • 제7권6호
    • /
    • pp.814-823
    • /
    • 2012
  • Electric power transmission utilities make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability. The development of maintenance strategies for aged components is one of the more effective ways to achieve this goal. The reliability centered approach is a key method in providing optimal maintenance strategies. It considers the tradeoffs between the upfront maintenance costs and the potential costs incurred by reliability losses. This paper discusses the application of the Particle Swarm Optimization (PSO) technique used to find the optimal maintenance strategy for a transmission component in order to achieve the minimum total expected cost composed of Generation Cost (GC), Maintenance Cost (MC), Repair Cost (RC) and Outage Cost (OC). Three components of a transmission system are considered: overhead lines, underground cables and insulators are considered. In regards to aged and aging component, a component state model that uses a modified Markov chain is proposed. A simulation has been performed on an IEEE 9-bus system. The results from this simulation are quite encouraging, and then the proposed approach will be useful in practical maintenance scheduling.

성능보증제도를 적용한 일반국도 유지보수공사 시범사업 (Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance)

  • 임재규;김용주;김명일;이재준
    • 한국도로학회논문집
    • /
    • 제20권1호
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

LCC분석을 통한 궤도도상구조의 적정 유지관리수준 선정에 관한 연구 (A Study on Proper Maintenance Level Selection of Track Ballast Structures Using LCC Analysis)

  • 안국;이호열;추장식;박미연;임종권
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.232-237
    • /
    • 2008
  • Several research institutes including KISTEC and KRRI etc., recently, have studied maintenance activities and performance, in order to determine proper maintenance level and maintenance cost of rail tracks. But it may extremely difficult to make a decision in maintenance matters of concrete track and ballast containing other sub-components. For these reasons, this study investigate variables related to current maintenance, essential maintenance, and preventive maintenance. It is intended to suggest estimation method of proper maintenance cost maximizing rail track performance. It is stated that proposed approach may be very useful to make a decision of proper maintenance level. Typical section of rail track is applied for calculation of life cycle cost according to each maintenance strategy. A proper profile for maintenance is determined minimum life cycle

  • PDF

철도전기설비의 최적점검주기에 관한 기초연구 (Study on a Optimal Inspection Cycle of Electrical facility of Railroad)

  • 추철민;김재철;이희태;안재민;문종필
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 춘계학술대회 논문집
    • /
    • pp.224-228
    • /
    • 2007
  • It is focused on a methodology to establish a optimal inspection cycle of electrical facility of railroad Decision method of optimal inspection cycle is a process which establishes maintenance plan for facilities' immanent function as using reliability theory in operation term In order to ensure normal operation in a given condition, the decision method is logical for selecting effective maintenance plan to consider characteristic of system In estimation of failure rate, critical facility is selected firstly. After that, proper distribution function on each facility is decided to investigate distribution function for extraction of failure rate. Next, cost produced by the case that facility's failure is occurred is surveyed. Finally, maintenance method developed until now is investigated, before suitable model for the facility applying maintenance method is developed, and that maintenance decision is made. Therefore, this process is the method to find optimal inspection cycle for reasonable cost and effective reliability on facility.

  • PDF