• 제목/요약/키워드: maintenance and repair cost

Search Result 325, Processing Time 0.041 seconds

Analysis for the Economic efficiency of District Heating and Gas Engine Co-generation System comparing with Central Heating System (중앙난방방식을 지역난방.소형열병합난방방식으로 전환시의 경제성 비교 분석)

  • Kim, Kyu-Saeng;Lee, Sang-Hyeok;Hong, Kyung-Pyo;Won, Young-Jae
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.459-465
    • /
    • 2007
  • This study was conducted to calculate the LCC of a apartment complex with a type of heating system, district heating and cogeneration system. For the purpose of analyzing LCC according to size of apartment complex, 500, 1,500 and 4,000 houses of model apartment selected. This research performs design of heating system and the life cycle cost analysis including an initial cost, energy cost, maintenance and operation cost, replacement cost and renovation cost during the project period(15years). According to the calculated results, 1) Initial cost of cogeneration system with 500, 1500 and 4000 houses is higher than district heating system each of 20%, 13%, 12%. 2) In case of cogeneration system, the payback period by electric generation is 5.21, 4.92 and 4.47 years and saving cost was calculated 29 billion won, 94 billion won and 262 billion won after payback period. 3) Cogeneration system LCC was 1.12, 1.07 and 1.06 times larger than district system with the size of apartment complex. According to the case of this study district heating system is more efficient than cogeneration system in terms of the reduction of LCC. 4) Gas Engine Co-generation System is more efficient than other systems because it can collect progressive part from electric charge progressive stage system. However, the efficiency is decreasing because of raising of fuel bills(LNG) and lowering of power rate for house use. Especially the engine is foreign-made so the cost of maintenance and repair is high and the technical expert is short. 5) District heating is also affected by fuel bills so we should improve energy efficiency through recovering of waste heat(incineration heat, etc.). Also, we should supply district cooling on the pattern of heat using of let the temperature high in winter and low in summer.

  • PDF

Preliminary Review of On-Site Clamping Repair Technology for Welding Part Leakage of Safety Related Valve in the Nuclear Power Plant (원전용 안전등급 밸브의 용접부 누설 클램핑 현장보수 기술 검토)

  • Ki Hong Kim;Ki Su Kim;Hwan Seok Jung;Moo Kyung Jang
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.19 no.1
    • /
    • pp.52-59
    • /
    • 2023
  • The welding part of the valve needs immediate action when leakage occurs due to cracks or damage. In order to repair leakage of the welding part, the valve must be separated from the pipe or replaced with a new valve. However, it is difficult to remove the valve while operating the power plant. This study presents a method to remove leakage by precisely processing the gap between the clamp and the incision part within 0.1mm while installed in the pipe system. If the external leakage is removed using a clamp on the welding part without removing the valve during operation, the time and cost required for maintenance can be reduced.

A Study on the PC-Based Motion Controller Design for Multi-Axis Control (다축 제어용 PC-Based Motion Controller 설계에 관한 연구)

  • 안호균
    • Proceedings of the KIPE Conference
    • /
    • 2000.07a
    • /
    • pp.641-644
    • /
    • 2000
  • Recently As the performance of the personal computer has been improving rapidly lots of research for the pc-based numerical computer actively progress in an easy repair maintenance and improving the performance with less cost. This paper presents the design using complex programmable logic device(CPLD). The CPU of Motion Controller that function as the real time control of the independent multi-axis motion the error-detect module and external I/O control made use of 80C196KC, In this paper The PC-NC effectively distributed to the load of NCK(numerical computer kernel) and have the advantage of high speed and precision.

  • PDF

A Study on the Techniques of Preservation Technology in the Brick Structure of Modern Architectural Properties (근대건축문화재의 벽돌조 건축물 보존기술 기법에 관한 연구)

  • Woo, Nam-Sic;Kwon, Soon-Chan;Kim, Tai-Young
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.1
    • /
    • pp.37-44
    • /
    • 2011
  • The maintenance works for brick-structured buildings are a new field in Korea, and practical cases are yet inadequate so that such works may cause adverse effects of damaging the buildings after all. Therefore, this study has extracted a preservation technology believed to be most desirable in minimizing the damage to the original state of the buildings and preserving the value as the cultural assets through maintenance work details from 1986 to 2010 regarding brick-structured buildings designated as cultural properties. Firstly, a brick replacement method of using the brick used at the time of construction is efficient in replacement and repair of brick material for preserving value of cultural assets and minimizing damage of the original form. Secondly, use of lime mortar through material analysis is effective in repair of masonry joint and mortar but it is not used often due to high experimental cost. Finally, reinforcement of structure using a form for a building with severe damage is most efficient when considering additional problems. However, damage on the original form of a building can be minimized and value of a building can be preserved only when consideration on sufficient case analysis, materials to be used, and conditions of a building is supported.

A Study on the Technology and Economic Feasibility of Surface Waterproofing System in Underground Concrete Structures. (지하 콘크리트 구조물 외부 방수공법의 기술성 및 경제성에 관한 연구)

  • 임채중;배문옥
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.699-706
    • /
    • 2001
  • Waterproofing materials should be expected to last the life of the structure. An approximate life cycle cost should be to compare different materials based on initial and periodic repair / maintenance costs. Waterproofing applicators like materials that are easy to set up and clean up. The designer should choose a material that can be applied in almost all conditions. Design Professionals should specify independent inspection on critical jobs or in all cases where the budget permits. The basic causes of defection occurred during construction should be minimized.

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF

Developing the Optimal Decision-Making Process through Preventive Maintenance Policy Based on the Reliability Threshold for Leased Equipment (대여장비의 신뢰도 기반 예방보전 정책을 통한 최적 의사결정 과정 개발)

  • Bae, Kiho;Lee, Juhyun;Park, Seonghwan;Ahn, Suneung
    • Journal of Applied Reliability
    • /
    • v.17 no.3
    • /
    • pp.246-255
    • /
    • 2017
  • Purpose: This study proposes the optimal PM (preventive maintenance) policy of leased equipment for lessee's decision-making using two types of reliability condition. Methods: We consider reliability threshold based PM model. Equipment reliability is estimated and used as condition variable. The effect of repair for maintenance is imperfect and represented by age reduction factor. Results: We provide two PM policies. Policy 1 is focused on minimized total cost. This policy guarantees reliability threshold until last maintenance action. Policy 2 focus on maintaining reliability threshold during leased period. The proposed approach provides optimal reliability threshold under number of PM. Through result, we finally construct decision-making process for lessee using reliability threshold and end of reliability. Conclusion: This study provides two PM policy for lessee's decision-making. Through numerical example, we get a result of optimal reliability threshold, number of PM, optimum alternative under lessee's reliability condition.

A Case Study on the Life Cycle Cost Analysis of Steel Box Girder and Prestressed Concrete Box Girder Bridge (Steel Box교와 PSC Box교의 LCC 분석에 관한 사례연구)

  • Ahn Jang-Won;Cha Kang-Suk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.59-67
    • /
    • 2001
  • The purpose of this study is to evaluate economics by the Life Cycle cost(LCC) analysis of Steel Box Girder and Prestressed Box Girder bridge types. The study has been performed as a case study. A questionnaire survey for the repair and replacement cycle has been done in order to predict operation and maintenance costs. For LCC analysis and comparison, the present value technique is used. The results of this study are summarized as follows: (1) A LCC analysis model of Steel Box Girder and Prestressed Box Girder bridge types is suggested through a case study. (2) The repair and replacement cycle of elements of them are investigated using a questionnaire survey. (3) As a result of LCC case study, the type of Prestressed Box Girder bridge is analyzed more economic than Steel Box Girder.

  • PDF

Optimal Life-Cycle Cost Design of Steel Box Girders (강박스 거더의 생애주기비용 최적설계)

  • Shin Yung-Seok;Park Jang-Ho;Lee Hyun-Sub;Ahn Ye-Jun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.18 no.4 s.70
    • /
    • pp.445-452
    • /
    • 2005
  • This paper presents a design method to minimize Life Cycle Cost (LCC) of steel box girders. The LCC considered in this paper includes initial cost, expected life-cycle maintenance cost and repair cost. A load carrying capacity curve is derived from a condition grade curve of steel girders and load tarrying capacity that is measured in safety diagnostic test. And then, optimal design of steel box girders is performed on the basis of load carrying capacity curve. In this paper time and number of times for repair of steel girders are determined based on the calculated load carrying capacity curve. Also, annual costs considering real discount rate are compared and analyzed in various cases. It is concluded that the optimal design of steel box gilders considering LCC by the presented method will lead to more economical and safer girders than conventional design.