• Title/Summary/Keyword: maintenance & repair

Search Result 1,080, Processing Time 0.028 seconds

Applying SeqGAN Algorithm to Software Bug Repair (소프트웨어 버그 정정에 SeqGAN 알고리즘을 적용)

  • Yang, Geunseok;Lee, Byungjeong
    • Journal of Internet Computing and Services
    • /
    • v.21 no.5
    • /
    • pp.129-137
    • /
    • 2020
  • Recently, software size and program code complexity have increased due to application to various fields of software. Accordingly, the existence of program bugs inevitably occurs, and the cost of software maintenance is increasing. In open source projects, developers spend a lot of debugging time when solving a bug report assigned. To solve this problem, in this paper, we apply SeqGAN algorithm to software bug repair. In detail, the SeqGAN model is trained based on the source code. Open similar source codes during the learning process are also used. To evaluate the suitability for the generated candidate patch, a fitness function is applied, and if all test cases are passed, software bug correction is considered successful. To evaluate the efficiency of the proposed model, it was compared with the baseline, and the proposed model showed better repair.

Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants (원자력발전소 전기기기의 보수, 교체 방법론)

  • Park, Chulhee;Park, Wan-gyu;Lee, Manbok;Kim, Choon-sam
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF

Analytical Modelling for Recarbonation Process of Concrete Repaired with Patching Repair Material (단면복구재로 보수된 콘크리트의 재탄산화 과정에 대한 분석적 모델링)

  • Do, Jeong-Yun;Kim, Doo-Kie;Song, Hun;Jo, Young-Kug
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.89-96
    • /
    • 2010
  • This study presented the analytical evaluation model effective in the concrete structure repaired with a patching material. The model considered the effect of the repair material on carbon dioxide penetration into the repaired concrete as evaluating the remaining service life of the CO2-deteriorated concrete structure after repair. The diffusion profiles of carbon dioxide as well as the carbonated concrete were effectively able to be modelled with analytical method based on Fick's 1st diffusion law. The evaluation of the model equation showed the good result and rational process quantitatively and numerically to evaluate the remaining service life of the repaired concrete structure after repair.

An Experimental Study on the Quality and Crack Healing Characteristics of Repair Mortar Containing Self-Healing Solid Capsules of Crystal Growth Type (결정성장형 자기치유 고상캡슐을 혼합한 보수 모르타르의 품질 및 균열 치유 특성에 관한 실험적 연구)

  • Oh, Sung-Rok;Kim, Cheol-Gyu;Nam, Eun-Joon;Choi, Yun-Wang
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.1
    • /
    • pp.59-66
    • /
    • 2020
  • In this study, self - healing solid capsules of crystal growth type which can be mixed directly with repair mortar were prepared, and the quality and crack healing performance of repair mortar with self - healing solid capsules were evaluated. The table flow and the air flow rate of the repair mortar material mixed with self-healing solid capsules were found to have no significant influence on table flow and air volume regardless of mixing ratio. Compressive strength tended to decrease with increasing capsule mixing ratio. As a result of evaluation of crack healing properties according to constant water head permeability test, initial water permeability decreased, and reaction products were generated over time and cracks were healed.

Estimation of Residual Strength for an Aged Floating Dock (노후화된 플로팅도크의 잔류 구조강도 평가)

  • Seo, Kwang-Cheol;Hong, Taeho;Park, Joo-Shin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.1
    • /
    • pp.122-129
    • /
    • 2019
  • Due to its nature the manufacturing industry faces a cyclical economy, and therefore there is an urgent need for a companion industry to cope with this cyclic pattern in the long run. The sector suitable for meeting this demand is the repair and shipbuilding industry. In order to operate a shipbuilding repair business, a floating dock is indispensable, and most obsolete floating docks were imported from overseas and operated through repair/maintenance. However, there is no precise guideline for floating dock safety, and most models have been in use for at least 30 years without being required to enter classification at the time of operation. In this study, structural strength analysis was carried out using measured thickness information of aged floating docks, and the residual structural strength of floating docks in operation was analyzed. The main results derived from this study can be referred to as guidelines for the review of the structural safety of similar equipment, and it is expected that an optimal solution will be found within a short time using this method for repair/maintenance.

An Experimental Study on the Performance Evaluation of Repair Method of RC Structure Using Fire Resistance Engineered Cementitious Composites(FR-ECC) (고인성 내화·보수 모르타르를 활용한 RC구조물 보수공법의 성능평가에 관한 실험적 연구)

  • Kim, Jeong-Hee;Kim, Jae-Whan;Park, Sun-Gyu;Kwon, Young-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.6 s.58
    • /
    • pp.88-96
    • /
    • 2009
  • In this Study, FR-ECC(Fire Resistance Engineered Cementitious Composites) in which at same time it can improve the endurance and fire-resistance efficiency of a Structure was developed, and the experimental study such as thermal characteristic, Fire-resistance efficiency, and etc was performed for using FR-ECC as the repair materials for building and civil Structure. Moreover, it was evaluated about the field applicability of FR-ECC. As a result, FR-ECC is superior to the existence fire resistance repair mortar in strength and durability property. Also, FR-ECC was exposed to have the characteristic of being excellent than existence fire resistance mortar in the field applicability.

Analysis of the Breakdown repair time of the Building Components in Public Rental-Housing Types (공공임대주택 유형별 부재의 사후보전 수선시기 설정연구)

  • Lee, KangHee;Ahn, YoungHan;Chae, ChangU
    • KIEAE Journal
    • /
    • v.13 no.6
    • /
    • pp.129-136
    • /
    • 2013
  • The rental housing has played a key role to supply a decent living space for the low-income households. The owner of the rental housing should maintain and manage the building physical condition. On the other hand, rents should use the housing without any damage and pay a certain fare for the rent. A rent is classified into two types : private and public. The public rent is mainly to supply a living space for non-available home owner with a low-rent fare. Many of public rent are built and supplied by the public institution or local government. The supplier would take a responsibility to maintain the building and components, reflected by the maintenance plan and repair scope. In this paper, it aimed at providing the repair time in building components of the public rental housing such as lighting, electrical cable, paintings and etc.. The repair time is analyzed with three calculation methods which are solved by the probability and empirical approach. Results are as follows : First, the repair time of the electrical facilities are maintained with 11yr, 10yr and 7 in permanent, public and redevelopment rent respectively. The roof proof has a repair time with 14yr, 11yr and 8 in permanent, public and redevelopment rent housing respectively. Second, Most of the components has a prior length of the repair time in permanent, public and redevelopment rent sequently. There is a difference in repair time according to the rental types. Therefore, it would continue to research the difference in aspect of the living style, building physics, living consciousness and etc.

A Study of Optimal Maintenance Schedules of a System under the Periodic Inspection Policy (주기적인 검사 정책하에서 최적예방 교체시기 결정에 관한 연구)

  • 정현태;김제승
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.263-271
    • /
    • 1997
  • This paper presents a preventive maintenance model for determining the preventive replacement period of a system in which a failure rate is affected by the cumulative damage of fault and inspection. Especially, the failure rate function is considered to be a function of the cumulative damage of the fault and inspection time. Types of replacement considered are preventive replacement and failure replacement. Failure rate and expected cost function between replacement are derived. An optimal policy is obtained that minimizes the average cost per unit time for preventive replacement, failure replacement, inspection and repair.

  • PDF

Development of CMMS for the real-time CBMS (CMMS(Computerized Maintenance Management System)의 실 시간적인 CBMS(Condition Based Maintenance System) 연구)

  • 박주식;박재현;강경식;이광배
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.4
    • /
    • pp.1-8
    • /
    • 2000
  • Equipment and machine of industrial plant are give effect to mechanical-stress of many working-stop or long time operating. Therefore, to be old and decrepit of every king of equipment. As long time operating equipment period into increase conservation and of repair equipment time is efficacious necessity of utility factor gradually that of productivity of diminution and complete equipment expense of increase. Conservation at special skill working and necessity is that will effectually and complete a period prevention management diagnosis can conservation point at issues at in advance.

  • PDF

Recent Advances In Burn-in

  • Na Myung Hwan;Son Young Sook;Cha Ji Hwan
    • Communications for Statistical Applications and Methods
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2005
  • Burn-in is an engineering method which is used to eliminate early failures of products or systems after they have been produced. Recently, various models for determining optimal burn-in times have been developed, where some preventive maintenance policies were considered together with burn-in problem. In this paper, a survey of recent research in burn-in is undertaken.