Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage (건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석)

  • Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

The Analysis of Current Daily-Report System and The Proposal of Improvement Framework (작업일보 현황 분석에 따른 개선방향 제시)

  • Kim Bong-nyoun;Kim Chang-Duk;Ee Hyun-Soo;Kim Sun-Kuk;Seo Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.66-73
    • /
    • 2003
  • Building construction projects are performed by a number of sub-contractors specialized in diverse trades. Therefore information management among these constituents is quite challenging especially due to exponentially increasing manpower and material resources. In recognition of the importance of information management in project sites a number of systems have been suggested, but the application is limited one of the main reason is that general contractors use these systems and sub-contractor's participation understanding and financial ability are limited. Besides other problems such as loss along communication channel, distortion of information due to inefficient input device and tremendous amount of time and labor are required for collection analysis, and management of information to prepare a daily-report. Therefore the Purpose of this study is to improve reporting process through analyzing current daily reporting system. This paper also suggests the direction of the improved daily reporting system to enhance the performance of construction projects through incorporating sub-contractor's participation in daily reporting system.

Directional Analysis on Intellectual Capital Indicators of Contract Foodservice Management Company in the Viewpoint of Contractor, Client, and Customer (위탁급식전문업체, 고객사, 고객 측면에서 위탁급식업의 지적자본 지표간 인과관계 분석을 통한 다자간 활용도 탐색)

  • Park Moon-Kyung;Yang Il-Sun
    • Journal of Nutrition and Health
    • /
    • v.38 no.9
    • /
    • pp.765-776
    • /
    • 2005
  • The purposes of this study were to a) examine IC (intellectual capital) circumstance of CFMC (contract foodservice management company), b) identify the correlation between IC of CFMC, c) analyze the cause and effect of IC in the viewpoint of contractor, client, and customer. The questionnaires of IC measurement were handed out to 108 CfHCs, there composing of main office employees, foodservice managers, customers, and clients of 207 school, 38 hospital, and 86 business/industry foodservices. The statistical data analysis was completed using SPSS Win (ver 12.0) for descriptive analysis, correlation analysis, simple linear regression analysis. First, CFMCs had operational experience for an average of 8 years and 8 months, and served an average of 38,540 meals a day. Most of the respondent companies operated 'food supply/distribution($50\%$)', 'catering ($46.7\%$)', and restaurant business ($43.3\%$)' except for institutional foodservice and managed an average of 66 clients for the contract period of 2 years and 3 months. Second, there was positive correlation between $\ulcorner$sales of foodservice$\lrcorner$ and 'market ability', $\ulcorner$client satisfaction$\lrcorner$ and necessary intellectual capital for managing branch/chain foodservice office, and $\ulcorner$customer satisfaction$\lrcorner$ and $\ulcorner$renewal and development$\lrcorner$, 'market ability', 'infrastructure support for foodservice operation', 'employee satisfaction', respectively. Finally, the result of the cause and effect analysis on CFMCs, clients, and customers was positively influenced by 'client satisfaction' with 'customer satisfaction', 'infrastructure support for foodservice operation' and 'customer satisfaction' with 'employee satisfaction', and 'infrastructure support for foodservice operation'. In conclusion, if CFMCs were to perform a routine checkups by utilizing CFMC's IC measuring tool, improvements in CFMC operational capacities as well as foodservice quality can be noted. Additionally, CFMCS can satisfy their client-customer relationship by employing internal marketing thechniques for employee, a more efficient infrastructure support system, and construc tive infrastructure utilization. Therefore, CFMCs can show significant improvement in their sales and foodservice quali-ty though continuous maintenance of the client and customer satisfaction.

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

해양 설비 시장에 관하여

  • Cho, Kab-Rae
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.10a
    • /
    • pp.5-11
    • /
    • 2003
  • This paper present a review of trends in world energy demand and a close outlook over the offshore market, especially in deepwater developments. The market requirements, characteristics and risks involved in the contract type of offshore projects are explained, followed by the strategic approaches of Korean main yards along with, the HHI's development and introduction of innovative construction methodologies to be a competitive contractor.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service. (프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토)

  • Lee, Chang-Hee;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

A Study on the Optimization Effectiveness of Risk Assessment in Construction Industry (건설업 위험성 평가 실효성을 위한 최적화 연구)

  • Paek, Chung Hyeun;Cho, Ur Ryong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.15-22
    • /
    • 2015
  • The risk assessment carried out on the construction site at the beginning of the implementation depends on the subjective judgment of risk of general contractor and subcontractors, whose opinion about frequency and intensity of risk is different. In this paper, research the awareness of general contractors and subcontractors about process of risk assessment at the construction site and its effectiveness. Researching of the main factors "frequency", "intensity" which determines the degree of risk gives the opportunity to find an option for improving the effective implementation of risk assessment.

System Dynamics Approach to Progress Payment Regulations

  • JeongHoon Lee;Moonseo Park;Hyun-Soo Lee;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.181-187
    • /
    • 2013
  • The construction market condition is getting worse because of global constructions slow down, low profit, market contraction and so on. For these reason, most construction companies depend on public construction projects which possible to protect construction fee, known as progress payment, by laws. Despite this law, problems of progress payment are constantly occurring and it has been main factors that hinder the construction cost's cash-flow in construction project. To solve this problem, many researchers suggested various solutions but most of solutions were focused on specific target as owner, general contractor, and subcontractor. So, most of solutions were insufficient consider about interaction between contractors. Because of these reasons, it was hard to reflected policy. This research aimed to use system dynamics to develop the model for the application and payment based on the regulations and papers. Also, performed a developed model's verification based on progress payment regulation's basic objectives.