• Title/Summary/Keyword: long-term cost

Search Result 994, Processing Time 0.038 seconds

Impact Assessment of Vegetation Carbon Absorption and Economic Valuation Under Long-term Non-executed Urban Park Development (장기미집행공원 개발에 따른 도시 식생 탄소 흡수량에 미치는 영향 및 경제적 가치 평가)

  • Sung, Woong-Gi;Choi, Jae-Yeon;Yu, Jae-Jin;Kim, Dong-Woo;Son, Seung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.361-371
    • /
    • 2020
  • Since the implementation of the sunset law in 2020, concerns have been raised over the reckless development of long-term non-executed urban parks. In this study, the FSDAF method and CASA-NPP model were used to evaluate the annual average NPP of long-term non-executed urban parks in Seoul. Based on this, the carbon loss and economic value were assessed under five development scenarios. The total NPP value of long-term non-executed urban parks, except for the greenbelt area in Seoul, was 4,892.18 t C. In the first scenario, the NPP and cost were 4,892.18 t C of vegetation carbon and 1.18 billion won, 2,548.55 t C of vegetation carbon and 615 million won in the second scenario, 238.94 t C of vegetation carbon and 58 million won in the third scenario, 848.38 t C of vegetation carbon and 205 million won in the fourth scenario, and 1,596.00 t C of vegetation carbon and 385 million won in the fifth scenario. These results are meaningful for evaluating vegetation carbon and economic value loss according to five different development scenarios. The results of this study are expected to be useful for the preparation of measures to minimize the impact of the development of long-term non-executed urban parks.

Minimum Floor Area Ratio Estimation Model for Reconstruction Projects to Compensate for Loss of the Aged Long-term Public Rental Housing (노후 장기공공임대주택 손실보전을 위한 재건축사업의 최소용적률 수리모델)

  • Joe, Wongoog;Na, Seunguk;Cho, Jeaho;Chae, MyungJin;Son, Bosik;Kim, Hyunsoo;Chun, JaeYoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.108-116
    • /
    • 2022
  • Started in 1989 as Public Permanent Rental Housing scheme, public rental housing lease policy is increasing target residents and supply in each government by introducing new supply types. However, public housing business entities have difficulties in expanding the supply due to cumulated deficit. The research suggested long-term public rental housing reconstruction business as a method to preserve the cumulated deficit from the previous. Minimum floor area ratio mathematical model was suggested by defining the floor area ratio of reconstruction business as minimum, since housing sales profit after reconstruction could preserve aggregated deficit, and mathematically approached by considering the traits of long-term public rental housing reconstruction. The determinant for minimum floor area ratio mathematical model comprise cumulated deficit of the existing long-term public rental housing, land size of reconstructed sale housing, housing sales price per unit area, and business cost per unit area. Minimum floor area ratio mathematical model is expected to be the milestone for supporting decision making regarding the economic part of old long-term public lease housings' reconstruction scale, and expanding housing supply within urban area.

Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects (공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안)

  • Baek, Seung-Ho;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.108-114
    • /
    • 2012
  • Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.

Comparison of Predicted Maintenance Costs and Actual Maintenance Cost of Military Facilities - Focused on BTL Project - (병영 시설물 수선유지비용 예산대비 실투입 비교에 관한 연구 - BTL사업 중심으로 -)

  • Lee, Don-Soo;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.473-481
    • /
    • 2017
  • With the barracks modernization project, the Ministry of National Defense has been operating 60 projects of the 75 that have been announced. It was difficult to investigate and analyze the data in the past because data could not be obtained while it was much easier to do that since data can be obtained from private companies. With the aim of increasing the usability of the facilities, the objective of this study is to present a reasonable alternative for repair and maintenance costs by investigating and analyzing the budget and the actual expenses of repair and maintenance of military facilities for the past 3 to 5 years, and then identifying the problems with these. To accomplish this, a theoretical review of previous studies and legal grounds related to repair and maintenance costs was performed, and data on the estimates and the actual expenses data used in BTL projects carried out by private companies were analyzed. First, one of the problems was that there are some items omitted, including consumables, and these items should be included in order to secure their budget. Second, in terms of the items for divided payments, two improvements had been presented: a short-term payment plan for the operation period of 3 to 5 years and a long-term payment plan for an additional and complemented period other than the operation period. The repair and maintenance costs should be further studied at the point of time in a future when the actual data on the costs and operation period of military facilities can be secured. This study is expected to serve as empirical data that will form the basis for a reasonable calculation of the construction cost for military facilities.

The Role of Intensity Modulated Radiotherapy in Cancer Treatment

  • Cheung, Kin-Yin
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.6-8
    • /
    • 2002
  • Intensity modulated radiotherapy (IMRT) is an advanced but expensive form of 3-dimensional conformal radiation therapy technique. While the initial clinical data appear to be promising for some treatment sites, the cost effectiveness of the treatment modality has yet to be justified by long-term clinical outcome. This presentation reviews the potential efficacy and limitation of IMRT in respect of the practicality, dosimetry, and resource aspects. It tries to explore and draw conclusions on the strategies for using this sophisticated and expensive treatment technique from AFOMP perspective.

  • PDF

The Subway Construction Design of Japan (일본의 지하철 건설설계실례)

  • Keik Ito;takaguki Sasanuma
    • Explosives and Blasting
    • /
    • v.9 no.2
    • /
    • pp.8-12
    • /
    • 1991
  • The Land price in Tokyo Vicinity was, increased 65.3% than Last year. so, it trend to get Subway constructed in deeper Underground. But, the subway Construction Cost is more increaseel beeause it is needed long works term, all modernized facilities beside that, deeper subway cocstruction works brought another task such as deeper entrance shaft sinking, Ventilation escapeway, all Underground water Treatment. In addition, Civil Act must be also amended became at Present landowner covers ground and Underground.

  • PDF

Reliability Sampling Plans for Lot Assurance (신뢰성 로트보증 샘플링 검사방식)

  • 김종걸;전봉룡
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.145-151
    • /
    • 2004
  • Reliability assurance problem is an important issue in advanced company with good R&D capacity. In Korea, long-term and large-scale project for reliability improvement and certification have been conducted from 2000, 4 years ago. Generally, assurance is composed of system assurance and lot assurance. For reliability lot assurance. it is prerequisite to development reliability sampling plan with time-saving and minimum cost. In this paper, we aim to investigate previous study on reliability lot assurance focused on reliability sampling plans and propose some suggestions for the future study.

  • PDF

Reliability Evaluation for Photovoltaic Modules (태양전지 모듈의 신뢰성 평가)

  • Tanaka, Hirokazu;Kim, Keun-Soo
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.19 no.2
    • /
    • pp.1-5
    • /
    • 2012
  • Long-term reliability of Si photovoltaic modules is a crucial issue for the cost-reduction on the power-supply system. To elevate this reliability, several environmental tests have been created as qualification and certification procedures. This paper gives an overview about recent researches of reliability tests for Si photovoltaic modules.

Estimation of Life Expectancy and Budget Demands based on Maintenance Strategy (도로포장 유지보수 전략에 따른 기대수명과 보수비용산정)

  • Han, Dae-Seok;Do, Myung-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.345-356
    • /
    • 2012
  • Road pavement requires repetitive maintenance works to maintain satisfactory service level to the public. However, the repetitive maintenance works upon deteriorated pavement structure make negative effects to deterioration speed. It often leads to inefficient use of limited budget. For that reason, the pavements require reconstruction work to recover their original performance. Recently, construction demands in the Korean national highway have already been reached to maximum level, and the aged pavements start to demand much more reconstruction works. However, in the real world, road agencies have often been confused when they determine maintenance design for such aged road sections due to budget constraint. It is because there is no reliable long-term maintenance strategy that supports their decision making. To support their decision making, this paper aimed to suggest the best maintenance strategy considering changing process of pavement performance by repetitive maintenance works. As an analysis method, probability distribution and hazard function to estimate the life expectancy were adopted, and then the results were used for long-term life cycle cost analysis with deterministic or Monte-Carlo method under various scenarios. As an empirical study, the Korean national highway data that has long-maintenance history data since 1986 has been applied. Last, this paper considered quality assurance of maintenance work to improve maintenance quality. These could be important information as a part of long-term maintenance strategy of pavement.