• Title/Summary/Keyword: logging operation

Search Result 63, Processing Time 0.032 seconds

A Case Study on Efficiency Analysis of Cable Logging Operation in Korea (국내 가선집재 작업의 효율성 분석에 관한 사례연구)

  • You, JoungWon;Han, Hee;Chung, JooSang
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.35-44
    • /
    • 2019
  • The objectives of this study were to identify engineering problems in the design and installation of cable logging operation that affects productivity through case study of actual logging sites, and to analyze associated productivity loss and increased cost. As a result of the study, when the geographic conditions and engineering safety of the site are not sufficiently considered, deflection of the cable line can not be secured. Hourly productivity of the operation decreased to 65% and the logging cost increased by more than two times compared to the productive yarding operation, which lowered overall efficiency of the operation. Thus, it is required to spread filed technologies that minimize unnecessary production cost incurred due to the in-efficient logging operations as well as secure work safety and efficiency to expand cable logging operation throughout the country.

An Analysis of the Operational Cost in the Whole-tree and Cut-to-Length Logging Operation System (전목 및 단목 집재작업시스템에서 작업비용 분석)

  • Kim, Min-Kyu;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.2
    • /
    • pp.229-238
    • /
    • 2013
  • This study was conducted to analyze on the operational cost of logging operations in the whole-tree logging operation system by tower-yarder and swing-yarder, and in the cut-to-length logging operation system by excavator with grapple in order to spread efficient logging operation technique and to establish the logging operation system. In the results of the analysis of operation cost, in case of the whole-tree logging operation system, the operation cost was 2,099 won/$m^3$ in felling by chain saw, 28,286 won/$m^3$ in yarding by tower-yarder, 18,265 won/$m^3$ in yarding by swing-yarder, 18,939 won/$m^3$ in bucking by excavator with grapple and chain saw, 20,484 won/$m^3$ in forwarding and accumulation by wheel type mini-forwarder, 12,701 won/$m^3$ in forwarding and accumulation by excavator with grapple and small forwarding vehicle. In case of the cut-to-length logging operation system, the operation cost was 10,160 won/$m^3$ in felling and bucking by chain saw, 7,567 won/$m^3$ in cut-to-length extraction by excavator with grapple, 6,982 won/$m^3$ in branches and leaves extraction by excavator with grapple, 3,040 won/$m^3$ in the operation road construction by excavator with grapple, 20,484 won/$m^3$ in forwarding and accumulation by wheel type mini-forwarder, 12,701 won/$m^3$ in forwarding and accumulation by excavator with grapple and small forwarding vehicle.

Analysis of Policy and Status of the Logging Operation System for Forest Biomass (산림바이오매스 이용을 위한 임목수확작업시스템의 현황 및 정책 분석)

  • Park, Sang-Jun
    • Journal of Environmental Science International
    • /
    • v.29 no.2
    • /
    • pp.155-166
    • /
    • 2020
  • This study was conducted to analyze the current situation of the logging operation system and to suggest an effective policy plan to secure important raw materials for the use of forest biomass. The dissemination of forestry mechanization and the establishment of the logging operation are important tasks to establish a system and reduce costs of timber production by increasing the use of forest biomass; this includes increasing the supply of timber for domestic products and increasing the production of wood chips and wood pellets. In particular, the efficiency of steep-slopes catenary system machinery for yarding such as tower-yarder and swing-yarder should be urgently supplied to cope with forest production and supply of forest biomass energy resources. In addition, it is necessary to continuously promote the dissemination of high-performance forestry machinery as is being done in Japan. At the same time, instead of distributing or retaining the spread of forestry machinery to the state and local governments, it is necessary to distribute timber production work centered on forest cooperatives or private timber producers to be carried out by wood producers, forest cooperatives and individuals.

An Analysis of the Operational Time and Productivity in Whole-tree and Cut-to-Length Logging Operation System (전목 및 단목 집재작업시스템에서 작업시간 및 공정 분석)

  • Kim, Min-Kyu;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.3
    • /
    • pp.344-355
    • /
    • 2012
  • This study was conducted to analyze on the operational time and productivities of logging operations in whole-tree logging operation system by tower-yarder and swing-yarder, and in cut-to-length logging operation system by excavator with grapple in order to establish the efficient logging operation system and to spread logging operation technique. In the analysis of operational time, in case of whole-tree logging operation system, the felling time was 46.6 sec/cycle by chain saw, the yarding time was 480.6 sec/cycle by tower-yarder, the yarding time was 287.4 sec/cycle by swing-yarder and the bucking time was 155.14 sec/cycle by chain saw. In case of the cut-to-length logging operation system, the felling and bucking time was 225.65 sec/cycle by chain saw, the cut-to-length extraction time was 4,972 sec/cycle by excavator with grapple, the branches and leaves extraction time was 3,143 sec/cycle by excavator with grapple. The forwarding time was 4,688 sec/cycle by wheel type mini-forwarder, the forwarding time was 2,118 sec/cycle by excavator with grapple and small forwarding vehicle. In the analysis of operational productivities, in case of whole-tree logging operation system, the average felling performance was $57.89m^3/day$ by chain saw, the average yarding performance was $20.3m^3/day$ by tower-yarder, $31.55m^3/day$ by swing-yarder respectively, the average bucking performance was $20.3m^3/day$ by chain saw. In case of the cut-to-length logging operation system, the average felling and bucking performance was $11.96m^3/day$ by chain saw, the average cut-to-length extraction performance was $34.75m^3/day$ by excavator with grapple, the average branches and leaves extraction performance was $37.66m^3/day$ by excavator with grapple, the average length of operation road construction was 73.8 m/day by excavator with grapple. The average forwarding performance by wheel type mini-forwarder and the average forwarding performance by excavator with grapple and small forwarding vehicle was $15.73m^3/day$ and $65.03m^3/day$, respectively.

Analyzing the Comparative Economic Efficiency of Short-wood Woodgrab Logging and Whole-tree Cable Logging Operations (Woodgrab을 이용한 단목집재와 가선집재방식에 의한 전목집재의 경제적 효율성 비교분석)

  • Seol, Ara;Han, Hee;Jung, Yoonkoo;Chung, Hyejean;Chung, Joosang
    • Journal of Korean Society of Forest Science
    • /
    • v.105 no.2
    • /
    • pp.231-237
    • /
    • 2016
  • This research was conducted in order to examine whether the Woodgrab short-wood logging method, most widely used logging method in Korea, is more favorable than other logging methods in terms of productivity and profitability. For the comparative purposes, whole-tree logging methods with cable yarding system using a swing yarder and a tower yarder were evaluated. The productivity and the profitability of the logging operations by the machine types on a L. kaempferi stand were estimated by simulating logging processes based on bucking patterns and the results were compared. As a result, the Woodgrab short-wood logging system showed the most favorable results in terms of skidding productivity and operating cost. On the contrary, the system was the least profitable among the three logging methods. Main reason is that while the system may be beneficial in terms of operation productivity, it is restricted to produce only short logs mainly for low quality raw materials such as pulp, bolts, etc. which are sold at cheap prices.

A Study on Analyzing the Live Skyline Cable Logging Mechanics (유동식 가선집재시스템 Live Skyline의 역학분석에 관한 연구)

  • Chung, Joo Sang;Chung, Woo Dam
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.3
    • /
    • pp.357-364
    • /
    • 1994
  • In this paper, the characteristics of cable logging systems, of which skyline length is adjustable during operation are discussed from a standpoint of system geometry. Among the cable logging systems, the live skyline is the typical one, of which operation is easy to understand. To analyze the cable logging mechanics of the live skyline, computer models were developed. In developing the computer models, the concept of the live skyline operation was classified into 'true live skyline' and 'live skyline with lift'. The former assumes to adjust skyline length continuously to maintain the skyline clearance over ground constant during inhaul ; the latter assumes to shorten the skyline length only to keep the minimum skyline clearance during inhaul. The computer model was used in investigating the mechanical efficiency and the operational characteristics of the live skyline system. First, the payload capability of live skyline was compared with that of standing skyline. Second, the effect of the change in the log-drag geometry on the payload capability of live skyline was investigated. Finally, the payload capability of live skyline with lift was compared with that of true live skyline as an effort to explain the concepts of true live skyline and live skyline with lift.

  • PDF

LSTM algorithm to determine the state of minimum horizontal stress during well logging operation

  • Arsalan Mahmoodzadeh;Seyed Mehdi Seyed Alizadeh;Adil Hussein Mohammed;Ahmed Babeker Elhag;Hawkar Hashim Ibrahim;Shima Rashidi
    • Geomechanics and Engineering
    • /
    • v.34 no.1
    • /
    • pp.43-49
    • /
    • 2023
  • Knowledge of minimum horizontal stress (Shmin) is a significant step in determining full stress tensor. It provides crucial information for the production of sand, hydraulic fracturing, determination of safe mud weight window, reservoir production behavior, and wellbore stability. Calculating the Shmin using indirect methods has been proved to be awkward because a lot of data are required in all of these models. Also, direct techniques such as hydraulic fracturing are costly and time-consuming. To figure these problems out, this work aims to apply the long-short-term memory (LSTM) algorithm to Shmin time-series prediction. 13956 datasets obtained from an oil well logging operation were applied in the models. 80% of the data were used for training, and 20% of the data were used for testing. In order to achieve the maximum accuracy of the LSTM model, its hyper-parameters were optimized significantly. Through different statistical indices, the LSTM model's performance was compared with with other machine learning methods. Finally, the optimized LSTM model was recommended for Shmin prediction in the well logging operation.

An Analysis of the Operational Productivity and Cost for the Utilization of Forest-biomass(II) - the Analysis of Operational Cost - (산림바이오매스 이용을 위한 산림작업 공정 및 비용 분석(II) - 작업비용 분석 -)

  • Mun, Ho-Seong;Cho, Koo-Hyun;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.2
    • /
    • pp.230-238
    • /
    • 2015
  • This study was analyzed the operational cost of logging and chipping operations in order to develop the efficient logging operation system for the utilization of forest-biomass. Analysis of the operational cost of logging operation systems, the operation system D which include chain saw, tower-yarder, mini-forwarder and truck was calculated the lowest cost to be $68,498Won/m^3$. In the utilization of forest-biomass, the operation system E which include chipping by mini-chipper at the site, forwarding of chips by mini-forwarder, transportation of chips by truck was estimated to be 90,770 Won/Ton. Thus, These results are determined as an effective operating system for logging operation and the utilization of forest-biomass.

Application of GIS for Selection of Logging Operation Machine (벌출작업 기종의 선정을 위한 GIS 활용)

  • Jeon, Kwon-Seok;Ma, Ho-Seop
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.6 no.1
    • /
    • pp.85-97
    • /
    • 2003
  • This study was aimed at suggest a proper logging method of mountain forest using geographic information system(GIS) based on digital terrain model(DTM) in the National Forest at Mt. Kumsan in Namhae-gun, Gyungsangnam-do, which has about 2,948 ha in area. The areal percentage of 201 to 250m in the elevation was about 15.5%, elevation of 251 to 300m was 14.5%, and 78.75% for higher than 400m. The accumulated areal percentage of below 30% in the gradient was 17.2%, and 81.0% for steeper than 60%. The area for tractor skidding was 17.2%(511.7ha), the area for tractor attached winch skidding was 63.8%(1,896.3ha) and 18.4%(545.5ha) for cable yarding. It is important to choose the proper logging machines for timber harvesting. In general, the selection of logging operation system was affected several major environmental factors like as terrain conditions(slope gradient, slope length) and stand factors. The rate of middle slope gradients in terrain conditions showed higher than that of steep slope gradients in this area. Therefore, it considered that the logging operation system in this area could apply to tractor+winch operating machine according to terrain conditions.

  • PDF

Progression of Restoration of Soil Physical Properties and Vegetation in Logging Roads - In Case of 9 Years Results after Construction of Logging Road - (벌채지내(伐採地內) 운재로(運材路)의 토양물리성(土壤物理性) 및 식생(植生)의 회복과정(回復過程) - 운재로(運材路) 개설(開設)이후 9년 경과의 경우 -)

  • Woo, Bo-Myeong;Kim, Kyung-Hoon;Park, Jae-Hyeon;Choi, Hyung-Tae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.1 no.1
    • /
    • pp.18-27
    • /
    • 1998
  • To investigate the restoration progression on soil physical properties and vegetation at the surface of logging road affected by timber harvesting operation. This study was carried out at logging roads constructed from 1989 to 1994 in Mt. Baekwoon, Kwangyang, Chollanam-do. Judging from the analysis of soil hardness, there were significant changes in the depth of soil between 5 and 10cm. Soil hardness was recovered from the compacted condition to the natural forest condition after 9 years passed. Soil macroporous ratio (pF2.7) of topsoil was higher than that of deep soil. Soil moisture retention of topsoil was more improved than that of deep soil. From the view of soil bulk density, the necessary time for recovering to the undisturbed condition of forest soil was about 10 years in the logging road left. Soil physical properties such as soil bulk density and porous ratio were recovered as time passed. Improved soil physical properties promoted the plant recovery on the logging road surface. The dominant species on the logging roads were Comus kousa, Prunus sargentii as overstory species, Rubus crataegifolius, Lespedeza bicolor as understory species, and Saussurea gracilis, Pteridium aquilinum var. latiusculum as herbaceous species. The plant recovery of bank-slopes was faster than that of cut-slopes and road surface. In progress of year, average plant coverage were 70 to 90% in cut- and bank-slopes and 30 to 60% on the logging road, surface which was elapsed 9 years after logging road construction. Therefore, additional planting and seeding work could be effective to the soil condition and vegetation restoration.

  • PDF