Optical fiber is indispensable for optical communication systems that transmit large volumes of data at high speed, but super precision technology in sub-micron units is required for optical axis adjustment. We developed the automatic optical fiber by image processing and automatic loading system. we have developed 6-axis micro stage system for I/O optical fiber arrays, the initial automatic aligning system software for a input optical array by the image processing technique, fast I/O-synchronous aligning strategy, the automatic loading/unloading system and the automatic UV bonding mechanism. In order to adjust the alignment it used on PC based motion controller, a $10{\mu}m$ repeat-detailed drawing of automatic loading system is developed by a primary line up for high detailed drawing. Also, at this researches used the image processing system and algorithm instead of the existing a primary hand-line up and fiber input array and waveguide chip formed in line by automatic.
Multiple robotics systems with several sub-chains have a characteristic that grasp a common object with internal loading not to loose the grip. The investigation for the internal loading of a triple manipulator has been few as compared to a dual manipulator. In this paper, type of the internal loading for a triple manipulator system is investigated through analysis of the null space of the system. Several types of the internal loading are shown for general planar and spatial type triple robots, which rigidly grasp the common object. The general scheme is applied to analysis of the internal loading for the three-fingered and three-legged robots having a point contact with the grasped object.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.2
/
pp.1-10
/
2016
In this paper, we present a new way to derive the mean cycle time of the G/G/m failure prone queue when the loading of the system approaches to zero. The loading is the relative ratio of the arrival rate to the service rate multiplied by the number of servers. The system with low loading means the busy fraction of the system is low. The queueing system with low loading can be found in the semiconductor manufacturing process. Cluster tools in semiconductor manufacturing need a setup whenever the types of two successive lots are different. To setup a cluster tool, all wafers of preceding lot should be removed. Then, the waiting time of the next lot is zero excluding the setup time. This kind of situation can be regarded as the system with low loading. By employing absorbing Markov chain model and renewal theory, we propose a new way to derive the exact mean cycle time. In addition, using the proposed method, we present the cycle times of other types of queueing systems. For a queueing model with phase type service time distribution, we can obtain a two dimensional Markov chain model, which leads us to calculate the exact cycle time. The results also can be applied to a queueing model with batch arrivals. Our results can be employed to test the accuracy of existing or newly developed approximation methods. Furthermore, we provide intuitive interpretations to the results regarding the expected waiting time. The intuitive interpretations can be used to understand logically the characteristics of systems with low loading.
Son Maeng Hyun;Jeon Im Gi;Jo Jae-Yoon;Moon HaeYoung
Fisheries and Aquatic Sciences
/
v.2
no.1
/
pp.52-57
/
1999
Air-drived rotating biological contactor (RBC) system, which is effective method in filtering performance, was tested for the nitrification capacity in a recirculating system. At ammonia concentrations between 0.029 and 0.528 mg/l, the effect of ammonia loading rate on ammonia removal rate at three different hydraulic loading rates could be defined by the following firstorder regression models: Hydraulic loading rate of $14.8 m^3/m^3/day:\;y=39.2\times+3.4 (r^2=0.9137)$, Hydraulic loading rate of $26.5 m^3/m^3/day: y=53.3\times+4.0 (r^2=0.8686)$, Hydraulic loading rate of $37.3 m^3/m^3/day: y=58.4\times+4.2 (r^2=0.7755)$, where, $\times$ is ammonia loading rate (mg/l), y is ammonia removal rate $(g/m^3/day)$, The equations showed the optimal ammonia removal rate at the hydraulic loading rate of $26.5m^3/m^3/day$. Below the ammonia concentration of 2.72 mg/l, first-order regression models between ammonia loading rate and ammonia removal rate at three different rates of speed are defined as follows: Rotational speed of $0.75 rpm: y=28.5\times+4.7 (r^2=0.9143)$, Rotational speed of $1.0 rpm: y=33.6\times+8.4 (r^2=0.9534)$, Rotational speed of $2.0 rpm: y=28.9\times+3.6 (r^2=0.9488)$, where, x is ammonia loading rate (mg/l), y is ammonia removal rate $(g/m^3day)$. The equations show the ammonia removal rate at the rotational speed of 1.0 rpm is significantly higher than that at the rotational speed of either 0.75 rpm or 2.0 rpm (P<0.05).
Journal of the Korea institute for structural maintenance and inspection
/
v.13
no.5
s.57
/
pp.142-148
/
2009
This paper is to investigate the fracture behavior characteristics of box culvert and incremental crack width of upper slab for the incremental loading by the 3-axis loading system. In the 3-axes loading system, loading directions are upper side, left and right side which simulate earth pressure and static traffic load. With the incremental load, crack patterns is investigated on the upper slab, left and right wall. Especially, on the upper slab, crack width is measured by crack gage. Based on the experimental results, structural internal force indices of box culvert are estimated quantitatively.
Journal of the Korean Society of Industry Convergence
/
v.5
no.1
/
pp.65-74
/
2002
This paper intends to investigate such effects through experiments. The contents of the investigation are effects of position of repeated loading and unloading, passing frequency. For the purpose of the investigation an experimental load-deflection system is developed and the system is possible to measure deflection of the wall and earth pressure due to different size of strip loading and cyclic loading. The findings from the experiments are as follows: 1. As repeated loading approaches to the wall, the measured horizontal residual earth pressure agrees well with Rowe's empirical formula, while as the loading is far from the wall the earth pressure consists with Boussinesq's and Spangler's formulas. Also it is found that below 0.6m depth from ground surface the effects of repeated loading can be nearly neglected. 2. From comparison analyses of earth pressure theories and experimental results, a reagression equation is suggested herein, and earth pressure at any depth and maximum earth pressure due to cyclic loading can be estimated from the equation.
The shipbuilding scheduling has many possible alternatives because of its long time horizon and a lot of jobs, so it is required that the scheduling system can generate and search feasible alternatives rapidly. The scheduling in the assembly shop is initiated by allocating, namely loading, the assembly blocks to each shop. In this step, the resource capacities (such as available man/hour, available crane) of each shop must be considered. The result of loading without above consideration can make the scheduling result based on that infeasible or worse one. In this paper, we developed the optimal scheduling system of shipbuilding, specifically for loading and scheduling of assembly block, using ILOG Solver/Scheduler. ILOG Solver/Scheduler is a general-purposed commercial software which supports to find a feasible or optimal solution using object oriented technique and constraints satisfaction programming, given constraints and objectives. Also, in order to enhance the system performance, we conducted various experiments of ILOG search strategies. The experimental results showed that the impact of search strategies is significant.
Kim, Jin Weon;Kim, Jong Sung;Kim, Yun Jae;Kweon, Hyeong Do
Transactions of the Korean Society of Pressure Vessels and Piping
/
v.13
no.1
/
pp.16-39
/
2017
This paper reviewed and summarized the experimental studies conducted during last three decades to evaluate the structural integrity and to establish the acceptance criteria for piping system of nuclear power plants (NPPs) under seismic loading condition. These experimental studies contain the results of large-scale piping system tests under excessive seismic loading as well as standard specimen tests, simplified piping specimen tests, and piping components tests under simplified dynamic and cyclic loading. These would be useful as a basis for establishing integrity assessment procedure and acceptance criteria for piping systems of NPPs under beyond design basis earthquake (BDBE) conditions, and also could be used in planing the scope and direction of further related researches.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.5
/
pp.750-756
/
2017
This paper presents a method for DC voltage control of HVDC system connection of offshore wind farms. In the event of fault in AC grid, HVDC system need to meet LVRT regulations. When HVDC system meet LVRT regulation, unbalance is caused between power input and power output for DC link. Therefore, LVRT regulation lead to DC voltage increase of HVDC system. To control the DC voltage increase, the chopper resistor can be suggested. In this paper, DC voltage suppression is proposed using chopper resistor and de-loading. The effectiveness of the chopper resistor was verified using PSCAD/EMTDC.
Kim, Kyung-Su;Son, Choong-Yul;Shin, Hyun-Il;Lee, Man-Sik
Journal of Ocean Engineering and Technology
/
v.13
no.2
s.32
/
pp.18-25
/
1999
Western coastal ports of Korea experience severe tidal range with up to 9.7 meter between high and low tides. The significant water level variation implicates many operational difficulties during loading and un-loading from cargo ships. To overcome problems due to tide and to secure the continuous loading operation, a new loading system for container cargo called "container pallet system" is developed and introduced in the paper. Three types of structure forms, offshore structural deck, double bottom structural form and the mixed form, are inverstigated with MSC/NASTRAN software. The results prove that the mixed type structure with truss enforcement is found to be the most appropriate for the region.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.