Korean Journal of Construction Engineering and Management
/
v.8
no.1
s.35
/
pp.150-158
/
2007
The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.458-461
/
2006
With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.
Kim, Kyong Ju;Kim, Kyoungmin;Kim, Jong Inn;Wei, Ameng;Kim, Eu Wang
Korean Journal of Construction Engineering and Management
/
v.24
no.1
/
pp.12-20
/
2023
To calculate the amount of owner-caused and contractor-caused delays based on a simplified delay analysis, which has been customarily used in Korea, has a limitation in reflecting the impact of the concurrent delay and the acceleration work. It also resulted in the apportionment of liquidated damages by applying the ratio of the number of delays between the owner and the contractor. This study analyzes that the conventional method does not meet the international standards. In order to improve the problem of construction delay analysis and the apportionment of liquidated damages based on it, owner delays, contractor delays, concurrent delays, and the impact of acceleration should be analyzed together. This study suggests that in the apportionment of liquidated damages, the extension of time should be extended by the sum of concurrent delays and the owner-caused delays, and liquidated damages should be imposed on delays incurred after the extension of time. It can be seen that it conforms to the international standards. The results of this study are expected to contribute to improving the problems of delay analysis and liquidated damages calculation, which have been conventionally accepted.
Proceedings of the Korean Institute of Building Construction Conference
/
2002.11a
/
pp.111-116
/
2002
The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.
International conference on construction engineering and project management
/
2015.10a
/
pp.718-719
/
2015
As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.
As to the sphere of application, Article 78 CISG undoubtedly applies to interest on the purchase price. Furthermore, the provision also applies to "any other sum that is in arrears". This language has been interpreted to encompass expenses that one party had on behalf of the other as well as reimbursements when the purchase price is reduced according to Article 50 CISG. However, it is questionable whether this language also extends to claims for damages. Legal scholars seem to agree that one has a right to interest on damage claims under Article 78 if the amount in question has been liquidated vis-a-vis the other party. Whether this right to interest also applies to unliquidated sums, is controversial, however. In this study, as a result of taking into account the puspose of Article 78, we could find the fact that regardless of whether the exact amount of damages has been specified yet, the breaching party still owes compensation to the other party from the time of the breach and, accordingly, the non-breaching party should be entitled to interest payments on the loss from that time. Consequently, Article 78 applies not only to liquidated but also to unliquidated damages.
The purpose of this paper is to examine the viewpoints of the different legal systems for the validity of LD Clause and the possibility of gap-filling function of UNIDROIT Principles in International Sales Contract. The results of comparative study between common law system and civil law system, and between CISG and UNCDROIT Principles is as follows: First, common law system distinguishes LD Clause and Penalty Clause, but civil law system including Korean law does not strictly distinguish the difference between them, provided that the liquidated damages are not grossly excessive. Second, CISG does not concerned with the validity of LD Clause but entrust this matter to the law applicable by virtue of the rules of private international law; conversely the Principles follow similar position of civil law system. The possibility of gap-filling of the Principles is more positive in the case of arbitration than in the case of litigation. On the basis of above study, I also checked the LD Clauses of ICC Model International Sales and the Model Contracts of Korean Commercial Arbitration Board. The LD Clauses of there two Model Contract seem very appropriate and reasonable for the reference in practical application. The appropriate, not excessive, LD Clause will contribute not only to eliminate the burden of proof for the actual damages, but also to enforce both parties to perform their obligations in their contracts. Therefore, When we make contract, we should keep in our mind to insert the reasonable and appropriate LD Clause in the sales contract. If not, so to speak, litigated damages are grossly excessive, the Clause may be invalid in some legal system.
Journal of the Korea Institute of Information and Communication Engineering
/
v.17
no.4
/
pp.1034-1041
/
2013
Liquidated Damages is damages that have to be paid when a debtor could usually work off that which they owe, but didn't due to causes imputable. However, currently the Defense Acquisition Program Administration contracts with domestic businesses in case of delay of implementation occurs; they have to pay damages of deferment unlimitedly as a penalty concept, not in compensation about delay. With this in account, conflicts between the two continuesly happen. DAPA wastes administration and counter business costs increasingly burdening their budget. Defense and military procurement need to revise the compensation of deferment system. This paper analyzes the problems about that system, which is applied to domestic business, and also compares it with that of industrialized countries and suggests measures of set price caps in compensation of the deferment system.
This study compares the SGA and CISG to find out the difference of the criteria for calculating damages. and it intends to give some important points in trade practice. The damages is intended to compensate the victim for the breach of contract but there are differences between SGA and CISG as follow. First, the SGA and CISG have the same purpose of claiming damages. Both laws and regulations are subject to a full indemnification to compensate for the breach of the contract by the amount equivalent to the loss suffered by the victim. Second, in the general principle related to the calculation of damages, both law enforcement officials are required to be able to predict damages caused by breach of contract. In the case of SGA, however, a foreseeability test or remoteness of damages is required for the relationship between the contract violation and the loss. In other words, it can be said that the causal relation between the contract violation and the damage is strictly applied rather than the CISG. Finally, both laws and regulations of SGA and CISG have a big difference in criteria for calculating damages. In the CISG, after the contract is canceled, it is classified according to the existence of the alternative transaction and the damage amount is calculated based on the contract price. On the other hand, the SGA estimates the loss based on the market price at the delivery of the goods, reflecting the change in the market price instead of the contract price of the goods.
The purpose of this paper is to examine the problems in exercising buyer's right to claim damages for the breach of contract by the seller in international sales contract and to suggest reasonable counter-measures. The main contents are as follows: First, this author analyzed the principles of the seller's liability for damages in detail and examined the methods for the calculation of damages on the basis of Arts.74~77. As these articles are found to be insufficient in practical application, this author further examined the UNIDROIT Principles(2004) to confirm whether these Principles can fill the gaps of CISG or not, which turned out their gap-filling functions. Second, this author tried to find any expected problems when the buyer resorts to the right to claim damages in case of the seller's breach of contract including the estimation of damages, the burden of proof, causation, the proof of appropriateness for avoidance, the proof of buyer's obligation to mitigate the loss and so on. The reason is that these problems may cause a lot of difficulties in real business. As result, many buyers have given up their reasonable rights to claim damages so far. Finally, from the buyer's perspective, this author would like to suggest a liquidated damage clause(LD Clause) which gives the buyer to received a specified sum in case of seller's non-performance and/or a demand guarantee(or standby L/C) which guarantees buyer to secure unconditional payment independent of the underlying contract. For these purposes, the buyer should try to insert the LD Clause and/or Guarantee Clause in the contract when the buyer and the seller negotiate the sales contract. Also there are a lot of considerations and limitations in using the LD Clause and the Guarantee Clause in their real business, mainly dependent up bargain power between the seller and the buyer, for which this author promise to examine in detail in the future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.