• 제목/요약/키워드: line load

검색결과 1,857건 처리시간 0.032초

전략적 수요반응이 송전선 혼잡의 시장지배력에 미치는 영향 (Demand Response Effect on Market Power with Transmission Congestion in Electricity Market)

  • 이광호
    • 전기학회논문지
    • /
    • 제66권12호
    • /
    • pp.1705-1711
    • /
    • 2017
  • This paper analyzes the impact of DRA (Demand Response Aggregator) on market power when competing with power generation companies (Gencos) in the electricity market. If congestion occurs in the transmission line, the strategic choice of the power generation company increases exercise of market power. DRA's strategic reduction of power load impacts the strategy of Gencos, which in turn affects the outcome of the load reduction. As the strategy of Gencos changes according to the location of the congested transmission line, the impact on the market depends on the relative location of the congested line and the DRA.

급전방식에 따른 급전선로의 전송용량 예측 (Estimation of the Feeding Line Capacity according to Feeding Mehtod)

  • 이장무;이한민;오세찬;김길동;장길수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.1169-1170
    • /
    • 2007
  • The primary objective of this paper is to examine the capacity of electrical transmission in electric railway according to the type of feeding system. Although supply capacity of railway substation are sufficient and there is no accident, due to the electrical transmission limit of feeding line the voltage breakdown may occur when large capacity of electric load at feeding line exist. So, using multi-port analysis model, we draw P-V curve due to feeding method, load, location and power factor of electric locomotive.

  • PDF

가공 송전 철탑기초 설계 및 시공 방법 연구 - 심형기초를 중심으로 - (A Study on the Transmission Tower Foundation Design and Construction Method - A Focus of Cylindrical Foundation -)

  • 장석한;김희광;이강현;한경수;함방욱;정기선
    • 전기학회논문지
    • /
    • 제56권6호
    • /
    • pp.1031-1034
    • /
    • 2007
  • Electric transmission lines pass through a variety of area. Foundation supporting the conductors and tower are selected properly in accordance with external load, for example dead load, wind load, snow load, construction load etc, and topography and geology condition. Typical types of foundation are as follows: pad foundation for small load and hard soil or rock in mountainous area, pile foundation for medium or large load and soft soil in plain field area. This paper introduced cylindrical foundation design & construction for large load and mountainous area. This foundation failure mode against pulling-out show splitting failure by tensile force toward circumferential direction.

765[㎸] 변전소 시뮬레이터를 위한 조류계산 프로그램에 관한 연구 (A Study on the Load Flow Program for 765[㎸] Substation Simulator)

  • 여상민;김철환;이종포
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권4호
    • /
    • pp.201-206
    • /
    • 2003
  • Power system is analyzed by three methods of load flow, fault calculation, and voltage stability. Among there, load flow is calculated to flow of power in power in system at steady state. But, load flow is difficult to analyze to flow of power in substation, because power flow frequently alter by various equipments such as circuit bleaker, disconnect switch and shunt reactor. Particular, in 765[㎸] system, because of form of 1.5GB for stable operation, structure of substation has been very complex. In this paper, we describe technique for application of load flow algorithm in simulator for 765[㎸] substation. For this technique, we built each database for various equipments and considered form of 1.5GB Data as form of bus and line, for application of load flow, are acquired from built database, and then calculate load flow in substation. And. results of load flow are outputted in screen of operator console program.

용량성 부하를 고려한 옥내 전력선 채널 특성 측정 (Measurement of Indoor Power Line Channel Characteristics Considering Capacitive Loads)

  • 허윤석;홍봉화;김철;전계석;이대영
    • 대한전자공학회논문지TC
    • /
    • 제42권6호
    • /
    • pp.53-60
    • /
    • 2005
  • 옥내$\cdot$외의 전력선 환경에 대한 정확한 채널 모델링에 관한 노력이 최근에 이루어지고 있다 알려진 일반 제한과 발표된 모델들은 특별한 형태의 접근들이었다. 본 논문은 더 신속하고 효율적인 전력선 통신 실험을 위한 전력선 채널 특성 측정에 관한 연구이다. 용량성 부하 시뮬레이터는 전력선 옥내 망 모뎀 개발에 필수적인 장비이다. 총 2:H가지 경우의 용량성 부하 변화에 대한 주파수 응답 특성 측정으로 채널 데이터 베이스화를 수행하였다. 본 측정 실험에서 전력선통신 채널은 보다 더 확정적인 매체라는 것을 확인하였다.

부하역률 제약조건을 고려한 최적 급전 알고리즘 (The Optimal Power Flow Algorithm Considering Load Power Factor Limits)

  • 김광욱;조종만;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권9호
    • /
    • pp.494-499
    • /
    • 2004
  • This paper presents to compute the power economic dispatch, an optimal power flow (OPF) computation algorithm, considering the load power factor limits constraint in developed. Efficient reactive power planning enhances economic operation as well as system security. Accordingly, an adequate level of power factor limits for the load busesshould be evaluated for economic operation. In this paper, the ranges of acceptable load power factors are portrayed as bandwidths of load power factor expressed as a function of load level. The load power factor limits are included and described into the OPF's objective function. The method Proposed is applied to IEEE 26 bus system.

보강재의 탈락 방지 방안 연구 (A Study on Prevent Delamination of Strengthening Material)

  • 한만엽;백승덕
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1998년도 가을 학술발표대회 논문집(III)
    • /
    • pp.809-814
    • /
    • 1998
  • Recently many cases that using strengthening method with a steel plate or carbon-fiber sheet in a construction field are increasing. In this reason, it is demanded that developing a plan of preventing delamination of strengthening material. So in this research, for the case of strengthening method of steel plate, it is made use of notch and anchor bolt and for the case of carbon fiber sheet, it is made use of notch, anchor bolt, line anchor and shear strengthening. After all the cases were applied, we made 15 specimen beams. The beams was measured and analyzed about the behavior property of strengthened beams, the ability strengthening method, the relation between load and the shape of failure, the crack load, the yield load, the shape of crack pattern, the increasing rate from yield load and maximum load and the strain of rebar. All the strengthening methods results in almost same value until the yield load, and it wasn't quite different from the theoretical value. But for the case of increasing rate from the yield load and maximum load, comparing with the existing method, the new strengthening methods are proved to be profitable about the safety.

  • PDF

하이브리드 방식에 의한 미시적 부하모델링 (Component-Based Load Modeling Updated by Hybrid Technique)

  • 지평식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권3호
    • /
    • pp.179-182
    • /
    • 2003
  • Component-based method for load model not only should include the performances of the load components, but also should take into consideration the core losses of transformers, the line losses and the capacitor banks. Especially, capacitor bank affects the accuracy of reactive load model in load modeling. But it is difficult to identify actual reactive powers of capacitor banks in power system for load modeling. This research improves the component-based modeling method including uncertain capacitor bank. The proposed method is hybrid technique, which adds the measurement-based method to the existing component-based method for reliable information of capacitor band. The results of case studies were presented to verify the validity of the proposed method.

전력선 Modem과 Telephone을 이용한 가정 자동화 시스템의 실현 (Home Automation Implementation using Power Line Modem and Telephone)

  • 최승지;김한수;박종연
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2001년도 하계종합학술대회 논문집(5)
    • /
    • pp.43-46
    • /
    • 2001
  • This paper has been studied a implementation Home Automation by PLM and Telephone system. The PLM is composed of FSK IC-chip and the circuit for the power line communication. In this paper load control was made with PIC16F84A and its communication speed was 1200 baud rates.

  • PDF

국내 전력계통 안정화를 위한 다단계 부하차단 제어전략 수립에 관한 연구 (A Study on Multi Level Load Shedding Control Scheme Strategy for Stabilization of the Korean Power System)

  • 이윤환
    • 전기학회논문지P
    • /
    • 제65권4호
    • /
    • pp.255-261
    • /
    • 2016
  • Korean Power System are operating a load shedding system to prevent voltage instability phenomenon caused by severe line contingencies. In order to apply the load shedding scheme should be selected a location, amount, delay time. Current load shedding system is load shedding amount that has been calculated in the steady-state analysis to load shed the total amount in first level, load shedding amount calculated in advance, it is possible to perform an unnecessary load shedding. In this paper, set a multi-level load shedding control strategy step-by-step selection of load shedding amount for the prevention of excessive load shedding. In addition, through a voltage resilience analysis of the power system by applying motor load ratio and sensitivity parameter to selection the multi level load shedding ratio and delay time. For this reason, to take advantage of the limit data of interchange power, by utilizing interface power flow data to set a multi-level load shedding control strategy for the stabilization of the Korean Power System.