• Title/Summary/Keyword: life cycle management

Search Result 1,504, Processing Time 0.024 seconds

Analysis on the Determinants of Land Compensation Cost: The Use of the Construction CALS Data (토지 보상비 결정 요인 분석 - 건설CALS 데이터 중심으로)

  • Lee, Sang-Gyu;Seo, Myoung-Bae;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.461-470
    • /
    • 2020
  • This study analyzed the determinants of land compensation costs using the CALS (Continuous Acquisition & Life-Cycle Support) system to generate data for the construction (planning, design, building, management) process. For analysis, variables used in the related research on land costs were used, which included eight variables (Land Area, Individual Public Land Price, Appraisal & Assessment, Land Category, Use District 1, Terrain Elevation, Terrain Shape, and Road). Also, the variables were analyzed using the machine learning-based Xgboost algorithm. Individual Public Land Price was identified as the most important variable in determining land cost. We used a linear multiple regression analysis to verify the determinants of land compensation. For this verification, the dependent variable included was the Individual Public Land Price, and the independent variables were the numeric variable (Land Area) and factor variables (Land Category, Use District 1, Terrain Elevation, Terrain Shape, Road). This study found that the significant variables were Land Category, Use District 1, and Road.

Consecutive Design VE Process Emphasized on Follow-up Activities (Follow-up 활동을 강조한 연속적 설계VE 프로세스)

  • Yang, Jin Kook;Moon, Sung Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.235-244
    • /
    • 2009
  • Design Value Engineering (VE) has become an import part of the daily design process since it has been introduced in the construction industry. Design VE is usually conducted in the general and execution design stages respectively. In order to increase the effectiveness of the VE process, the outcome from the general design VE activities should be integrated into execution design. The outcome from the execution design should be used again for construction. In this study, a consecutive VE process model has been presented as a way to improve the current practice of design VE activities in the construction industry. In the presented model, follow-up activities are emphasized to increase values from the life-cycle perspective of a construction project. The model was tested in a case study of an actual design VE process. The result of the study demonstrates that the model can: 1) effectively incorporate owners requirements; 2) assist decision making in selecting better construction; 3) increase the interface between general and execution design stages; and 4) trace the value flow more efficiently. Overall, the study results indicates that a the consecutive VE process model can be effectively applied when construction project are contracted for the life-cycle management of construction projects.

A Study on the MOT of Household Telecommunication Services: The Effects of MOT Experience and Service Quality on Product Evaluations across Different Phases of the Product Life Cycle (국내 가구기반 통신서비스의 고객접점에 관한 연구: PLC단계별 접점경험과 서비스품질의 상대적 영향)

  • Son, Minhee;Han, Kyesook;Lim, Hyoyeol
    • Asia Marketing Journal
    • /
    • v.11 no.3
    • /
    • pp.91-124
    • /
    • 2009
  • With the intensity of competition and the standardization of technical attributes in telecommunications service market increasing, differentiated activity and customer experience in service encounter is regarded as an important means for creating customer value, however, there is a dearth of good literature examining what MOT activity is composed of according to consumption chain, and how service quality of MOT has influenced customer performance. Especially there exist various services across different phase of Product life cycle(PLC) in household telecommunication service market, customer requirement for MOT might depend on whether its phase is introduction-growth stage or maturity-decline stage, the empirical study is completely lacking. This study classified household telecommunication services into two types by PLC, VOIP and IPTV as Introduction-growth stage services, Internet and PSTN as maturity-decline stage service, and investigated whether there exists a gap between service types in how consumer have experienced MOT, what they consider as important and the relative importance of quality dimension how service quality of MOT has influence on consumer performance. The empirical result from 858 participants shows that there is a difference in consumer experience and requirements across different phases of the PLC, tangibles and assurance are regarded as the most important service quality factors which have a positive influence on customer performance (consumer satisfaction, repurchase intention and word of mouth) at the introduction-growth stage, whereas, reliability, empathy and interactivity are at the maturity-decline stage. Finally, managerial implication is made, limitation is clarified and a direction for further studies is suggested.

  • PDF

Stochastic Disaggregation and Aggregation of Localized Uncertainty in Pavement Deterioration Process (포장파손과정의 지역적 불확실성에 대한 확률적 분해와 조합)

  • Han, Daeseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1651-1664
    • /
    • 2013
  • Precise analysis on deterioration processes of road pavements is not so simple matter due to severe uncertainty originated from a lot of explanatory variables engaged in. For those reasons, most analytical models for pavement deterioration prediction have often preferred to probabilistic approaches than deterministic models. However, the general probabilistic approaches that treat overall characteristics of population or entire sample would not be suitable for providing detail or localized information on their changing process. Considering the aspects, this paper aimed to suggest a stochastic disaggregation method to analyze the localized deterioration speeds and its variances changed by time and condition states. In addition, life expectancies and their uncertainty were estimated by probabilistic algorithm using the disaggregated stochastic process. For an empirical study, pavement inspection data (crack) accumulated from 2003 to 2010 from Korean national highway network was applied. This study can contribute to securing reliability of life cycle cost analysis, which is one of the primary analyses in road asset management, with much advanced deterioration forecasting functions. In addition, it would be meaningful trials as fundamental research for preventive maintenance strategy that demands essential understanding on changing process of the deterioration speed of pavement.

A Technology Readiness Level (TRL) Management using the Systems Engineering Tool for the Space Launch Vehicle (시스템엔지니어링 전산관리도구를 활용한 우주발사체 기술완성도(TRL) 관리)

  • Jang, Jun Youk;Kwon, Byung Chan;Lim, Chang Young;Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.1
    • /
    • pp.18-24
    • /
    • 2020
  • The KSLV-II project with high difficulties technically requires thorough technical management during long-term life cycle more than 10 years for launching into space. The TRL is a quantitative indicator developed by NASA widely used all over the world to measure technology maturity of a system development objectively and consistently. The TRL is also used to make sure technology level and to establish a future direction in the KSLV-II project. The TRL has advantage enable to identify a technology level through quantitative indicators. However, it takes a lot of efforts such as trials and errors, time and cost to apply it to the project considering the project environments, and stakeholder needs. These include not only to establish TRL management plan from ideal, conceptual and abstractive standards/guidelines such as NASA's, but also to construct TRL management environment enable to apply and manage harmoniously. In the KSLV-II project, it is required to figure out current technology level and technology development trend in the future, to access conveniently, to share related data in real time, and to update periodically for the comprehensive TRL management. From the reason above, the TRL management environment was built by using the systems engineering tool already has been used for other system management data such as requirements in the project. It also could be accomplished a practical management basis of systems engineering from the traceability among system management data including TRL. In this paper, case study results are introduced to manage the TRL for the space launch vehicle using the systems engineering tool in the KSLV-II project.

An Analysis of Core Competency of Construction Field Engineer for Cost Management (건설기술자의 원가관리 업무역량 분석 연구)

  • Choi, Jae-Hong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.26-34
    • /
    • 2013
  • Recently, many companies recognize the individual human resource as a core asset of the corporate value creation and devote a lot of effort to develop and manage competency-based human resource in order to strengthen the corporate competitiveness. As the integrated construction company taking the major portion in Korean construction industry, its construction engineers perform the construction supervision task with various related parties at each stage of the life cycle of the construction project. Therefore, the competency of a construction engineer is an important factor which have a direct impact on the success of the construction project. However, the current capability evaluation scheme of the domestic construction engineers is mainly oriented on the qualification factors such as the certificates or the seniority and this is quite different from evaluating the actual ability for construction management tasks. In this point of view, this study proposes the appropriate level of proficiency in cost management by analyzing the work process and its detailed items of the cost management that is the one of the basic management items of the construction industry. Based on this, this study analyzes the current competency level of the construction engineer by comparing with the required competency of each job position and also performs the engineer's work competency analysis of each work step.

Development Process of Systems Engineering Management Plan(SEMP) for Large-Scale Complex System Programs (대형 복합 시스템 개발을 위한 효과적인 시스템공학 관리계획 개발 프로세스)

  • 유일상;박영원
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.4
    • /
    • pp.82-90
    • /
    • 2003
  • The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders' needs throughout the entire life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management Plan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. SEMP defines technical management functions and comprehensive plans for managing and controlling the entire system development process, specialty engineering processes, etc. Especially. in the case of a large-scale complex system development program where various disciplinary engineering such as mechanical; electrical; electronics; control; telecommunication; material; civil engineering etc. must be synthesized, it Is essential to develop SEMP to ensure systematic and continuous process improvements for quality and to prevent cost/schedule overruns. This study will enable the process knowledge management on the subject of SEMP as a core systems engineering management effort, that is, definitely defining and continuously managing specification of development process about requirements, functions, and process realization of it using a computer-aided systems engineering software. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP. These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.

A Study on Electronic Transaction Records Management and Trusted Repositories (전자거래기록의 신뢰성 확보에 관한 연구 - TTPR을 중심으로 -)

  • Lee, So-Yeon;Seol, Moon-Won;Kim, You-Seung
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.12 no.2
    • /
    • pp.181-205
    • /
    • 2012
  • The study aims at providing an electronic transaction records management system based on the third party repository which do not have any interest in electronic transactions. This study reviews various articles and standards. It also discusses theoretical issues about electronic transactions and electronic transaction records. Complex characteristics of electronic transaction records are explored and management procedures are analyzed and divided into 5 stages by the life cycle and management bodies. Based on these discussions the study affirms that trustworthy third parties' interventions are essential to prevent and control potential conflicts of electronic transactions. It proposes a trustworthy electronic transaction record management system with the third party repository. Futhermore, it discusses evidence and management environment of electronic transaction records and provides cases of TTPR based on contract transaction and exchange transaction.

An Analysis on the Current Status of Maintenance System for Introducing the Asset Management System of Power Generation Companies (발전시설물의 자산관리체계 구축을 위한 전산시스템 개발)

  • Park, Jeonggwon;Yoon, Hyeongseok;Kim, Changhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.41-49
    • /
    • 2021
  • Domestic maintenance strategies are shifting from safety assessment to performance assessment, and related systems and laws are being restructured to meet those criteria. In order to introduce asset management based on performance evaluation, related evaluation methods such as performance measures and level of service should be made to evaluate performance according to the characteristics of the structure, but these are not well-prepared in Korea. In this study, we present a computerized model and system for implementing asset management that introduces techniques such as performance evaluation, life cycle cost analysis, performance measures, and level of service in conjunction with existing maintenance and safety diagnosis procedures. The features of this system consist of three modules to enable separate operations of existing maintenance, safety management and asset management. The system is designed to be used as a reference for public institutions to introduce asset management in the future.

The Development of the Standard Framework of Sports Event Process Management System (스포츠이벤트 프로세스 관리시스템 표준 프레임워크 개발)

  • Kim, Joo-Hak;Cho, Sun-Mi
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.9 no.1
    • /
    • pp.815-824
    • /
    • 2019
  • It is not easy to present a generalized operating model because the operating environment of a sport event is composed of a complex matrix structure. In this study, we propose 'standardization' which provides guidance of concept and process of sport event management to solve this sports event management problem. To purpose complete of this study, the frame was developed by the international standard ISO 9001: 2015 is applied. The standards framework for sports event process management system structure proposed in this study consists of scope of application, citing standard, Terms and definitions, organizational situation, leadership, planning, support, operation, performance evaluation, and improvement. This sport event process management system standard can be applied to any organization that wants to host, prepare, and operate sport events regardless of the form or scale of the sport event. In addition, this standard was focused on process management of life-cycle stages of sporting events, therefor it was possible to manage interrelationships and dependencies between processes and processes.